Full-Scale Startup of a Soil Venting-Based in Situ Bioremediation Field Pilot Study at Fallon NAS, Nevada
This report summarizes the first year of operation of the Navy's NAS Fallon Bioslurper system. The bioslurper system was installed to recover free-phase JP-5 from the shallow water table and to aerate the vadose zone through low flow vapor extraction (bioventing). Full-scale startup of the bios...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!