Central Heating Plant Modernization Study for the Defense Personnel Support Center

This report documents a study to determine alternatives for modernizing the central heating plant at the Defense Personnel Support Center (DPSC), Philadelphia, PA. The central heating plant contains five boilers; four are 50 years old and one is 14 years old. The age of this equipment warranted an i...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Savoie, Martin J, Price, Russ, Deligiannis, Spiro J, McCammon, Travis L
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Savoie, Martin J
Price, Russ
Deligiannis, Spiro J
McCammon, Travis L
description This report documents a study to determine alternatives for modernizing the central heating plant at the Defense Personnel Support Center (DPSC), Philadelphia, PA. The central heating plant contains five boilers; four are 50 years old and one is 14 years old. The age of this equipment warranted an investigation of alternatives for providing thermal energy to the installation. These alternatives include maintaining the status quo, upgrading the existing system, installing new boilers, cogeneration, and absorption chilling. Heating and cooling loads were analyzed using computer simulations. Based on the simulations and design temperatures, life cycle costs were developed for each alternative. (MM)
format Report
fullrecord <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA293543</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA293543</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA2935433</originalsourceid><addsrcrecordid>eNrjZAhyTs0rKUrMUfBITSzJzEtXCMhJzCtR8M1PSS3Ky6wCiuXnKQSXlKZUKqTlFymUZKQquKSmpeYVpyoEpBYV5-flpeYoBJcWFOQXlSiAzEot4mFgTUvMKU7lhdLcDDJuriHOHropJZnJ8cVAW1JL4h1dHI0sjU1NjI0JSAMAy2A1Aw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Central Heating Plant Modernization Study for the Defense Personnel Support Center</title><source>DTIC Technical Reports</source><creator>Savoie, Martin J ; Price, Russ ; Deligiannis, Spiro J ; McCammon, Travis L</creator><creatorcontrib>Savoie, Martin J ; Price, Russ ; Deligiannis, Spiro J ; McCammon, Travis L ; CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL ENERGY AND UTILITI ES SYSTEMS DIV</creatorcontrib><description>This report documents a study to determine alternatives for modernizing the central heating plant at the Defense Personnel Support Center (DPSC), Philadelphia, PA. The central heating plant contains five boilers; four are 50 years old and one is 14 years old. The age of this equipment warranted an investigation of alternatives for providing thermal energy to the installation. These alternatives include maintaining the status quo, upgrading the existing system, installing new boilers, cogeneration, and absorption chilling. Heating and cooling loads were analyzed using computer simulations. Based on the simulations and design temperatures, life cycle costs were developed for each alternative. (MM)</description><language>eng</language><subject>AGING(MATERIALS) ; Air Condition, Heating, Lighting &amp; Ventilating ; Air Pollution and Control ; AIR QUALITY ; BOILERS ; CENTRAL HEATING PLANTS ; COMPUTERIZED SIMULATION ; COST EFFECTIVENESS ; DEFENSE PERSONNEL SUPPORT CENTER ; ELECTRIC POWER ; ENERGY CONSUMPTION ; FUEL CONSUMPTION ; FUEL OIL ; GAS TURBINES ; HEATING PLANTS ; LIFE CYCLE COSTS ; STEAM</subject><creationdate>1994</creationdate><rights>APPROVED FOR PUBLIC RELEASE</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27567,27568</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA293543$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Savoie, Martin J</creatorcontrib><creatorcontrib>Price, Russ</creatorcontrib><creatorcontrib>Deligiannis, Spiro J</creatorcontrib><creatorcontrib>McCammon, Travis L</creatorcontrib><creatorcontrib>CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL ENERGY AND UTILITI ES SYSTEMS DIV</creatorcontrib><title>Central Heating Plant Modernization Study for the Defense Personnel Support Center</title><description>This report documents a study to determine alternatives for modernizing the central heating plant at the Defense Personnel Support Center (DPSC), Philadelphia, PA. The central heating plant contains five boilers; four are 50 years old and one is 14 years old. The age of this equipment warranted an investigation of alternatives for providing thermal energy to the installation. These alternatives include maintaining the status quo, upgrading the existing system, installing new boilers, cogeneration, and absorption chilling. Heating and cooling loads were analyzed using computer simulations. Based on the simulations and design temperatures, life cycle costs were developed for each alternative. (MM)</description><subject>AGING(MATERIALS)</subject><subject>Air Condition, Heating, Lighting &amp; Ventilating</subject><subject>Air Pollution and Control</subject><subject>AIR QUALITY</subject><subject>BOILERS</subject><subject>CENTRAL HEATING PLANTS</subject><subject>COMPUTERIZED SIMULATION</subject><subject>COST EFFECTIVENESS</subject><subject>DEFENSE PERSONNEL SUPPORT CENTER</subject><subject>ELECTRIC POWER</subject><subject>ENERGY CONSUMPTION</subject><subject>FUEL CONSUMPTION</subject><subject>FUEL OIL</subject><subject>GAS TURBINES</subject><subject>HEATING PLANTS</subject><subject>LIFE CYCLE COSTS</subject><subject>STEAM</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1994</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZAhyTs0rKUrMUfBITSzJzEtXCMhJzCtR8M1PSS3Ky6wCiuXnKQSXlKZUKqTlFymUZKQquKSmpeYVpyoEpBYV5-flpeYoBJcWFOQXlSiAzEot4mFgTUvMKU7lhdLcDDJuriHOHropJZnJ8cVAW1JL4h1dHI0sjU1NjI0JSAMAy2A1Aw</recordid><startdate>199409</startdate><enddate>199409</enddate><creator>Savoie, Martin J</creator><creator>Price, Russ</creator><creator>Deligiannis, Spiro J</creator><creator>McCammon, Travis L</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>199409</creationdate><title>Central Heating Plant Modernization Study for the Defense Personnel Support Center</title><author>Savoie, Martin J ; Price, Russ ; Deligiannis, Spiro J ; McCammon, Travis L</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA2935433</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1994</creationdate><topic>AGING(MATERIALS)</topic><topic>Air Condition, Heating, Lighting &amp; Ventilating</topic><topic>Air Pollution and Control</topic><topic>AIR QUALITY</topic><topic>BOILERS</topic><topic>CENTRAL HEATING PLANTS</topic><topic>COMPUTERIZED SIMULATION</topic><topic>COST EFFECTIVENESS</topic><topic>DEFENSE PERSONNEL SUPPORT CENTER</topic><topic>ELECTRIC POWER</topic><topic>ENERGY CONSUMPTION</topic><topic>FUEL CONSUMPTION</topic><topic>FUEL OIL</topic><topic>GAS TURBINES</topic><topic>HEATING PLANTS</topic><topic>LIFE CYCLE COSTS</topic><topic>STEAM</topic><toplevel>online_resources</toplevel><creatorcontrib>Savoie, Martin J</creatorcontrib><creatorcontrib>Price, Russ</creatorcontrib><creatorcontrib>Deligiannis, Spiro J</creatorcontrib><creatorcontrib>McCammon, Travis L</creatorcontrib><creatorcontrib>CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL ENERGY AND UTILITI ES SYSTEMS DIV</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Savoie, Martin J</au><au>Price, Russ</au><au>Deligiannis, Spiro J</au><au>McCammon, Travis L</au><aucorp>CONSTRUCTION ENGINEERING RESEARCH LAB (ARMY) CHAMPAIGN IL ENERGY AND UTILITI ES SYSTEMS DIV</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Central Heating Plant Modernization Study for the Defense Personnel Support Center</btitle><date>1994-09</date><risdate>1994</risdate><abstract>This report documents a study to determine alternatives for modernizing the central heating plant at the Defense Personnel Support Center (DPSC), Philadelphia, PA. The central heating plant contains five boilers; four are 50 years old and one is 14 years old. The age of this equipment warranted an investigation of alternatives for providing thermal energy to the installation. These alternatives include maintaining the status quo, upgrading the existing system, installing new boilers, cogeneration, and absorption chilling. Heating and cooling loads were analyzed using computer simulations. Based on the simulations and design temperatures, life cycle costs were developed for each alternative. (MM)</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_dtic_stinet_ADA293543
source DTIC Technical Reports
subjects AGING(MATERIALS)
Air Condition, Heating, Lighting & Ventilating
Air Pollution and Control
AIR QUALITY
BOILERS
CENTRAL HEATING PLANTS
COMPUTERIZED SIMULATION
COST EFFECTIVENESS
DEFENSE PERSONNEL SUPPORT CENTER
ELECTRIC POWER
ENERGY CONSUMPTION
FUEL CONSUMPTION
FUEL OIL
GAS TURBINES
HEATING PLANTS
LIFE CYCLE COSTS
STEAM
title Central Heating Plant Modernization Study for the Defense Personnel Support Center
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T01%3A48%3A11IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Central%20Heating%20Plant%20Modernization%20Study%20for%20the%20Defense%20Personnel%20Support%20Center&rft.au=Savoie,%20Martin%20J&rft.aucorp=CONSTRUCTION%20ENGINEERING%20RESEARCH%20LAB%20(ARMY)%20CHAMPAIGN%20IL%20ENERGY%20AND%20UTILITI%20ES%20SYSTEMS%20DIV&rft.date=1994-09&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA293543%3C/dtic_1RU%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true