Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide

The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Ma...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mining and Metallurgy Engineering Bor 2022, Vol.2022 (1), p.19-24
Hauptverfasser: Kržanović, Daniel, Rajković, Radmilo, Vušović, Nenad, Milutinović, Sandra
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 24
container_issue 1
container_start_page 19
container_title Mining and Metallurgy Engineering Bor
container_volume 2022
creator Kržanović, Daniel
Rajković, Radmilo
Vušović, Nenad
Milutinović, Sandra
description The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.
doi_str_mv 10.5937/mmeb2201019K
format Article
fullrecord <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_crossref_primary_10_5937_mmeb2201019K</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2</doaj_id><sourcerecordid>oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2</sourcerecordid><originalsourceid>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</originalsourceid><addsrcrecordid>eNpVkctOwzAURCMEEhV0xwf4AwjYseM4S1SeAoQE3Ud-XLeG1I5sF8RX8Muk5SFY3dEdzZnFFMURwSd1S5vT1QpUVWGCSXu7U0wqhnlJaFvvjppSVgpB-X4xTckpzFhT04o1k-LjEXTwKce1zi54FCzKS0A-xLx8g5QhepT6MMCPM0qPBpfRU1jnJbp33vkFOncjwumM7uWzkX6AF2RD3AaGdRxC2ubj_66NK0f5CqiX3qTeGTgs9qzsE0y_70Exv7yYz67Lu4erm9nZXamJYC8lJ8wS1XCrMK15hWthAQtlpeWKU6MkIdQIKolVtMLAMdUAugbCasGIoAfFzRfWBPncDdGtZHzvgnTd9hHiopMxO91DZxoDhivSGtCMYNlaENxoaQyrNNXVyDr-YukYUopgf3kEd5tpur_T0E_EyoaE</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><source>Directory of Open Access Journals</source><source>Free E-Journal (出版社公開部分のみ)</source><creator>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</creator><creatorcontrib>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</creatorcontrib><description>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</description><identifier>ISSN: 2334-8836</identifier><identifier>EISSN: 2406-1395</identifier><identifier>DOI: 10.5937/mmeb2201019K</identifier><language>eng</language><publisher>Mining and Metallurgy Institute, Bor</publisher><subject>geovia gems software ; infrastructure facilities ; material landslide</subject><ispartof>Mining and Metallurgy Engineering Bor, 2022, Vol.2022 (1), p.19-24</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</citedby><cites>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</cites><orcidid>0000-0003-3841-8667 ; 0000-0001-5246-4243</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,864,4024,27923,27924,27925</link.rule.ids></links><search><creatorcontrib>Kržanović, Daniel</creatorcontrib><creatorcontrib>Rajković, Radmilo</creatorcontrib><creatorcontrib>Vušović, Nenad</creatorcontrib><creatorcontrib>Milutinović, Sandra</creatorcontrib><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><title>Mining and Metallurgy Engineering Bor</title><description>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</description><subject>geovia gems software</subject><subject>infrastructure facilities</subject><subject>material landslide</subject><issn>2334-8836</issn><issn>2406-1395</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpVkctOwzAURCMEEhV0xwf4AwjYseM4S1SeAoQE3Ud-XLeG1I5sF8RX8Muk5SFY3dEdzZnFFMURwSd1S5vT1QpUVWGCSXu7U0wqhnlJaFvvjppSVgpB-X4xTckpzFhT04o1k-LjEXTwKce1zi54FCzKS0A-xLx8g5QhepT6MMCPM0qPBpfRU1jnJbp33vkFOncjwumM7uWzkX6AF2RD3AaGdRxC2ubj_66NK0f5CqiX3qTeGTgs9qzsE0y_70Exv7yYz67Lu4erm9nZXamJYC8lJ8wS1XCrMK15hWthAQtlpeWKU6MkIdQIKolVtMLAMdUAugbCasGIoAfFzRfWBPncDdGtZHzvgnTd9hHiopMxO91DZxoDhivSGtCMYNlaENxoaQyrNNXVyDr-YukYUopgf3kEd5tpur_T0E_EyoaE</recordid><startdate>2022</startdate><enddate>2022</enddate><creator>Kržanović, Daniel</creator><creator>Rajković, Radmilo</creator><creator>Vušović, Nenad</creator><creator>Milutinović, Sandra</creator><general>Mining and Metallurgy Institute, Bor</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0003-3841-8667</orcidid><orcidid>https://orcid.org/0000-0001-5246-4243</orcidid></search><sort><creationdate>2022</creationdate><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><author>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>geovia gems software</topic><topic>infrastructure facilities</topic><topic>material landslide</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kržanović, Daniel</creatorcontrib><creatorcontrib>Rajković, Radmilo</creatorcontrib><creatorcontrib>Vušović, Nenad</creatorcontrib><creatorcontrib>Milutinović, Sandra</creatorcontrib><collection>CrossRef</collection><collection>Directory of Open Access Journals</collection><jtitle>Mining and Metallurgy Engineering Bor</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kržanović, Daniel</au><au>Rajković, Radmilo</au><au>Vušović, Nenad</au><au>Milutinović, Sandra</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</atitle><jtitle>Mining and Metallurgy Engineering Bor</jtitle><date>2022</date><risdate>2022</risdate><volume>2022</volume><issue>1</issue><spage>19</spage><epage>24</epage><pages>19-24</pages><issn>2334-8836</issn><eissn>2406-1395</eissn><abstract>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</abstract><pub>Mining and Metallurgy Institute, Bor</pub><doi>10.5937/mmeb2201019K</doi><tpages>6</tpages><orcidid>https://orcid.org/0000-0003-3841-8667</orcidid><orcidid>https://orcid.org/0000-0001-5246-4243</orcidid><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2334-8836
ispartof Mining and Metallurgy Engineering Bor, 2022, Vol.2022 (1), p.19-24
issn 2334-8836
2406-1395
language eng
recordid cdi_crossref_primary_10_5937_mmeb2201019K
source Directory of Open Access Journals; Free E-Journal (出版社公開部分のみ)
subjects geovia gems software
infrastructure facilities
material landslide
title Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T05%3A51%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Reconstruction%20of%20the%20northwestern%20slope%20of%20the%20open%20pit%20South%20Mining%20District%20Majdanpek%20for%20the%20purpose%20of%20reconstruction%20the%20active%20landslide&rft.jtitle=Mining%20and%20Metallurgy%20Engineering%20Bor&rft.au=Kr%C5%BEanovi%C4%87,%20Daniel&rft.date=2022&rft.volume=2022&rft.issue=1&rft.spage=19&rft.epage=24&rft.pages=19-24&rft.issn=2334-8836&rft.eissn=2406-1395&rft_id=info:doi/10.5937/mmeb2201019K&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2%3C/doaj_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_doaj_id=oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2&rfr_iscdi=true