Performing predictive maintenance on equipment

A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance facto...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: MICHAEL WETZER
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MICHAEL WETZER
description A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance factor (for a component) with the corresponding component data. A scheduler schedules maintenance for a maintenance time period for at least one of the components based on the first database, the second database, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. The predictive maintenance factor may be defined by one or more of the following: a longevity estimate, a probability of failure, a financial estimate on maintenance of a component.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_AU2002248704A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>AU2002248704A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_AU2002248704A13</originalsourceid><addsrcrecordid>eNrjZNALSC1Kyy_KzcxLVygoSk3JTC7JLEtVyE3MzCtJzUvMS05VyM9TSC0szSzITc0r4WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFicmpeakl8Y6hRgYGRkYmFuYGJo6GxsSpAgDgDivf</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Performing predictive maintenance on equipment</title><source>esp@cenet</source><creator>MICHAEL WETZER</creator><creatorcontrib>MICHAEL WETZER</creatorcontrib><description>A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance factor (for a component) with the corresponding component data. A scheduler schedules maintenance for a maintenance time period for at least one of the components based on the first database, the second database, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. The predictive maintenance factor may be defined by one or more of the following: a longevity estimate, a probability of failure, a financial estimate on maintenance of a component.</description><edition>7</edition><language>eng</language><subject>ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDEDFOR ELSEWHERE ; CALCULATING ; CHECKING-DEVICES ; CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION ORPROCESSING OF GOODS ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC ; GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS ; GENERATING RANDOM NUMBERS ; PHYSICS ; REGISTERING OR INDICATING THE WORKING OF MACHINES ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR ; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS ; TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINSTCLIMATE CHANGE ; TIME OR ATTENDANCE REGISTERS ; VOTING OR LOTTERY APPARATUS</subject><creationdate>2002</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20021021&amp;DB=EPODOC&amp;CC=AU&amp;NR=2002248704A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20021021&amp;DB=EPODOC&amp;CC=AU&amp;NR=2002248704A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MICHAEL WETZER</creatorcontrib><title>Performing predictive maintenance on equipment</title><description>A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance factor (for a component) with the corresponding component data. A scheduler schedules maintenance for a maintenance time period for at least one of the components based on the first database, the second database, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. The predictive maintenance factor may be defined by one or more of the following: a longevity estimate, a probability of failure, a financial estimate on maintenance of a component.</description><subject>ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDEDFOR ELSEWHERE</subject><subject>CALCULATING</subject><subject>CHECKING-DEVICES</subject><subject>CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION ORPROCESSING OF GOODS</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC</subject><subject>GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS</subject><subject>GENERATING RANDOM NUMBERS</subject><subject>PHYSICS</subject><subject>REGISTERING OR INDICATING THE WORKING OF MACHINES</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><subject>TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS</subject><subject>TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINSTCLIMATE CHANGE</subject><subject>TIME OR ATTENDANCE REGISTERS</subject><subject>VOTING OR LOTTERY APPARATUS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2002</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNALSC1Kyy_KzcxLVygoSk3JTC7JLEtVyE3MzCtJzUvMS05VyM9TSC0szSzITc0r4WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFicmpeakl8Y6hRgYGRkYmFuYGJo6GxsSpAgDgDivf</recordid><startdate>20021021</startdate><enddate>20021021</enddate><creator>MICHAEL WETZER</creator><scope>EVB</scope></search><sort><creationdate>20021021</creationdate><title>Performing predictive maintenance on equipment</title><author>MICHAEL WETZER</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_AU2002248704A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2002</creationdate><topic>ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDEDFOR ELSEWHERE</topic><topic>CALCULATING</topic><topic>CHECKING-DEVICES</topic><topic>CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION ORPROCESSING OF GOODS</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC</topic><topic>GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS</topic><topic>GENERATING RANDOM NUMBERS</topic><topic>PHYSICS</topic><topic>REGISTERING OR INDICATING THE WORKING OF MACHINES</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><topic>TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS</topic><topic>TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINSTCLIMATE CHANGE</topic><topic>TIME OR ATTENDANCE REGISTERS</topic><topic>VOTING OR LOTTERY APPARATUS</topic><toplevel>online_resources</toplevel><creatorcontrib>MICHAEL WETZER</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MICHAEL WETZER</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Performing predictive maintenance on equipment</title><date>2002-10-21</date><risdate>2002</risdate><abstract>A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance factor (for a component) with the corresponding component data. A scheduler schedules maintenance for a maintenance time period for at least one of the components based on the first database, the second database, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. The predictive maintenance factor may be defined by one or more of the following: a longevity estimate, a probability of failure, a financial estimate on maintenance of a component.</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_AU2002248704A1
source esp@cenet
subjects ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDEDFOR ELSEWHERE
CALCULATING
CHECKING-DEVICES
CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION ORPROCESSING OF GOODS
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS
GENERATING RANDOM NUMBERS
PHYSICS
REGISTERING OR INDICATING THE WORKING OF MACHINES
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINSTCLIMATE CHANGE
TIME OR ATTENDANCE REGISTERS
VOTING OR LOTTERY APPARATUS
title Performing predictive maintenance on equipment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T02%3A28%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MICHAEL%20WETZER&rft.date=2002-10-21&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EAU2002248704A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true