Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota

Ellsworth AFB is faced with having to upgrade its current wastewater treatment systems to meet more stringent State of South Dakota-mandated restrictions on wastewater discharge. Ellsworth AFB is proposing to decommission and demolish its current wastewater treatment plant and allow construction of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Alario, Domenick, Baxter, Louise, Blonkowski, Tom, Brown, David, Buzun, Jennifer, Delaney, Ryan, Grant, Marcus, Koenig, Daniel, Knowlton, David, Manning, Shad
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Alario, Domenick
Baxter, Louise
Blonkowski, Tom
Brown, David
Buzun, Jennifer
Delaney, Ryan
Grant, Marcus
Koenig, Daniel
Knowlton, David
Manning, Shad
description Ellsworth AFB is faced with having to upgrade its current wastewater treatment systems to meet more stringent State of South Dakota-mandated restrictions on wastewater discharge. Ellsworth AFB is proposing to decommission and demolish its current wastewater treatment plant and allow construction of a new sanitary sewer pipeline on Ellsworth AFB within an easement granted to the South Dakota EDA. The sanitary sewer pipeline would connect to an existing pipeline southeast of the installation that would flow to a proposed future RWWTP off-installation. In addition to evaluating these activities, this EA also evaluates Ellsworth AFB?s contribution to the regional wastewater stream. Under this Proposed Action, decommissioning of the existing WWTP would start in early 2014 and the installation would begin sending flow to the proposed future RWWTP by summer 2014. At no time during the decommissioning process would flow be untreated before the RWWTP goes online. The proposed corridor for establishing a new sewer pipeline would cross portions of the Ellsworth AFB's Prairie Ridge Golf Course and a small, unnamed tributary east of the existing WWTP. This EA has been prepared to evaluate the Proposed Action and alternatives, including the No Action Alternative, and to aid in determining whether a Finding of No Significant Impact/Finding of No Practicable Alternative (FONSI)/(FONPA) can be prepared or whether an Environmental Impact Statement is needed. Resource areas that were considered in the impact analysis are land use infrastructure, noise, air quality, safety, geological resources, water resources, biological resources cultural resources, socioeconomic resources and environmental justice, and hazardous materials and wastes. A previous iteration of this Draft EA was made available to the public for a 30-day review period in April and May 2011.
format Report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA610715</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA610715</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA6107153</originalsourceid><addsrcrecordid>eNqFjMEOAUEQRPfiIPgDh_4AEiI4D1YcBYnjprPTS8eYkem2-xl-2ezG3aWrK_Wq-tkn9zXH4J_kFR0YERJpDRhrY_rZ38CUyjUrk7RAKBmVLDSsd9hRTS68ukaoAOFENw4-TV1RlJpERrhEQu2Qo8N0c-ekCTHVzX4zgXN4t0v4CIrDrFehExr9dJCN9_lle5ha5bIQZU9amJ1ZzWfr-XLxJ_4CVmZL2w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota</title><source>DTIC Technical Reports</source><creator>Alario, Domenick ; Baxter, Louise ; Blonkowski, Tom ; Brown, David ; Buzun, Jennifer ; Delaney, Ryan ; Grant, Marcus ; Koenig, Daniel ; Knowlton, David ; Manning, Shad</creator><creatorcontrib>Alario, Domenick ; Baxter, Louise ; Blonkowski, Tom ; Brown, David ; Buzun, Jennifer ; Delaney, Ryan ; Grant, Marcus ; Koenig, Daniel ; Knowlton, David ; Manning, Shad ; HDR INC OMAHA NE</creatorcontrib><description>Ellsworth AFB is faced with having to upgrade its current wastewater treatment systems to meet more stringent State of South Dakota-mandated restrictions on wastewater discharge. Ellsworth AFB is proposing to decommission and demolish its current wastewater treatment plant and allow construction of a new sanitary sewer pipeline on Ellsworth AFB within an easement granted to the South Dakota EDA. The sanitary sewer pipeline would connect to an existing pipeline southeast of the installation that would flow to a proposed future RWWTP off-installation. In addition to evaluating these activities, this EA also evaluates Ellsworth AFB?s contribution to the regional wastewater stream. Under this Proposed Action, decommissioning of the existing WWTP would start in early 2014 and the installation would begin sending flow to the proposed future RWWTP by summer 2014. At no time during the decommissioning process would flow be untreated before the RWWTP goes online. The proposed corridor for establishing a new sewer pipeline would cross portions of the Ellsworth AFB's Prairie Ridge Golf Course and a small, unnamed tributary east of the existing WWTP. This EA has been prepared to evaluate the Proposed Action and alternatives, including the No Action Alternative, and to aid in determining whether a Finding of No Significant Impact/Finding of No Practicable Alternative (FONSI)/(FONPA) can be prepared or whether an Environmental Impact Statement is needed. Resource areas that were considered in the impact analysis are land use infrastructure, noise, air quality, safety, geological resources, water resources, biological resources cultural resources, socioeconomic resources and environmental justice, and hazardous materials and wastes. A previous iteration of this Draft EA was made available to the public for a 30-day review period in April and May 2011.</description><language>eng</language><subject>AIR QUALITY ; BIOLOGICAL RESOURCES ; CONSTRUCTION ; CULTURAL RESOURCES ; ENVIRONMENTAL ASSESSMENT ; Environmental Health and Safety ; ENVIRONMENTAL JUSTICE ; FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE) ; FONSI(FINDING OF NO SIGNIFICANT IMPACT) ; GEOLOGY ; HAZARDOUS MATERIALS ; INFRASTRUCTURE ; LAND USE ; Logistics, Military Facilities and Supplies ; MILITARY FACILITIES ; NOISE ; PIPELINES ; RWWTP(REGIONAL WASTEWATER TREATMENT PLANTS) ; SAFETY ; SOCIOECONOMIC RESOURCES ; WASTE WATER ; Water Pollution and Control ; WATER TREATMENT ; WETLANDS</subject><creationdate>2012</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,27544,27545</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA610715$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Alario, Domenick</creatorcontrib><creatorcontrib>Baxter, Louise</creatorcontrib><creatorcontrib>Blonkowski, Tom</creatorcontrib><creatorcontrib>Brown, David</creatorcontrib><creatorcontrib>Buzun, Jennifer</creatorcontrib><creatorcontrib>Delaney, Ryan</creatorcontrib><creatorcontrib>Grant, Marcus</creatorcontrib><creatorcontrib>Koenig, Daniel</creatorcontrib><creatorcontrib>Knowlton, David</creatorcontrib><creatorcontrib>Manning, Shad</creatorcontrib><creatorcontrib>HDR INC OMAHA NE</creatorcontrib><title>Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota</title><description>Ellsworth AFB is faced with having to upgrade its current wastewater treatment systems to meet more stringent State of South Dakota-mandated restrictions on wastewater discharge. Ellsworth AFB is proposing to decommission and demolish its current wastewater treatment plant and allow construction of a new sanitary sewer pipeline on Ellsworth AFB within an easement granted to the South Dakota EDA. The sanitary sewer pipeline would connect to an existing pipeline southeast of the installation that would flow to a proposed future RWWTP off-installation. In addition to evaluating these activities, this EA also evaluates Ellsworth AFB?s contribution to the regional wastewater stream. Under this Proposed Action, decommissioning of the existing WWTP would start in early 2014 and the installation would begin sending flow to the proposed future RWWTP by summer 2014. At no time during the decommissioning process would flow be untreated before the RWWTP goes online. The proposed corridor for establishing a new sewer pipeline would cross portions of the Ellsworth AFB's Prairie Ridge Golf Course and a small, unnamed tributary east of the existing WWTP. This EA has been prepared to evaluate the Proposed Action and alternatives, including the No Action Alternative, and to aid in determining whether a Finding of No Significant Impact/Finding of No Practicable Alternative (FONSI)/(FONPA) can be prepared or whether an Environmental Impact Statement is needed. Resource areas that were considered in the impact analysis are land use infrastructure, noise, air quality, safety, geological resources, water resources, biological resources cultural resources, socioeconomic resources and environmental justice, and hazardous materials and wastes. A previous iteration of this Draft EA was made available to the public for a 30-day review period in April and May 2011.</description><subject>AIR QUALITY</subject><subject>BIOLOGICAL RESOURCES</subject><subject>CONSTRUCTION</subject><subject>CULTURAL RESOURCES</subject><subject>ENVIRONMENTAL ASSESSMENT</subject><subject>Environmental Health and Safety</subject><subject>ENVIRONMENTAL JUSTICE</subject><subject>FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)</subject><subject>FONSI(FINDING OF NO SIGNIFICANT IMPACT)</subject><subject>GEOLOGY</subject><subject>HAZARDOUS MATERIALS</subject><subject>INFRASTRUCTURE</subject><subject>LAND USE</subject><subject>Logistics, Military Facilities and Supplies</subject><subject>MILITARY FACILITIES</subject><subject>NOISE</subject><subject>PIPELINES</subject><subject>RWWTP(REGIONAL WASTEWATER TREATMENT PLANTS)</subject><subject>SAFETY</subject><subject>SOCIOECONOMIC RESOURCES</subject><subject>WASTE WATER</subject><subject>Water Pollution and Control</subject><subject>WATER TREATMENT</subject><subject>WETLANDS</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2012</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNqFjMEOAUEQRPfiIPgDh_4AEiI4D1YcBYnjprPTS8eYkem2-xl-2ezG3aWrK_Wq-tkn9zXH4J_kFR0YERJpDRhrY_rZ38CUyjUrk7RAKBmVLDSsd9hRTS68ukaoAOFENw4-TV1RlJpERrhEQu2Qo8N0c-ekCTHVzX4zgXN4t0v4CIrDrFehExr9dJCN9_lle5ha5bIQZU9amJ1ZzWfr-XLxJ_4CVmZL2w</recordid><startdate>201205</startdate><enddate>201205</enddate><creator>Alario, Domenick</creator><creator>Baxter, Louise</creator><creator>Blonkowski, Tom</creator><creator>Brown, David</creator><creator>Buzun, Jennifer</creator><creator>Delaney, Ryan</creator><creator>Grant, Marcus</creator><creator>Koenig, Daniel</creator><creator>Knowlton, David</creator><creator>Manning, Shad</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>201205</creationdate><title>Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota</title><author>Alario, Domenick ; Baxter, Louise ; Blonkowski, Tom ; Brown, David ; Buzun, Jennifer ; Delaney, Ryan ; Grant, Marcus ; Koenig, Daniel ; Knowlton, David ; Manning, Shad</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA6107153</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2012</creationdate><topic>AIR QUALITY</topic><topic>BIOLOGICAL RESOURCES</topic><topic>CONSTRUCTION</topic><topic>CULTURAL RESOURCES</topic><topic>ENVIRONMENTAL ASSESSMENT</topic><topic>Environmental Health and Safety</topic><topic>ENVIRONMENTAL JUSTICE</topic><topic>FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)</topic><topic>FONSI(FINDING OF NO SIGNIFICANT IMPACT)</topic><topic>GEOLOGY</topic><topic>HAZARDOUS MATERIALS</topic><topic>INFRASTRUCTURE</topic><topic>LAND USE</topic><topic>Logistics, Military Facilities and Supplies</topic><topic>MILITARY FACILITIES</topic><topic>NOISE</topic><topic>PIPELINES</topic><topic>RWWTP(REGIONAL WASTEWATER TREATMENT PLANTS)</topic><topic>SAFETY</topic><topic>SOCIOECONOMIC RESOURCES</topic><topic>WASTE WATER</topic><topic>Water Pollution and Control</topic><topic>WATER TREATMENT</topic><topic>WETLANDS</topic><toplevel>online_resources</toplevel><creatorcontrib>Alario, Domenick</creatorcontrib><creatorcontrib>Baxter, Louise</creatorcontrib><creatorcontrib>Blonkowski, Tom</creatorcontrib><creatorcontrib>Brown, David</creatorcontrib><creatorcontrib>Buzun, Jennifer</creatorcontrib><creatorcontrib>Delaney, Ryan</creatorcontrib><creatorcontrib>Grant, Marcus</creatorcontrib><creatorcontrib>Koenig, Daniel</creatorcontrib><creatorcontrib>Knowlton, David</creatorcontrib><creatorcontrib>Manning, Shad</creatorcontrib><creatorcontrib>HDR INC OMAHA NE</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Alario, Domenick</au><au>Baxter, Louise</au><au>Blonkowski, Tom</au><au>Brown, David</au><au>Buzun, Jennifer</au><au>Delaney, Ryan</au><au>Grant, Marcus</au><au>Koenig, Daniel</au><au>Knowlton, David</au><au>Manning, Shad</au><aucorp>HDR INC OMAHA NE</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota</btitle><date>2012-05</date><risdate>2012</risdate><abstract>Ellsworth AFB is faced with having to upgrade its current wastewater treatment systems to meet more stringent State of South Dakota-mandated restrictions on wastewater discharge. Ellsworth AFB is proposing to decommission and demolish its current wastewater treatment plant and allow construction of a new sanitary sewer pipeline on Ellsworth AFB within an easement granted to the South Dakota EDA. The sanitary sewer pipeline would connect to an existing pipeline southeast of the installation that would flow to a proposed future RWWTP off-installation. In addition to evaluating these activities, this EA also evaluates Ellsworth AFB?s contribution to the regional wastewater stream. Under this Proposed Action, decommissioning of the existing WWTP would start in early 2014 and the installation would begin sending flow to the proposed future RWWTP by summer 2014. At no time during the decommissioning process would flow be untreated before the RWWTP goes online. The proposed corridor for establishing a new sewer pipeline would cross portions of the Ellsworth AFB's Prairie Ridge Golf Course and a small, unnamed tributary east of the existing WWTP. This EA has been prepared to evaluate the Proposed Action and alternatives, including the No Action Alternative, and to aid in determining whether a Finding of No Significant Impact/Finding of No Practicable Alternative (FONSI)/(FONPA) can be prepared or whether an Environmental Impact Statement is needed. Resource areas that were considered in the impact analysis are land use infrastructure, noise, air quality, safety, geological resources, water resources, biological resources cultural resources, socioeconomic resources and environmental justice, and hazardous materials and wastes. A previous iteration of this Draft EA was made available to the public for a 30-day review period in April and May 2011.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA610715
source DTIC Technical Reports
subjects AIR QUALITY
BIOLOGICAL RESOURCES
CONSTRUCTION
CULTURAL RESOURCES
ENVIRONMENTAL ASSESSMENT
Environmental Health and Safety
ENVIRONMENTAL JUSTICE
FONPA(FINDING OF NO PRACTICABLE ALTERNATIVE)
FONSI(FINDING OF NO SIGNIFICANT IMPACT)
GEOLOGY
HAZARDOUS MATERIALS
INFRASTRUCTURE
LAND USE
Logistics, Military Facilities and Supplies
MILITARY FACILITIES
NOISE
PIPELINES
RWWTP(REGIONAL WASTEWATER TREATMENT PLANTS)
SAFETY
SOCIOECONOMIC RESOURCES
WASTE WATER
Water Pollution and Control
WATER TREATMENT
WETLANDS
title Environmental Assessment Addressing Activities Associated with Development of a Regional Wastewater Treatment Plant Ellsworth AFB, South Dakota
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T18%3A30%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Environmental%20Assessment%20Addressing%20Activities%20Associated%20with%20Development%20of%20a%20Regional%20Wastewater%20Treatment%20Plant%20Ellsworth%20AFB,%20South%20Dakota&rft.au=Alario,%20Domenick&rft.aucorp=HDR%20INC%20OMAHA%20NE&rft.date=2012-05&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA610715%3C/dtic_1RU%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true