FIG. 1. — This concrete bridge replaced a in Pigs and ritual-hunting among the highland Tau-Buhid in Mounts Iglit-Baco natural park, Philippines
FIG. 1. — This concrete bridge replaced a hanging bridge as part of the State modernization plan for the Mounts Iglit-Baco Natural Park. For many Tau-Buhid, the concrete bridge represents a denial of their legal and customary rights within and over the extent of their lands, and is a threat to the s...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Bild |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | FIG. 1. — This concrete bridge replaced a hanging bridge as part of the State modernization plan for the Mounts Iglit-Baco Natural Park. For many Tau-Buhid, the concrete bridge represents a denial of their legal and customary rights within and over the extent of their lands, and is a threat to the survival of their way of life. Through this bridge, State surveillance and control of highland activities intensified. Photo credits: C. A. Rosales. |
---|---|
DOI: | 10.5281/zenodo.5036727 |