Well gauging system and method
The well gauging system and method includes two containment vessels (17, 15), a common inlet line to the vessels with divert control valves on each inlet line of the vessels being controlled by a programmable logic controller (PLC), a common outlet line to the 5 vessels, a common gas line attached t...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MEANS, STEPHEN R |
description | The well gauging system and method includes two containment vessels (17, 15), a common inlet line to the vessels with divert control valves on each inlet line of the vessels being controlled by a programmable logic controller (PLC), a common outlet line to the 5 vessels, a common gas line attached to the top of each vessel, which has low and high pressure regulators allowing control of the vessel's internal pressure, a vertical level indication device for controlling level in each vessel, a water cut meter (47) used to report water cut of the production stream, a coriolis meter (49), valves, gas cylinder, a controller for process control of well testing, storing results, and sending results to a customer's central 10 computer. The method of using two vessels (17, 15) allows more time for the emulsion to separate, thus increasing the accuracy of the oil, water, and gas measurements. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_AU2009339711BB2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>AU2009339711BB2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_AU2009339711BB23</originalsourceid><addsrcrecordid>eNrjZJALT83JUUhPLE3PzEtXKK4sLknNVUjMS1HITS3JyE_hYWBNS8wpTuWF0twMKm6uIc4euqkF-fGpxQWJyal5qSXxjqFGBgaWxsaW5oaGTk5GxkQqAwDBJiW0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Well gauging system and method</title><source>esp@cenet</source><creator>MEANS, STEPHEN R</creator><creatorcontrib>MEANS, STEPHEN R</creatorcontrib><description>The well gauging system and method includes two containment vessels (17, 15), a common inlet line to the vessels with divert control valves on each inlet line of the vessels being controlled by a programmable logic controller (PLC), a common outlet line to the 5 vessels, a common gas line attached to the top of each vessel, which has low and high pressure regulators allowing control of the vessel's internal pressure, a vertical level indication device for controlling level in each vessel, a water cut meter (47) used to report water cut of the production stream, a coriolis meter (49), valves, gas cylinder, a controller for process control of well testing, storing results, and sending results to a customer's central 10 computer. The method of using two vessels (17, 15) allows more time for the emulsion to separate, thus increasing the accuracy of the oil, water, and gas measurements.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120202&DB=EPODOC&CC=AU&NR=2009339711B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120202&DB=EPODOC&CC=AU&NR=2009339711B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MEANS, STEPHEN R</creatorcontrib><title>Well gauging system and method</title><description>The well gauging system and method includes two containment vessels (17, 15), a common inlet line to the vessels with divert control valves on each inlet line of the vessels being controlled by a programmable logic controller (PLC), a common outlet line to the 5 vessels, a common gas line attached to the top of each vessel, which has low and high pressure regulators allowing control of the vessel's internal pressure, a vertical level indication device for controlling level in each vessel, a water cut meter (47) used to report water cut of the production stream, a coriolis meter (49), valves, gas cylinder, a controller for process control of well testing, storing results, and sending results to a customer's central 10 computer. The method of using two vessels (17, 15) allows more time for the emulsion to separate, thus increasing the accuracy of the oil, water, and gas measurements.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJALT83JUUhPLE3PzEtXKK4sLknNVUjMS1HITS3JyE_hYWBNS8wpTuWF0twMKm6uIc4euqkF-fGpxQWJyal5qSXxjqFGBgaWxsaW5oaGTk5GxkQqAwDBJiW0</recordid><startdate>20120202</startdate><enddate>20120202</enddate><creator>MEANS, STEPHEN R</creator><scope>EVB</scope></search><sort><creationdate>20120202</creationdate><title>Well gauging system and method</title><author>MEANS, STEPHEN R</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_AU2009339711BB23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2012</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>MEANS, STEPHEN R</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MEANS, STEPHEN R</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Well gauging system and method</title><date>2012-02-02</date><risdate>2012</risdate><abstract>The well gauging system and method includes two containment vessels (17, 15), a common inlet line to the vessels with divert control valves on each inlet line of the vessels being controlled by a programmable logic controller (PLC), a common outlet line to the 5 vessels, a common gas line attached to the top of each vessel, which has low and high pressure regulators allowing control of the vessel's internal pressure, a vertical level indication device for controlling level in each vessel, a water cut meter (47) used to report water cut of the production stream, a coriolis meter (49), valves, gas cylinder, a controller for process control of well testing, storing results, and sending results to a customer's central 10 computer. The method of using two vessels (17, 15) allows more time for the emulsion to separate, thus increasing the accuracy of the oil, water, and gas measurements.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_AU2009339711BB2 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | Well gauging system and method |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T19%3A18%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MEANS,%20STEPHEN%20R&rft.date=2012-02-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EAU2009339711BB2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |