Contributing Factors of Time Overrun in Public Sector Construction Projects

Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Engineering, technology & applied science research technology & applied science research, 2018-10, Vol.8 (5), p.3369-3372
Hauptverfasser: Akhund, M. A., Imad, H. U., Memon, N. A., Siddiqui, F., Khoso, A. R., Panhwar, A. A.
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 3372
container_issue 5
container_start_page 3369
container_title Engineering, technology & applied science research
container_volume 8
creator Akhund, M. A.
Imad, H. U.
Memon, N. A.
Siddiqui, F.
Khoso, A. R.
Panhwar, A. A.
description Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.
doi_str_mv 10.48084/etasr.2276
format Article
fullrecord <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_48084_etasr_2276</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_48084_etasr_2276</sourcerecordid><originalsourceid>FETCH-LOGICAL-c163t-fb0bd39074c7cb1793d2f8c9fa7b029526250f32de333554e065a7cc350d60d13</originalsourceid><addsrcrecordid>eNotkE9LAzEQxYMouNSe_AK5y9bJ_-xRFqtioYL1vCTZRFLaXUmygt_ebXUuA_PePB4_hG4JrLgGze99MTmtKFXyAlVENbTWwOQlqijlpOZcq2u0zHkP80gtuaIVem3HoaRopxKHT7w2rowp4zHgXTx6vP32KU0DjgN-m-whOvzuTw48f-WSJlfiOEtp3M_nfIOugjlkv_zfC_Sxfty1z_Vm-_TSPmxqRyQrdbBge9aA4k45O_dkPQ3aNcEoC7QRVFIBgdHeM8aE4B6kMMo5JqCX0BO2QHd_uS6NOScfuq8Ujyb9dAS6M4rujKI7oWC_A0dSgQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Contributing Factors of Time Overrun in Public Sector Construction Projects</title><source>EZB-FREE-00999 freely available EZB journals</source><creator>Akhund, M. A. ; Imad, H. U. ; Memon, N. A. ; Siddiqui, F. ; Khoso, A. R. ; Panhwar, A. A.</creator><creatorcontrib>Akhund, M. A. ; Imad, H. U. ; Memon, N. A. ; Siddiqui, F. ; Khoso, A. R. ; Panhwar, A. A.</creatorcontrib><description>Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.</description><identifier>ISSN: 2241-4487</identifier><identifier>EISSN: 1792-8036</identifier><identifier>DOI: 10.48084/etasr.2276</identifier><language>eng</language><ispartof>Engineering, technology &amp; applied science research, 2018-10, Vol.8 (5), p.3369-3372</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c163t-fb0bd39074c7cb1793d2f8c9fa7b029526250f32de333554e065a7cc350d60d13</citedby><cites>FETCH-LOGICAL-c163t-fb0bd39074c7cb1793d2f8c9fa7b029526250f32de333554e065a7cc350d60d13</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Akhund, M. A.</creatorcontrib><creatorcontrib>Imad, H. U.</creatorcontrib><creatorcontrib>Memon, N. A.</creatorcontrib><creatorcontrib>Siddiqui, F.</creatorcontrib><creatorcontrib>Khoso, A. R.</creatorcontrib><creatorcontrib>Panhwar, A. A.</creatorcontrib><title>Contributing Factors of Time Overrun in Public Sector Construction Projects</title><title>Engineering, technology &amp; applied science research</title><description>Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.</description><issn>2241-4487</issn><issn>1792-8036</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><recordid>eNotkE9LAzEQxYMouNSe_AK5y9bJ_-xRFqtioYL1vCTZRFLaXUmygt_ebXUuA_PePB4_hG4JrLgGze99MTmtKFXyAlVENbTWwOQlqijlpOZcq2u0zHkP80gtuaIVem3HoaRopxKHT7w2rowp4zHgXTx6vP32KU0DjgN-m-whOvzuTw48f-WSJlfiOEtp3M_nfIOugjlkv_zfC_Sxfty1z_Vm-_TSPmxqRyQrdbBge9aA4k45O_dkPQ3aNcEoC7QRVFIBgdHeM8aE4B6kMMo5JqCX0BO2QHd_uS6NOScfuq8Ujyb9dAS6M4rujKI7oWC_A0dSgQ</recordid><startdate>20181013</startdate><enddate>20181013</enddate><creator>Akhund, M. A.</creator><creator>Imad, H. U.</creator><creator>Memon, N. A.</creator><creator>Siddiqui, F.</creator><creator>Khoso, A. R.</creator><creator>Panhwar, A. A.</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20181013</creationdate><title>Contributing Factors of Time Overrun in Public Sector Construction Projects</title><author>Akhund, M. A. ; Imad, H. U. ; Memon, N. A. ; Siddiqui, F. ; Khoso, A. R. ; Panhwar, A. A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c163t-fb0bd39074c7cb1793d2f8c9fa7b029526250f32de333554e065a7cc350d60d13</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Akhund, M. A.</creatorcontrib><creatorcontrib>Imad, H. U.</creatorcontrib><creatorcontrib>Memon, N. A.</creatorcontrib><creatorcontrib>Siddiqui, F.</creatorcontrib><creatorcontrib>Khoso, A. R.</creatorcontrib><creatorcontrib>Panhwar, A. A.</creatorcontrib><collection>CrossRef</collection><jtitle>Engineering, technology &amp; applied science research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Akhund, M. A.</au><au>Imad, H. U.</au><au>Memon, N. A.</au><au>Siddiqui, F.</au><au>Khoso, A. R.</au><au>Panhwar, A. A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Contributing Factors of Time Overrun in Public Sector Construction Projects</atitle><jtitle>Engineering, technology &amp; applied science research</jtitle><date>2018-10-13</date><risdate>2018</risdate><volume>8</volume><issue>5</issue><spage>3369</spage><epage>3372</epage><pages>3369-3372</pages><issn>2241-4487</issn><eissn>1792-8036</eissn><abstract>Time overrun is a major issue in construction projects. Its causes vary, depending upon the nature and size of the project. Developing countries are more susceptible to this problem due to limited resources and lack of managerial skills. This paper focuses on the identification and classification of time overrun factors in public sector projects in Pakistan. Data was collected by the use of a questionnaire given to different professionals in the construction field. Average index (AI) was used to determine each factor’s relative importance. Results indicate that financial difficulties faced by constructor, inadequate planning and scheduling, financial difficulties faced by client, delays in payment by the client, delays in decision making by the client, design mistakes, frequent design changes, material shortage, incompetent sub-constructor assigned by the constructor, poor site management and supervision and inadequate constructor’s experience are the most significant factors of time overrun in public sector construction projects in Pakistan. This study aims to be useful in addressing the issue of time overrun in the construction industry.</abstract><doi>10.48084/etasr.2276</doi><tpages>4</tpages></addata></record>
fulltext fulltext
identifier ISSN: 2241-4487
ispartof Engineering, technology & applied science research, 2018-10, Vol.8 (5), p.3369-3372
issn 2241-4487
1792-8036
language eng
recordid cdi_crossref_primary_10_48084_etasr_2276
source EZB-FREE-00999 freely available EZB journals
title Contributing Factors of Time Overrun in Public Sector Construction Projects
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-29T01%3A23%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Contributing%20Factors%20of%20Time%20Overrun%20in%20Public%20Sector%20Construction%20Projects&rft.jtitle=Engineering,%20technology%20&%20applied%20science%20research&rft.au=Akhund,%20M.%20A.&rft.date=2018-10-13&rft.volume=8&rft.issue=5&rft.spage=3369&rft.epage=3372&rft.pages=3369-3372&rft.issn=2241-4487&rft.eissn=1792-8036&rft_id=info:doi/10.48084/etasr.2276&rft_dat=%3Ccrossref%3E10_48084_etasr_2276%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true