1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun

The 4.5-MJ capacitor-based power supply at the U.S. Army Research Laboratory (ARL) originally contained 18 modules at 250 KJ each. Within each module, five 840-microF Aerovox capacitors and either a 60-microH or a 30-microH inductor, allowed the generation of output pulses of different profiles. Sin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Del Guercio, Miguel A, Michlin, Alexander
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Del Guercio, Miguel A
Michlin, Alexander
description The 4.5-MJ capacitor-based power supply at the U.S. Army Research Laboratory (ARL) originally contained 18 modules at 250 KJ each. Within each module, five 840-microF Aerovox capacitors and either a 60-microH or a 30-microH inductor, allowed the generation of output pulses of different profiles. Since 2001, the power supply, railgun and breech, has performed safely and reliably for over 500 single shot launches. During 2007, all capacitors were replaced with new 950-microF General Atomics capacitors, increasing the total energy of the system to 5.2 MJ. During 2009 a study was started to assess the feasibility of modifying the existing breech that would result in a breech of smaller size, improved means to load projectiles, and capable of firing multiple shots at 1 MA. A first analysis focused on improving the uniformity of current distributions at the breech-insert-rail interfaces, suspected in causing of some catastrophic failures seen previously during multi-shot launches. Next, the breech contact forces were characterized as well as selection of improved materials and geometries for the breech plates and rail inserts. This report includes progress made until the facility was shutdown in November 2009 and contains general conclusions to facilitate the implementation of a multi-shot 1-MA breech. The original document contains color images.
format Report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA549226</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA549226</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA5492263</originalsourceid><addsrcrecordid>eNqFyrEOgjAUQFEWB6P-gcPb0KEkVjRxrKjRRBeQmVR4QBNozWtJ5O_t4O50h3umwbiBh4AjIZYt5O-GZIVQGwLXIuRRFoGgfoQULUry5C5fhqQzNIYWViK9h3btb-mkboZOEnDO4MPimPU93DTzGiEhYy1kXimjIZWqawY9Dya17Cwufp0Fy8v5mVxZ5VRZWKc0ukKcxC4-cL7f_tlfUwc-sw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun</title><source>DTIC Technical Reports</source><creator>Del Guercio, Miguel A ; Michlin, Alexander</creator><creatorcontrib>Del Guercio, Miguel A ; Michlin, Alexander ; ARMY RESEARCH LAB ABERDEEN PROVING GROUND MD WEAPONS AND MATERIALS RESEARCH DIRECTORATE</creatorcontrib><description>The 4.5-MJ capacitor-based power supply at the U.S. Army Research Laboratory (ARL) originally contained 18 modules at 250 KJ each. Within each module, five 840-microF Aerovox capacitors and either a 60-microH or a 30-microH inductor, allowed the generation of output pulses of different profiles. Since 2001, the power supply, railgun and breech, has performed safely and reliably for over 500 single shot launches. During 2007, all capacitors were replaced with new 950-microF General Atomics capacitors, increasing the total energy of the system to 5.2 MJ. During 2009 a study was started to assess the feasibility of modifying the existing breech that would result in a breech of smaller size, improved means to load projectiles, and capable of firing multiple shots at 1 MA. A first analysis focused on improving the uniformity of current distributions at the breech-insert-rail interfaces, suspected in causing of some catastrophic failures seen previously during multi-shot launches. Next, the breech contact forces were characterized as well as selection of improved materials and geometries for the breech plates and rail inserts. This report includes progress made until the facility was shutdown in November 2009 and contains general conclusions to facilitate the implementation of a multi-shot 1-MA breech. The original document contains color images.</description><language>eng</language><subject>1 MA BREECH ; BREECH MECHANISMS ; CAPACITORS ; ELECTROMAGNETIC GUNS ; Guns</subject><creationdate>2011</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,27544,27545</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA549226$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Del Guercio, Miguel A</creatorcontrib><creatorcontrib>Michlin, Alexander</creatorcontrib><creatorcontrib>ARMY RESEARCH LAB ABERDEEN PROVING GROUND MD WEAPONS AND MATERIALS RESEARCH DIRECTORATE</creatorcontrib><title>1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun</title><description>The 4.5-MJ capacitor-based power supply at the U.S. Army Research Laboratory (ARL) originally contained 18 modules at 250 KJ each. Within each module, five 840-microF Aerovox capacitors and either a 60-microH or a 30-microH inductor, allowed the generation of output pulses of different profiles. Since 2001, the power supply, railgun and breech, has performed safely and reliably for over 500 single shot launches. During 2007, all capacitors were replaced with new 950-microF General Atomics capacitors, increasing the total energy of the system to 5.2 MJ. During 2009 a study was started to assess the feasibility of modifying the existing breech that would result in a breech of smaller size, improved means to load projectiles, and capable of firing multiple shots at 1 MA. A first analysis focused on improving the uniformity of current distributions at the breech-insert-rail interfaces, suspected in causing of some catastrophic failures seen previously during multi-shot launches. Next, the breech contact forces were characterized as well as selection of improved materials and geometries for the breech plates and rail inserts. This report includes progress made until the facility was shutdown in November 2009 and contains general conclusions to facilitate the implementation of a multi-shot 1-MA breech. The original document contains color images.</description><subject>1 MA BREECH</subject><subject>BREECH MECHANISMS</subject><subject>CAPACITORS</subject><subject>ELECTROMAGNETIC GUNS</subject><subject>Guns</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2011</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNqFyrEOgjAUQFEWB6P-gcPb0KEkVjRxrKjRRBeQmVR4QBNozWtJ5O_t4O50h3umwbiBh4AjIZYt5O-GZIVQGwLXIuRRFoGgfoQULUry5C5fhqQzNIYWViK9h3btb-mkboZOEnDO4MPimPU93DTzGiEhYy1kXimjIZWqawY9Dya17Cwufp0Fy8v5mVxZ5VRZWKc0ukKcxC4-cL7f_tlfUwc-sw</recordid><startdate>201108</startdate><enddate>201108</enddate><creator>Del Guercio, Miguel A</creator><creator>Michlin, Alexander</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>201108</creationdate><title>1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun</title><author>Del Guercio, Miguel A ; Michlin, Alexander</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA5492263</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2011</creationdate><topic>1 MA BREECH</topic><topic>BREECH MECHANISMS</topic><topic>CAPACITORS</topic><topic>ELECTROMAGNETIC GUNS</topic><topic>Guns</topic><toplevel>online_resources</toplevel><creatorcontrib>Del Guercio, Miguel A</creatorcontrib><creatorcontrib>Michlin, Alexander</creatorcontrib><creatorcontrib>ARMY RESEARCH LAB ABERDEEN PROVING GROUND MD WEAPONS AND MATERIALS RESEARCH DIRECTORATE</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Del Guercio, Miguel A</au><au>Michlin, Alexander</au><aucorp>ARMY RESEARCH LAB ABERDEEN PROVING GROUND MD WEAPONS AND MATERIALS RESEARCH DIRECTORATE</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun</btitle><date>2011-08</date><risdate>2011</risdate><abstract>The 4.5-MJ capacitor-based power supply at the U.S. Army Research Laboratory (ARL) originally contained 18 modules at 250 KJ each. Within each module, five 840-microF Aerovox capacitors and either a 60-microH or a 30-microH inductor, allowed the generation of output pulses of different profiles. Since 2001, the power supply, railgun and breech, has performed safely and reliably for over 500 single shot launches. During 2007, all capacitors were replaced with new 950-microF General Atomics capacitors, increasing the total energy of the system to 5.2 MJ. During 2009 a study was started to assess the feasibility of modifying the existing breech that would result in a breech of smaller size, improved means to load projectiles, and capable of firing multiple shots at 1 MA. A first analysis focused on improving the uniformity of current distributions at the breech-insert-rail interfaces, suspected in causing of some catastrophic failures seen previously during multi-shot launches. Next, the breech contact forces were characterized as well as selection of improved materials and geometries for the breech plates and rail inserts. This report includes progress made until the facility was shutdown in November 2009 and contains general conclusions to facilitate the implementation of a multi-shot 1-MA breech. The original document contains color images.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA549226
source DTIC Technical Reports
subjects 1 MA BREECH
BREECH MECHANISMS
CAPACITORS
ELECTROMAGNETIC GUNS
Guns
title 1 MA Breech Upgrade for the U.S. Army Research Laboratory's (ARL's) Rectangular 22- x-44-mm In-bore Cross Section Railgun
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T00%3A15%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=1%20MA%20Breech%20Upgrade%20for%20the%20U.S.%20Army%20Research%20Laboratory's%20(ARL's)%20Rectangular%2022-%20x-44-mm%20In-bore%20Cross%20Section%20Railgun&rft.au=Del%20Guercio,%20Miguel%20A&rft.aucorp=ARMY%20RESEARCH%20LAB%20ABERDEEN%20PROVING%20GROUND%20MD%20WEAPONS%20AND%20MATERIALS%20RESEARCH%20DIRECTORATE&rft.date=2011-08&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA549226%3C/dtic_1RU%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true