Cost Estimation of Post Production Software Support in Ground Combat Systems

Weapon systems and programs are becoming increasingly more dependent on software as a critical technology for the success of the programs. Along with this dependence on performance, the costs associated with software are becoming an increasing share of the life cycle costs of these weapon systems an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Cannon, Christopher J
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Cannon, Christopher J
description Weapon systems and programs are becoming increasingly more dependent on software as a critical technology for the success of the programs. Along with this dependence on performance, the costs associated with software are becoming an increasing share of the life cycle costs of these weapon systems and programs. Life cycle software costs are divided into two phases, development and maintenance. There are numerous popular models to aid developers and independent estimators in predicting costs and schedules for software development. Some of these models are open source, many others are proprietary. These models are based on research performed on existing software systems and historical data. However, for software maintenance, there are far fewer models, research efforts, or collected data sets. The Army s term for software maintenance is post production software support. This thesis describes how this support is currently funded, performed, and estimated. The model presented could be adopted to manage support of Army ground combat systems. This thesis is furthers the understanding of the software maintenance support costs associated with weapon systems. In addition to specific results on ground combat systems presented, the thesis provides insight into maintaining other large software-dependent systems and recommendations on further research in the field. The original document contains color images.
format Report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA473799</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA473799</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA4737993</originalsourceid><addsrcrecordid>eNrjZPBxzi8uUXAtLsnMTSzJzM9TyE9TCAAJBRTlp5Qmg4WC89NKyhOLUhWCSwsK8otKFDLzFNyL8kvzUhSc83OTEksUgiuLS1Jzi3kYWNMSc4pTeaE0N4OMm2uIs4duSklmcjzQjrzUknhHF0cTc2NzS0tjAtIAdIYy8Q</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Cost Estimation of Post Production Software Support in Ground Combat Systems</title><source>DTIC Technical Reports</source><creator>Cannon, Christopher J</creator><creatorcontrib>Cannon, Christopher J ; NAVAL POSTGRADUATE SCHOOL MONTEREY CA</creatorcontrib><description>Weapon systems and programs are becoming increasingly more dependent on software as a critical technology for the success of the programs. Along with this dependence on performance, the costs associated with software are becoming an increasing share of the life cycle costs of these weapon systems and programs. Life cycle software costs are divided into two phases, development and maintenance. There are numerous popular models to aid developers and independent estimators in predicting costs and schedules for software development. Some of these models are open source, many others are proprietary. These models are based on research performed on existing software systems and historical data. However, for software maintenance, there are far fewer models, research efforts, or collected data sets. The Army s term for software maintenance is post production software support. This thesis describes how this support is currently funded, performed, and estimated. The model presented could be adopted to manage support of Army ground combat systems. This thesis is furthers the understanding of the software maintenance support costs associated with weapon systems. In addition to specific results on ground combat systems presented, the thesis provides insight into maintaining other large software-dependent systems and recommendations on further research in the field. The original document contains color images.</description><language>eng</language><subject>ARMY EQUIPMENT ; ARMY OPERATIONS ; Computer Programming and Software ; COMPUTER PROGRAMS ; COST ESTIMATES ; COSTS ; DATA BASES ; LAND WARFARE ; LIFE CYCLE COSTS ; MAINTENANCE ; PRODUCTION ; SOFTWARE ENGINEERING ; SOURCES ; THESES ; WEAPON SYSTEMS</subject><creationdate>2007</creationdate><rights>Approved for public release; distribution is unlimited.</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,27544,27545</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA473799$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Cannon, Christopher J</creatorcontrib><creatorcontrib>NAVAL POSTGRADUATE SCHOOL MONTEREY CA</creatorcontrib><title>Cost Estimation of Post Production Software Support in Ground Combat Systems</title><description>Weapon systems and programs are becoming increasingly more dependent on software as a critical technology for the success of the programs. Along with this dependence on performance, the costs associated with software are becoming an increasing share of the life cycle costs of these weapon systems and programs. Life cycle software costs are divided into two phases, development and maintenance. There are numerous popular models to aid developers and independent estimators in predicting costs and schedules for software development. Some of these models are open source, many others are proprietary. These models are based on research performed on existing software systems and historical data. However, for software maintenance, there are far fewer models, research efforts, or collected data sets. The Army s term for software maintenance is post production software support. This thesis describes how this support is currently funded, performed, and estimated. The model presented could be adopted to manage support of Army ground combat systems. This thesis is furthers the understanding of the software maintenance support costs associated with weapon systems. In addition to specific results on ground combat systems presented, the thesis provides insight into maintaining other large software-dependent systems and recommendations on further research in the field. The original document contains color images.</description><subject>ARMY EQUIPMENT</subject><subject>ARMY OPERATIONS</subject><subject>Computer Programming and Software</subject><subject>COMPUTER PROGRAMS</subject><subject>COST ESTIMATES</subject><subject>COSTS</subject><subject>DATA BASES</subject><subject>LAND WARFARE</subject><subject>LIFE CYCLE COSTS</subject><subject>MAINTENANCE</subject><subject>PRODUCTION</subject><subject>SOFTWARE ENGINEERING</subject><subject>SOURCES</subject><subject>THESES</subject><subject>WEAPON SYSTEMS</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>2007</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZPBxzi8uUXAtLsnMTSzJzM9TyE9TCAAJBRTlp5Qmg4WC89NKyhOLUhWCSwsK8otKFDLzFNyL8kvzUhSc83OTEksUgiuLS1Jzi3kYWNMSc4pTeaE0N4OMm2uIs4duSklmcjzQjrzUknhHF0cTc2NzS0tjAtIAdIYy8Q</recordid><startdate>200709</startdate><enddate>200709</enddate><creator>Cannon, Christopher J</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>200709</creationdate><title>Cost Estimation of Post Production Software Support in Ground Combat Systems</title><author>Cannon, Christopher J</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA4737993</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>2007</creationdate><topic>ARMY EQUIPMENT</topic><topic>ARMY OPERATIONS</topic><topic>Computer Programming and Software</topic><topic>COMPUTER PROGRAMS</topic><topic>COST ESTIMATES</topic><topic>COSTS</topic><topic>DATA BASES</topic><topic>LAND WARFARE</topic><topic>LIFE CYCLE COSTS</topic><topic>MAINTENANCE</topic><topic>PRODUCTION</topic><topic>SOFTWARE ENGINEERING</topic><topic>SOURCES</topic><topic>THESES</topic><topic>WEAPON SYSTEMS</topic><toplevel>online_resources</toplevel><creatorcontrib>Cannon, Christopher J</creatorcontrib><creatorcontrib>NAVAL POSTGRADUATE SCHOOL MONTEREY CA</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Cannon, Christopher J</au><aucorp>NAVAL POSTGRADUATE SCHOOL MONTEREY CA</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Cost Estimation of Post Production Software Support in Ground Combat Systems</btitle><date>2007-09</date><risdate>2007</risdate><abstract>Weapon systems and programs are becoming increasingly more dependent on software as a critical technology for the success of the programs. Along with this dependence on performance, the costs associated with software are becoming an increasing share of the life cycle costs of these weapon systems and programs. Life cycle software costs are divided into two phases, development and maintenance. There are numerous popular models to aid developers and independent estimators in predicting costs and schedules for software development. Some of these models are open source, many others are proprietary. These models are based on research performed on existing software systems and historical data. However, for software maintenance, there are far fewer models, research efforts, or collected data sets. The Army s term for software maintenance is post production software support. This thesis describes how this support is currently funded, performed, and estimated. The model presented could be adopted to manage support of Army ground combat systems. This thesis is furthers the understanding of the software maintenance support costs associated with weapon systems. In addition to specific results on ground combat systems presented, the thesis provides insight into maintaining other large software-dependent systems and recommendations on further research in the field. The original document contains color images.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA473799
source DTIC Technical Reports
subjects ARMY EQUIPMENT
ARMY OPERATIONS
Computer Programming and Software
COMPUTER PROGRAMS
COST ESTIMATES
COSTS
DATA BASES
LAND WARFARE
LIFE CYCLE COSTS
MAINTENANCE
PRODUCTION
SOFTWARE ENGINEERING
SOURCES
THESES
WEAPON SYSTEMS
title Cost Estimation of Post Production Software Support in Ground Combat Systems
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-19T00%3A49%3A43IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Cost%20Estimation%20of%20Post%20Production%20Software%20Support%20in%20Ground%20Combat%20Systems&rft.au=Cannon,%20Christopher%20J&rft.aucorp=NAVAL%20POSTGRADUATE%20SCHOOL%20MONTEREY%20CA&rft.date=2007-09&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA473799%3C/dtic_1RU%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true