Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide
The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Ma...
Gespeichert in:
Veröffentlicht in: | Mining and Metallurgy Engineering Bor 2022, Vol.2022 (1), p.19-24 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 24 |
---|---|
container_issue | 1 |
container_start_page | 19 |
container_title | Mining and Metallurgy Engineering Bor |
container_volume | 2022 |
creator | Kržanović, Daniel Rajković, Radmilo Vušović, Nenad Milutinović, Sandra |
description | The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek. |
doi_str_mv | 10.5937/mmeb2201019K |
format | Article |
fullrecord | <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_crossref_primary_10_5937_mmeb2201019K</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2</doaj_id><sourcerecordid>oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2</sourcerecordid><originalsourceid>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</originalsourceid><addsrcrecordid>eNpVkctOwzAURCMEEhV0xwf4AwjYseM4S1SeAoQE3Ud-XLeG1I5sF8RX8Muk5SFY3dEdzZnFFMURwSd1S5vT1QpUVWGCSXu7U0wqhnlJaFvvjppSVgpB-X4xTckpzFhT04o1k-LjEXTwKce1zi54FCzKS0A-xLx8g5QhepT6MMCPM0qPBpfRU1jnJbp33vkFOncjwumM7uWzkX6AF2RD3AaGdRxC2ubj_66NK0f5CqiX3qTeGTgs9qzsE0y_70Exv7yYz67Lu4erm9nZXamJYC8lJ8wS1XCrMK15hWthAQtlpeWKU6MkIdQIKolVtMLAMdUAugbCasGIoAfFzRfWBPncDdGtZHzvgnTd9hHiopMxO91DZxoDhivSGtCMYNlaENxoaQyrNNXVyDr-YukYUopgf3kEd5tpur_T0E_EyoaE</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><source>Directory of Open Access Journals</source><source>Free E-Journal (出版社公開部分のみ)</source><creator>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</creator><creatorcontrib>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</creatorcontrib><description>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</description><identifier>ISSN: 2334-8836</identifier><identifier>EISSN: 2406-1395</identifier><identifier>DOI: 10.5937/mmeb2201019K</identifier><language>eng</language><publisher>Mining and Metallurgy Institute, Bor</publisher><subject>geovia gems software ; infrastructure facilities ; material landslide</subject><ispartof>Mining and Metallurgy Engineering Bor, 2022, Vol.2022 (1), p.19-24</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</citedby><cites>FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</cites><orcidid>0000-0003-3841-8667 ; 0000-0001-5246-4243</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,864,4024,27923,27924,27925</link.rule.ids></links><search><creatorcontrib>Kržanović, Daniel</creatorcontrib><creatorcontrib>Rajković, Radmilo</creatorcontrib><creatorcontrib>Vušović, Nenad</creatorcontrib><creatorcontrib>Milutinović, Sandra</creatorcontrib><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><title>Mining and Metallurgy Engineering Bor</title><description>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</description><subject>geovia gems software</subject><subject>infrastructure facilities</subject><subject>material landslide</subject><issn>2334-8836</issn><issn>2406-1395</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>DOA</sourceid><recordid>eNpVkctOwzAURCMEEhV0xwf4AwjYseM4S1SeAoQE3Ud-XLeG1I5sF8RX8Muk5SFY3dEdzZnFFMURwSd1S5vT1QpUVWGCSXu7U0wqhnlJaFvvjppSVgpB-X4xTckpzFhT04o1k-LjEXTwKce1zi54FCzKS0A-xLx8g5QhepT6MMCPM0qPBpfRU1jnJbp33vkFOncjwumM7uWzkX6AF2RD3AaGdRxC2ubj_66NK0f5CqiX3qTeGTgs9qzsE0y_70Exv7yYz67Lu4erm9nZXamJYC8lJ8wS1XCrMK15hWthAQtlpeWKU6MkIdQIKolVtMLAMdUAugbCasGIoAfFzRfWBPncDdGtZHzvgnTd9hHiopMxO91DZxoDhivSGtCMYNlaENxoaQyrNNXVyDr-YukYUopgf3kEd5tpur_T0E_EyoaE</recordid><startdate>2022</startdate><enddate>2022</enddate><creator>Kržanović, Daniel</creator><creator>Rajković, Radmilo</creator><creator>Vušović, Nenad</creator><creator>Milutinović, Sandra</creator><general>Mining and Metallurgy Institute, Bor</general><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0003-3841-8667</orcidid><orcidid>https://orcid.org/0000-0001-5246-4243</orcidid></search><sort><creationdate>2022</creationdate><title>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</title><author>Kržanović, Daniel ; Rajković, Radmilo ; Vušović, Nenad ; Milutinović, Sandra</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c184k-614f1b76fb03562058fe08bfaf6b63dba113d83a1fb320e603ceec5e14584183</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>geovia gems software</topic><topic>infrastructure facilities</topic><topic>material landslide</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kržanović, Daniel</creatorcontrib><creatorcontrib>Rajković, Radmilo</creatorcontrib><creatorcontrib>Vušović, Nenad</creatorcontrib><creatorcontrib>Milutinović, Sandra</creatorcontrib><collection>CrossRef</collection><collection>Directory of Open Access Journals</collection><jtitle>Mining and Metallurgy Engineering Bor</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kržanović, Daniel</au><au>Rajković, Radmilo</au><au>Vušović, Nenad</au><au>Milutinović, Sandra</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide</atitle><jtitle>Mining and Metallurgy Engineering Bor</jtitle><date>2022</date><risdate>2022</risdate><volume>2022</volume><issue>1</issue><spage>19</spage><epage>24</epage><pages>19-24</pages><issn>2334-8836</issn><eissn>2406-1395</eissn><abstract>The exploitation of copper ore in the Majdanpek Copper Mine takes place at the open pit South Mining District. The operation takes place in the complex conditions, and a special feature is that the capital infrastructure facilities: the state road M24, 35 kV transmission line and ri-verbed of the Mali Pek River are located in the northwestern contour of the open pit. Due to the occurrence of landslide in this part of the open pit, the continuity of the ore exploitation process in the mining system of excavation-processing was endangered, as well as the stability of infrastructure facilities. Reconstruction of the northwestern slope of the open pit will eliminate all existing and potential risks and create the conditions for functioning of the mine and town of Majdanpek.</abstract><pub>Mining and Metallurgy Institute, Bor</pub><doi>10.5937/mmeb2201019K</doi><tpages>6</tpages><orcidid>https://orcid.org/0000-0003-3841-8667</orcidid><orcidid>https://orcid.org/0000-0001-5246-4243</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2334-8836 |
ispartof | Mining and Metallurgy Engineering Bor, 2022, Vol.2022 (1), p.19-24 |
issn | 2334-8836 2406-1395 |
language | eng |
recordid | cdi_crossref_primary_10_5937_mmeb2201019K |
source | Directory of Open Access Journals; Free E-Journal (出版社公開部分のみ) |
subjects | geovia gems software infrastructure facilities material landslide |
title | Reconstruction of the northwestern slope of the open pit South Mining District Majdanpek for the purpose of reconstruction the active landslide |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T05%3A51%3A57IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Reconstruction%20of%20the%20northwestern%20slope%20of%20the%20open%20pit%20South%20Mining%20District%20Majdanpek%20for%20the%20purpose%20of%20reconstruction%20the%20active%20landslide&rft.jtitle=Mining%20and%20Metallurgy%20Engineering%20Bor&rft.au=Kr%C5%BEanovi%C4%87,%20Daniel&rft.date=2022&rft.volume=2022&rft.issue=1&rft.spage=19&rft.epage=24&rft.pages=19-24&rft.issn=2334-8836&rft.eissn=2406-1395&rft_id=info:doi/10.5937/mmeb2201019K&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2%3C/doaj_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_doaj_id=oai_doaj_org_article_d7ded6b19dec410a9fe86dcadd42c3c2&rfr_iscdi=true |