SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS

Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Energija 2023-01, Vol.55 (1), p.96-119
Hauptverfasser: Davor Bajs, Nijaz Dizdarević, Goran Majstrović
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 119
container_issue 1
container_start_page 96
container_title Energija
container_volume 55
creator Davor Bajs
Nijaz Dizdarević
Goran Majstrović
description Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.
doi_str_mv 10.37798/2006551383
format Article
fullrecord <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_37798_2006551383</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_37798_2006551383</sourcerecordid><originalsourceid>FETCH-crossref_primary_10_37798_20065513833</originalsourceid><addsrcrecordid>eNqVT8tKAzEUDaLgoF31B-5eRpNmXl2mmTs0TJuU5A7F1VCkBUVRJiuX_rnxAa49mwPnBYexueC3sq6Xzd2C86oshWzkGctEUyxzXpfinGWcC5nXRdFcslmMTzyhEmW1EBn7CKgHb-geXAduh16RcRaUbcG0aMl0Rv9Iyd-5EMxqg7ByRBu0qPsAxkJwA61RBQIcfBoB8sqGrUnpVLRIe-d7GGyLHrbK90ignW3N1264Zhenw3M8zn75it10SHqdP0yvMU7H0_g2Pb4cpvdR8PH76Ph3VP4v_QnVtE5O</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS</title><source>EZB-FREE-00999 freely available EZB journals</source><creator>Davor Bajs ; Nijaz Dizdarević ; Goran Majstrović</creator><creatorcontrib>Davor Bajs ; Nijaz Dizdarević ; Goran Majstrović</creatorcontrib><description>Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.</description><identifier>ISSN: 0013-7448</identifier><identifier>EISSN: 1849-0751</identifier><identifier>DOI: 10.37798/2006551383</identifier><language>eng</language><ispartof>Energija, 2023-01, Vol.55 (1), p.96-119</ispartof><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27922,27923</link.rule.ids></links><search><creatorcontrib>Davor Bajs</creatorcontrib><creatorcontrib>Nijaz Dizdarević</creatorcontrib><creatorcontrib>Goran Majstrović</creatorcontrib><title>SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS</title><title>Energija</title><description>Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.</description><issn>0013-7448</issn><issn>1849-0751</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><recordid>eNqVT8tKAzEUDaLgoF31B-5eRpNmXl2mmTs0TJuU5A7F1VCkBUVRJiuX_rnxAa49mwPnBYexueC3sq6Xzd2C86oshWzkGctEUyxzXpfinGWcC5nXRdFcslmMTzyhEmW1EBn7CKgHb-geXAduh16RcRaUbcG0aMl0Rv9Iyd-5EMxqg7ByRBu0qPsAxkJwA61RBQIcfBoB8sqGrUnpVLRIe-d7GGyLHrbK90ignW3N1264Zhenw3M8zn75it10SHqdP0yvMU7H0_g2Pb4cpvdR8PH76Ph3VP4v_QnVtE5O</recordid><startdate>20230118</startdate><enddate>20230118</enddate><creator>Davor Bajs</creator><creator>Nijaz Dizdarević</creator><creator>Goran Majstrović</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20230118</creationdate><title>SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS</title><author>Davor Bajs ; Nijaz Dizdarević ; Goran Majstrović</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-crossref_primary_10_37798_20065513833</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><toplevel>online_resources</toplevel><creatorcontrib>Davor Bajs</creatorcontrib><creatorcontrib>Nijaz Dizdarević</creatorcontrib><creatorcontrib>Goran Majstrović</creatorcontrib><collection>CrossRef</collection><jtitle>Energija</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Davor Bajs</au><au>Nijaz Dizdarević</au><au>Goran Majstrović</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS</atitle><jtitle>Energija</jtitle><date>2023-01-18</date><risdate>2023</risdate><volume>55</volume><issue>1</issue><spage>96</spage><epage>119</epage><pages>96-119</pages><issn>0013-7448</issn><eissn>1849-0751</eissn><abstract>Based on the results of calculations of power flows and on the analysis of the operation of the HV transmission network in Southeast Europe, with the market focus on generation facilities, the basic characteristics of the network are described, and possible bottlenecks identified. The calculations were done within the EC-funded REBIS project (Regional Balkans Infrastructure Study) and the Generation Investment Study (GIS) of new power generation capacities in the region. The market offering of generation facilities in Southeast Europe at forecast system peak loads in 2010 and 2015, for different hydrological conditions, was determined by the WASP (IAEA) and GTMax (Argonne NL) software. Calculations of power flows were carried out by using the PSS/E software (Siemens PTI). The article particularly discuses simulated power plant output and the operation of the transmission network in the Republic of Croatia.</abstract><doi>10.37798/2006551383</doi></addata></record>
fulltext fulltext
identifier ISSN: 0013-7448
ispartof Energija, 2023-01, Vol.55 (1), p.96-119
issn 0013-7448
1849-0751
language eng
recordid cdi_crossref_primary_10_37798_2006551383
source EZB-FREE-00999 freely available EZB journals
title SECURITY OF OPERATION AND IDENTIFICATION OF POSSIBLE BOTTLENECKS IN SOUTHEAST EUROPE TRANSMISSION NETWORK UNDER MARKET CONDITIONS
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T06%3A40%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=SECURITY%20OF%20OPERATION%20AND%20IDENTIFICATION%20OF%20POSSIBLE%20BOTTLENECKS%20IN%20SOUTHEAST%20EUROPE%20TRANSMISSION%20NETWORK%20UNDER%20MARKET%20CONDITIONS&rft.jtitle=Energija&rft.au=Davor%20Bajs&rft.date=2023-01-18&rft.volume=55&rft.issue=1&rft.spage=96&rft.epage=119&rft.pages=96-119&rft.issn=0013-7448&rft.eissn=1849-0751&rft_id=info:doi/10.37798/2006551383&rft_dat=%3Ccrossref%3E10_37798_2006551383%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true