Plan for Testing Alternative Preassignment Systems. Volume I. Main Report
This plan for testing Individual Ready Reserve (IRR) pressignment systems in Fy 78 is designed to generate the quantitative and qualitative data needed to determine the costs and benefits of two alternative IRR preassignment systems: (1) preassignment of IRR members to early deploying units and (2)...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Report |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hobson,Victor W Berger,Doris C Chiorini,John R Eakins,Richard C Waite,Barbara J |
description | This plan for testing Individual Ready Reserve (IRR) pressignment systems in Fy 78 is designed to generate the quantitative and qualitative data needed to determine the costs and benefits of two alternative IRR preassignment systems: (1) preassignment of IRR members to early deploying units and (2) preassignment to mobilization stations. Benefits are defined in terms of system capabilities to satisfy early personnel fill requirements; costs, in terms of resource requirements, difficulties and other impacts anticipated in concept implementation. The test plan is based on the premise that pretest baseline data, including data on the operation of the present IRR mobilization system, will be developed prior to the initiation of the FY 78 preassignment test program. Three methods of testing are proposed for FY 78: (1) exercises to be accomplished in conjunction with JTX BOLD EAGLE 78 to test the unit preassignment system and in conjunction with a FORSCOM corps-level CPX to test mobilization station preassignment; (2) a survey addressed to samples of voluntary and involuntary preassignees; and (3) file analysis of data related to preassignment that may now be available or will be generated in the future.
See also Volume 2, AD-A026 241. |
format | Report |
fullrecord | <record><control><sourceid>dtic_1RU</sourceid><recordid>TN_cdi_dtic_stinet_ADA026240</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>ADA026240</sourcerecordid><originalsourceid>FETCH-dtic_stinet_ADA0262403</originalsourceid><addsrcrecordid>eNrjZPAMyEnMU0jLL1IISS0uycxLV3DMKUktykssySxLVQgoSk0sLs5Mz8tNzStRCK4sLknNLdZTCMvPKc1NVfDUU_BNzMxTCEotyC8q4WFgTUvMKU7lhdLcDDJuriHOHropJZnJ8SCzU0viHV0cDYzMjEwMjAlIAwCRsjEN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>report</recordtype></control><display><type>report</type><title>Plan for Testing Alternative Preassignment Systems. Volume I. Main Report</title><source>DTIC Technical Reports</source><creator>Hobson,Victor W ; Berger,Doris C ; Chiorini,John R ; Eakins,Richard C ; Waite,Barbara J</creator><creatorcontrib>Hobson,Victor W ; Berger,Doris C ; Chiorini,John R ; Eakins,Richard C ; Waite,Barbara J ; LITTON MELLONICS SYSTEMS DEVELOPMENT DIV FALLS CHURCH VA</creatorcontrib><description>This plan for testing Individual Ready Reserve (IRR) pressignment systems in Fy 78 is designed to generate the quantitative and qualitative data needed to determine the costs and benefits of two alternative IRR preassignment systems: (1) preassignment of IRR members to early deploying units and (2) preassignment to mobilization stations. Benefits are defined in terms of system capabilities to satisfy early personnel fill requirements; costs, in terms of resource requirements, difficulties and other impacts anticipated in concept implementation. The test plan is based on the premise that pretest baseline data, including data on the operation of the present IRR mobilization system, will be developed prior to the initiation of the FY 78 preassignment test program. Three methods of testing are proposed for FY 78: (1) exercises to be accomplished in conjunction with JTX BOLD EAGLE 78 to test the unit preassignment system and in conjunction with a FORSCOM corps-level CPX to test mobilization station preassignment; (2) a survey addressed to samples of voluntary and involuntary preassignees; and (3) file analysis of data related to preassignment that may now be available or will be generated in the future.
See also Volume 2, AD-A026 241.</description><language>eng</language><subject>ALLOCATIONS ; ARMY PERSONNEL ; Bold eagle exercise ; DISTRIBUTION ; Individual ready reserve ; Involuntary assignment ; IRR(Individual ready reserve) ; MILITARY EXERCISES ; Military Operations, Strategy and Tactics ; MILITARY ORGANIZATIONS ; MILITARY RESERVES ; MOBILIZATION ; Mobilization stations ; OPERATIONAL READINESS ; Personnel Management and Labor Relations ; Preassignment ; Reserve personnel ; STATIONS ; Voluntary assignment</subject><creationdate>1976</creationdate><rights>APPROVED FOR PUBLIC RELEASE</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,780,885,27567,27568</link.rule.ids><linktorsrc>$$Uhttps://apps.dtic.mil/sti/citations/ADA026240$$EView_record_in_DTIC$$FView_record_in_$$GDTIC$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hobson,Victor W</creatorcontrib><creatorcontrib>Berger,Doris C</creatorcontrib><creatorcontrib>Chiorini,John R</creatorcontrib><creatorcontrib>Eakins,Richard C</creatorcontrib><creatorcontrib>Waite,Barbara J</creatorcontrib><creatorcontrib>LITTON MELLONICS SYSTEMS DEVELOPMENT DIV FALLS CHURCH VA</creatorcontrib><title>Plan for Testing Alternative Preassignment Systems. Volume I. Main Report</title><description>This plan for testing Individual Ready Reserve (IRR) pressignment systems in Fy 78 is designed to generate the quantitative and qualitative data needed to determine the costs and benefits of two alternative IRR preassignment systems: (1) preassignment of IRR members to early deploying units and (2) preassignment to mobilization stations. Benefits are defined in terms of system capabilities to satisfy early personnel fill requirements; costs, in terms of resource requirements, difficulties and other impacts anticipated in concept implementation. The test plan is based on the premise that pretest baseline data, including data on the operation of the present IRR mobilization system, will be developed prior to the initiation of the FY 78 preassignment test program. Three methods of testing are proposed for FY 78: (1) exercises to be accomplished in conjunction with JTX BOLD EAGLE 78 to test the unit preassignment system and in conjunction with a FORSCOM corps-level CPX to test mobilization station preassignment; (2) a survey addressed to samples of voluntary and involuntary preassignees; and (3) file analysis of data related to preassignment that may now be available or will be generated in the future.
See also Volume 2, AD-A026 241.</description><subject>ALLOCATIONS</subject><subject>ARMY PERSONNEL</subject><subject>Bold eagle exercise</subject><subject>DISTRIBUTION</subject><subject>Individual ready reserve</subject><subject>Involuntary assignment</subject><subject>IRR(Individual ready reserve)</subject><subject>MILITARY EXERCISES</subject><subject>Military Operations, Strategy and Tactics</subject><subject>MILITARY ORGANIZATIONS</subject><subject>MILITARY RESERVES</subject><subject>MOBILIZATION</subject><subject>Mobilization stations</subject><subject>OPERATIONAL READINESS</subject><subject>Personnel Management and Labor Relations</subject><subject>Preassignment</subject><subject>Reserve personnel</subject><subject>STATIONS</subject><subject>Voluntary assignment</subject><fulltext>true</fulltext><rsrctype>report</rsrctype><creationdate>1976</creationdate><recordtype>report</recordtype><sourceid>1RU</sourceid><recordid>eNrjZPAMyEnMU0jLL1IISS0uycxLV3DMKUktykssySxLVQgoSk0sLs5Mz8tNzStRCK4sLknNLdZTCMvPKc1NVfDUU_BNzMxTCEotyC8q4WFgTUvMKU7lhdLcDDJuriHOHropJZnJ8SCzU0viHV0cDYzMjEwMjAlIAwCRsjEN</recordid><startdate>197606</startdate><enddate>197606</enddate><creator>Hobson,Victor W</creator><creator>Berger,Doris C</creator><creator>Chiorini,John R</creator><creator>Eakins,Richard C</creator><creator>Waite,Barbara J</creator><scope>1RU</scope><scope>BHM</scope></search><sort><creationdate>197606</creationdate><title>Plan for Testing Alternative Preassignment Systems. Volume I. Main Report</title><author>Hobson,Victor W ; Berger,Doris C ; Chiorini,John R ; Eakins,Richard C ; Waite,Barbara J</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-dtic_stinet_ADA0262403</frbrgroupid><rsrctype>reports</rsrctype><prefilter>reports</prefilter><language>eng</language><creationdate>1976</creationdate><topic>ALLOCATIONS</topic><topic>ARMY PERSONNEL</topic><topic>Bold eagle exercise</topic><topic>DISTRIBUTION</topic><topic>Individual ready reserve</topic><topic>Involuntary assignment</topic><topic>IRR(Individual ready reserve)</topic><topic>MILITARY EXERCISES</topic><topic>Military Operations, Strategy and Tactics</topic><topic>MILITARY ORGANIZATIONS</topic><topic>MILITARY RESERVES</topic><topic>MOBILIZATION</topic><topic>Mobilization stations</topic><topic>OPERATIONAL READINESS</topic><topic>Personnel Management and Labor Relations</topic><topic>Preassignment</topic><topic>Reserve personnel</topic><topic>STATIONS</topic><topic>Voluntary assignment</topic><toplevel>online_resources</toplevel><creatorcontrib>Hobson,Victor W</creatorcontrib><creatorcontrib>Berger,Doris C</creatorcontrib><creatorcontrib>Chiorini,John R</creatorcontrib><creatorcontrib>Eakins,Richard C</creatorcontrib><creatorcontrib>Waite,Barbara J</creatorcontrib><creatorcontrib>LITTON MELLONICS SYSTEMS DEVELOPMENT DIV FALLS CHURCH VA</creatorcontrib><collection>DTIC Technical Reports</collection><collection>DTIC STINET</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hobson,Victor W</au><au>Berger,Doris C</au><au>Chiorini,John R</au><au>Eakins,Richard C</au><au>Waite,Barbara J</au><aucorp>LITTON MELLONICS SYSTEMS DEVELOPMENT DIV FALLS CHURCH VA</aucorp><format>book</format><genre>unknown</genre><ristype>RPRT</ristype><btitle>Plan for Testing Alternative Preassignment Systems. Volume I. Main Report</btitle><date>1976-06</date><risdate>1976</risdate><abstract>This plan for testing Individual Ready Reserve (IRR) pressignment systems in Fy 78 is designed to generate the quantitative and qualitative data needed to determine the costs and benefits of two alternative IRR preassignment systems: (1) preassignment of IRR members to early deploying units and (2) preassignment to mobilization stations. Benefits are defined in terms of system capabilities to satisfy early personnel fill requirements; costs, in terms of resource requirements, difficulties and other impacts anticipated in concept implementation. The test plan is based on the premise that pretest baseline data, including data on the operation of the present IRR mobilization system, will be developed prior to the initiation of the FY 78 preassignment test program. Three methods of testing are proposed for FY 78: (1) exercises to be accomplished in conjunction with JTX BOLD EAGLE 78 to test the unit preassignment system and in conjunction with a FORSCOM corps-level CPX to test mobilization station preassignment; (2) a survey addressed to samples of voluntary and involuntary preassignees; and (3) file analysis of data related to preassignment that may now be available or will be generated in the future.
See also Volume 2, AD-A026 241.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_dtic_stinet_ADA026240 |
source | DTIC Technical Reports |
subjects | ALLOCATIONS ARMY PERSONNEL Bold eagle exercise DISTRIBUTION Individual ready reserve Involuntary assignment IRR(Individual ready reserve) MILITARY EXERCISES Military Operations, Strategy and Tactics MILITARY ORGANIZATIONS MILITARY RESERVES MOBILIZATION Mobilization stations OPERATIONAL READINESS Personnel Management and Labor Relations Preassignment Reserve personnel STATIONS Voluntary assignment |
title | Plan for Testing Alternative Preassignment Systems. Volume I. Main Report |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T05%3A09%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-dtic_1RU&rft_val_fmt=info:ofi/fmt:kev:mtx:book&rft.genre=unknown&rft.btitle=Plan%20for%20Testing%20Alternative%20Preassignment%20Systems.%20Volume%20I.%20Main%20Report&rft.au=Hobson,Victor%20W&rft.aucorp=LITTON%20MELLONICS%20SYSTEMS%20DEVELOPMENT%20DIV%20FALLS%20CHURCH%20VA&rft.date=1976-06&rft_id=info:doi/&rft_dat=%3Cdtic_1RU%3EADA026240%3C/dtic_1RU%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |