Full-Scale Incineration System Trial Burns at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 2, Part 2

This technical report is divided into eight volumes. This portion of the report comprises Volume III, which is further divided into two parts, including the appendixes. This volume describes the tests conducted on a 100 ton/day mobile incinerator that was used to process soil contamination with the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Haley, Dan J, Thomas, R W
Format: Report
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This technical report is divided into eight volumes. This portion of the report comprises Volume III, which is further divided into two parts, including the appendixes. This volume describes the tests conducted on a 100 ton/day mobile incinerator that was used to process soil contamination with the constituents of Herbicide Orange, namely 2,4,5-T, 2,4-D, and trace quantities of dioxin. The purpose of the tests was to determine if the incinerator could satisfy requirements of the Resource Conservation and Battalion Center in Gulfport, Mississippi. This volume provides specific details concerning the planning efforts and data results from the tests. Project managers and field engineers responsible for planning and implementation of hazardous waste remedial actions should find the information in this report to be very useful. See also Volume 4, AD-A251 930.