In-situ fluid compatibility testing using a wireline formation tester
A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore flui...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MOHAMED NAGUIB HASHEM HANI ELSHAHAWI |
description | A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore fluid is induced to flow into the test section and fluid influx into the test section is monitored; injecting a completion fluid into the test section, and inducing the completion fluid to flow into the formation; performing a second fluid influx test during which fluid pressure within the test section is reduced, completion and pore fluids are induced to flow into the test section, and fluid influx into the test section is monitored; comparing fluid influx monitoring data acquired during the fluid influx tests to determine any effects of the completion fluid on formation pore fluid influx into the test section. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_AU2008327958A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>AU2008327958A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_AU2008327958A13</originalsourceid><addsrcrecordid>eNrjZHD1zNMtziwpVUjLKc1MUUjOzy1ILMlMyszJLKlUKEktLsnMS1coLQaRiQrlmUWpOZl5qQpp-UW5QGX5eWAlqUU8DKxpiTnFqbxQmptB2c01xNlDN7UgPz61uCAxOTUvtSTeMdTIwMDC2Mjc0tTC0dCYOFUA9Bs0lQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>In-situ fluid compatibility testing using a wireline formation tester</title><source>esp@cenet</source><creator>MOHAMED NAGUIB HASHEM ; HANI ELSHAHAWI</creator><creatorcontrib>MOHAMED NAGUIB HASHEM ; HANI ELSHAHAWI</creatorcontrib><description>A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore fluid is induced to flow into the test section and fluid influx into the test section is monitored; injecting a completion fluid into the test section, and inducing the completion fluid to flow into the formation; performing a second fluid influx test during which fluid pressure within the test section is reduced, completion and pore fluids are induced to flow into the test section, and fluid influx into the test section is monitored; comparing fluid influx monitoring data acquired during the fluid influx tests to determine any effects of the completion fluid on formation pore fluid influx into the test section.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2009</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20090528&DB=EPODOC&CC=AU&NR=2008327958A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20090528&DB=EPODOC&CC=AU&NR=2008327958A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MOHAMED NAGUIB HASHEM</creatorcontrib><creatorcontrib>HANI ELSHAHAWI</creatorcontrib><title>In-situ fluid compatibility testing using a wireline formation tester</title><description>A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore fluid is induced to flow into the test section and fluid influx into the test section is monitored; injecting a completion fluid into the test section, and inducing the completion fluid to flow into the formation; performing a second fluid influx test during which fluid pressure within the test section is reduced, completion and pore fluids are induced to flow into the test section, and fluid influx into the test section is monitored; comparing fluid influx monitoring data acquired during the fluid influx tests to determine any effects of the completion fluid on formation pore fluid influx into the test section.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2009</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD1zNMtziwpVUjLKc1MUUjOzy1ILMlMyszJLKlUKEktLsnMS1coLQaRiQrlmUWpOZl5qQpp-UW5QGX5eWAlqUU8DKxpiTnFqbxQmptB2c01xNlDN7UgPz61uCAxOTUvtSTeMdTIwMDC2Mjc0tTC0dCYOFUA9Bs0lQ</recordid><startdate>20090528</startdate><enddate>20090528</enddate><creator>MOHAMED NAGUIB HASHEM</creator><creator>HANI ELSHAHAWI</creator><scope>EVB</scope></search><sort><creationdate>20090528</creationdate><title>In-situ fluid compatibility testing using a wireline formation tester</title><author>MOHAMED NAGUIB HASHEM ; HANI ELSHAHAWI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_AU2008327958A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2009</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>MOHAMED NAGUIB HASHEM</creatorcontrib><creatorcontrib>HANI ELSHAHAWI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MOHAMED NAGUIB HASHEM</au><au>HANI ELSHAHAWI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>In-situ fluid compatibility testing using a wireline formation tester</title><date>2009-05-28</date><risdate>2009</risdate><abstract>A method for performing fluid influx tests in a wellbore comprises inserting a well test device into the wellbore such that it separates a well test section from other sections of the wellbore; performing a first fluid influx test during which fluid pressure in the test section is reduced, pore fluid is induced to flow into the test section and fluid influx into the test section is monitored; injecting a completion fluid into the test section, and inducing the completion fluid to flow into the formation; performing a second fluid influx test during which fluid pressure within the test section is reduced, completion and pore fluids are induced to flow into the test section, and fluid influx into the test section is monitored; comparing fluid influx monitoring data acquired during the fluid influx tests to determine any effects of the completion fluid on formation pore fluid influx into the test section.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_AU2008327958A1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | In-situ fluid compatibility testing using a wireline formation tester |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T22%3A36%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MOHAMED%20NAGUIB%20HASHEM&rft.date=2009-05-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EAU2008327958A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |