Probabilistic estimation of annual lost economic production due to premature deaths because of earthquakes
A methodology to estimate, in a probabilistic way, the annual cost to society of premature deaths because of earthquakes is proposed in this article. The methodology makes use of results obtained by means of prospective and probabilistic seismic risk assessments where expected deaths caused by the c...
Gespeichert in:
Veröffentlicht in: | Human and ecological risk assessment 2016-02, Vol.22 (2), p.543-557 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!