Energy Engineering Analysis Program (EEAP), Fort Sill Army Base, Volume 1 - Executive Summary, Increments F and G
Included in this summary are the data and results of the first five energy analysis and study increments (A, B, C, D and E) which were developed under a previous contract to provide a Basewide Energy Systems Plan for the Fort Sill Army Base at Lawton, Oklahoma. Also included in this Summary are the...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Included in this summary are the data and results of the first five energy analysis and study increments (A, B, C, D and E) which were developed under a previous contract to provide a Basewide Energy Systems Plan for the Fort Sill Army Base at Lawton, Oklahoma. Also included in this Summary are the data and results of increments F and G that are the responsibility of Energy Masters Corporation. The primary goals outlined in the scope of work for this study are as follows: (1) Develop low cost energy conservation projects within the Facilities Engineer Funding Authority. (2) Update and modify, as required, energy conservation projects developed in Increments A, B, C, D, and E. (3) Combine all proposed energy conservation projects into one comprehensive list. (4) List the recommended projects in an order of priority based on each project's savings investment ratio (SIR). Also schedule the construction of the recommended projects. (5) Calculate energy and cost savings and project basewide energy consumption after implementation of recommended projects. This submittal is based on work done for Increments F and G as outlined in the Prenegotiation Meeting and Manual DAEN-MPE-E entitled Scope of Work for Energy Engineering Analysis Program ( EEAP); paragraphs 3.5.6 and 3.5.7. See page 1 Appendix for complete text of Prenegotiation Meeting. |
---|