Possibility of rehabilitation and overhang the dam 6 at the "Valja Fundata" tailing dump in Majdanpek
In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage...
Gespeichert in:
Veröffentlicht in: | Mining and Metallurgy Engineering Bor (Online) 2023, Vol.2023 (2), p.17-32 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In order to enable further overhang of the flotation tailing dump and its exploitation in the safe and stable conditions up to the designed elevation of K+545 m altitude, since the stability coefficients in a part of the tailing dump next to PS Kaludjerica are below the minimum due to a wide seepage front through the outer slope of the embankment, its rapid rehabilitation is necessary. In this paper, the problems affecting the rehabilitation and further overhang of the tailing dump are present. |
---|---|
ISSN: | 2334-8836 2406-1395 |
DOI: | 10.5937/mmeb2302017M |