Electricity Transmission Strategy Research Based on Wind-Coal-Battery-Hydrogen-CCUS Multi Energy Coupling and Bundling System

[Introduction] In order to guarantee urban power supply and offshore wind power utilization without building new power lines, the paper aims to establish a electricity transmission strategy based on wind-coal-battery- hydrogen -CCUS multi energy coupling and bundling system, which is analyzed theore...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:南方能源建设 2023-07, Vol.10 (4), p.122-130
Hauptverfasser: Yilu ZHONG, Weixiong LIU, Yun ZHENG, Lu WANG, Jiamin YIN, Zhen LI, Kexin ZHENG, Kai XIAO
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:[Introduction] In order to guarantee urban power supply and offshore wind power utilization without building new power lines, the paper aims to establish a electricity transmission strategy based on wind-coal-battery- hydrogen -CCUS multi energy coupling and bundling system, which is analyzed theoretically and verified by simulation.[Method] To verify the effectiveness of the strategy, four experimental schemes (separate transmission of wind and coal power, bundled transmission of wind and coal power without operation coupling, bundled transmission of wind and coal power with operation coupling, and wind-coal-battery-hydrogen-CCUS coupled transmission) were set up, and based on the HOMER software environment and particle swarm optimization algorithm, the system operation simulation and index calculation of the test scheme are carried out.[Result] According to the simulation results, compared with normal separate transmission strategy, power transmission line capacity of system applying wind-coal bundled transmission strategy can be decreased by 2.2 GW, with an average utilization rate of 59%, i.e. 21%~23% higher. In the case that the wind power and coal power share the same transmission line without coordinated operation, the wind power curtailment is 164 GWh in total. System applying wind-coal-battery–hydrogen-CCUS bundled transmission strategy could avoid wind power curtailment and reduce carbon emission from unit power supply by about 30~33g/MWh. [Conclusion] In conclusion, the electricity transmission strategy established by this paper is supposed to be feasible and effective and contributing to planning and construction of offshore wind power project.
ISSN:2095-8676
DOI:10.16516/j.gedi.issn2095-8676.2023.04.012