Possibility of rehabilitation and overhang the dam 6 at the "Valja Fundata" tailing dump in Majdanpek

In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mining and Metallurgy Engineering Bor (Online) 2023, Vol.2023 (2), p.17-32
Hauptverfasser: Milutinović, Sandra, Obradović, Ljubiša, Tašić, Dušan, Rajković, Radmilo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage front through the outer slope of the embankment, its rapid rehabilitation is necessary. In this paper, the problems affecting the rehabilitation and further overhang of the tailing dump are present.
ISSN:2334-8836
2406-1395
DOI:10.5937/mmeb2302017M