Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis
The rapid depletion of conventional fossil fuels with each passing day and increasing environmental concerns have given a great impetus to the studies on clean and renewable alternative energy sources. This study aims to investigate the feasibility of an on-grid, and off-grid hydro-wind-solar-batter...
Gespeichert in:
Veröffentlicht in: | Maǧallaẗ al-abḥath al-handasiyyaẗ 2023-03, Vol.11 (1 A), p.273-284 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 284 |
---|---|
container_issue | 1 A |
container_start_page | 273 |
container_title | Maǧallaẗ al-abḥath al-handasiyyaẗ |
container_volume | 11 |
creator | Coban, Hasan Husayn |
description | The rapid depletion of conventional fossil fuels with each passing day and increasing environmental concerns have given a great impetus to the studies on clean and renewable alternative energy sources. This study aims to investigate the feasibility of an on-grid, and off-grid hydro-wind-solar-battery hybrid system for electricity generation in Beledweyne, Somalia. The model is simulated with the HOMER program based on the energy-efficient system, has been successfully applied to find the best optimization result for the required amount of load. The economic and technical performance of a stand-alone combination of 100 kW hydropower, 200 kW solar photovoltaic, 400 kWh battery, and 80 kW wind power was investigated. Grid-connected megaprojects, such as large dams and energy pools, are essential but slow and expensive to increase national and regional power generation and transmission. This study is expected to shed light on investments to be made in Africa's off-grid and mini-grid solutions that are cheaper and faster to install and emphasizes that investments to be made in this direction can be a solution to Somalia's electricity crisis |
doi_str_mv | 10.36909/jer.16481 |
format | Article |
fullrecord | <record><control><sourceid>emarefa_cross</sourceid><recordid>TN_cdi_crossref_primary_10_36909_jer_16481</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1494674</sourcerecordid><originalsourceid>FETCH-LOGICAL-c128t-31e53cd07983572840cf3e5506d24e9101f683f29e649b3e07531136f72673343</originalsourceid><addsrcrecordid>eNpFkMtqwzAQRUVpoSHNph9QtC51K3n08jKEviDQTbs2sjxqFGy5SIbgv69JQruaO9zDXRxCbjl7BFWx6mmP6ZErYfgFWZTAdMGNkZd_Wetrssp5zxjjDIQEuSD7dc6Yc49xpIOnu6lJoaUJIx5s0yGdQ_qeaJ7yiD0NkTbYYXvAKSJ1YZybobddsA90RLeLwdmO2thSdEMc-vNruymHfEOuvO0yrs53Sb5enj83b8X24_V9s94WjpdmLICjBNcyXRmQujSCOQ8oJVNtKbDijHtlwJcVKlE1gExL4ByU16XSAAKW5P6069KQc0Jf_6TQ2zTVnNVHUfUsqj6KmuG7E4wzgd7-s6ISSgv4Bap6ZcE</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis</title><source>DOAJ Directory of Open Access Journals</source><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><source>Springer Nature OA Free Journals</source><source>ScienceDirect Journals (5 years ago - present)</source><creator>Coban, Hasan Husayn</creator><creatorcontrib>Coban, Hasan Husayn ; Ardahan University, Department of Electrical Engineering, 75002. Ardahan, Turkey</creatorcontrib><description>The rapid depletion of conventional fossil fuels with each passing day and increasing environmental concerns have given a great impetus to the studies on clean and renewable alternative energy sources. This study aims to investigate the feasibility of an on-grid, and off-grid hydro-wind-solar-battery hybrid system for electricity generation in Beledweyne, Somalia. The model is simulated with the HOMER program based on the energy-efficient system, has been successfully applied to find the best optimization result for the required amount of load. The economic and technical performance of a stand-alone combination of 100 kW hydropower, 200 kW solar photovoltaic, 400 kWh battery, and 80 kW wind power was investigated. Grid-connected megaprojects, such as large dams and energy pools, are essential but slow and expensive to increase national and regional power generation and transmission. This study is expected to shed light on investments to be made in Africa's off-grid and mini-grid solutions that are cheaper and faster to install and emphasizes that investments to be made in this direction can be a solution to Somalia's electricity crisis</description><identifier>ISSN: 2307-1877</identifier><identifier>EISSN: 2307-1885</identifier><identifier>DOI: 10.36909/jer.16481</identifier><language>eng</language><publisher>Kuwait: Kuwait University, Academic Publication Council</publisher><ispartof>Maǧallaẗ al-abḥath al-handasiyyaẗ, 2023-03, Vol.11 (1 A), p.273-284</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,778,782,862,27911,27912</link.rule.ids></links><search><creatorcontrib>Coban, Hasan Husayn</creatorcontrib><creatorcontrib>Ardahan University, Department of Electrical Engineering, 75002. Ardahan, Turkey</creatorcontrib><title>Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis</title><title>Maǧallaẗ al-abḥath al-handasiyyaẗ</title><description>The rapid depletion of conventional fossil fuels with each passing day and increasing environmental concerns have given a great impetus to the studies on clean and renewable alternative energy sources. This study aims to investigate the feasibility of an on-grid, and off-grid hydro-wind-solar-battery hybrid system for electricity generation in Beledweyne, Somalia. The model is simulated with the HOMER program based on the energy-efficient system, has been successfully applied to find the best optimization result for the required amount of load. The economic and technical performance of a stand-alone combination of 100 kW hydropower, 200 kW solar photovoltaic, 400 kWh battery, and 80 kW wind power was investigated. Grid-connected megaprojects, such as large dams and energy pools, are essential but slow and expensive to increase national and regional power generation and transmission. This study is expected to shed light on investments to be made in Africa's off-grid and mini-grid solutions that are cheaper and faster to install and emphasizes that investments to be made in this direction can be a solution to Somalia's electricity crisis</description><issn>2307-1877</issn><issn>2307-1885</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><recordid>eNpFkMtqwzAQRUVpoSHNph9QtC51K3n08jKEviDQTbs2sjxqFGy5SIbgv69JQruaO9zDXRxCbjl7BFWx6mmP6ZErYfgFWZTAdMGNkZd_Wetrssp5zxjjDIQEuSD7dc6Yc49xpIOnu6lJoaUJIx5s0yGdQ_qeaJ7yiD0NkTbYYXvAKSJ1YZybobddsA90RLeLwdmO2thSdEMc-vNruymHfEOuvO0yrs53Sb5enj83b8X24_V9s94WjpdmLICjBNcyXRmQujSCOQ8oJVNtKbDijHtlwJcVKlE1gExL4ByU16XSAAKW5P6069KQc0Jf_6TQ2zTVnNVHUfUsqj6KmuG7E4wzgd7-s6ISSgv4Bap6ZcE</recordid><startdate>20230301</startdate><enddate>20230301</enddate><creator>Coban, Hasan Husayn</creator><general>Kuwait University, Academic Publication Council</general><scope>ADJCN</scope><scope>AHFXO</scope><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20230301</creationdate><title>Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis</title><author>Coban, Hasan Husayn</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c128t-31e53cd07983572840cf3e5506d24e9101f683f29e649b3e07531136f72673343</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Coban, Hasan Husayn</creatorcontrib><creatorcontrib>Ardahan University, Department of Electrical Engineering, 75002. Ardahan, Turkey</creatorcontrib><collection>الدوريات العلمية والإحصائية - e-Marefa Academic and Statistical Periodicals</collection><collection>معرفة - المحتوى العربي الأكاديمي المتكامل - e-Marefa Academic Complete</collection><collection>CrossRef</collection><jtitle>Maǧallaẗ al-abḥath al-handasiyyaẗ</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Coban, Hasan Husayn</au><aucorp>Ardahan University, Department of Electrical Engineering, 75002. Ardahan, Turkey</aucorp><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis</atitle><jtitle>Maǧallaẗ al-abḥath al-handasiyyaẗ</jtitle><date>2023-03-01</date><risdate>2023</risdate><volume>11</volume><issue>1 A</issue><spage>273</spage><epage>284</epage><pages>273-284</pages><issn>2307-1877</issn><eissn>2307-1885</eissn><abstract>The rapid depletion of conventional fossil fuels with each passing day and increasing environmental concerns have given a great impetus to the studies on clean and renewable alternative energy sources. This study aims to investigate the feasibility of an on-grid, and off-grid hydro-wind-solar-battery hybrid system for electricity generation in Beledweyne, Somalia. The model is simulated with the HOMER program based on the energy-efficient system, has been successfully applied to find the best optimization result for the required amount of load. The economic and technical performance of a stand-alone combination of 100 kW hydropower, 200 kW solar photovoltaic, 400 kWh battery, and 80 kW wind power was investigated. Grid-connected megaprojects, such as large dams and energy pools, are essential but slow and expensive to increase national and regional power generation and transmission. This study is expected to shed light on investments to be made in Africa's off-grid and mini-grid solutions that are cheaper and faster to install and emphasizes that investments to be made in this direction can be a solution to Somalia's electricity crisis</abstract><cop>Kuwait</cop><pub>Kuwait University, Academic Publication Council</pub><doi>10.36909/jer.16481</doi><tpages>12</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2307-1877 |
ispartof | Maǧallaẗ al-abḥath al-handasiyyaẗ, 2023-03, Vol.11 (1 A), p.273-284 |
issn | 2307-1877 2307-1885 |
language | eng |
recordid | cdi_crossref_primary_10_36909_jer_16481 |
source | DOAJ Directory of Open Access Journals; Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals; Springer Nature OA Free Journals; ScienceDirect Journals (5 years ago - present) |
title | Assessment of hybrid renewable energy system in beledweyne city somalia, technical and economical analysis |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T04%3A12%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-emarefa_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Assessment%20of%20hybrid%20renewable%20energy%20system%20in%20beledweyne%20city%20somalia,%20technical%20and%20economical%20analysis&rft.jtitle=Ma%C7%A7alla%E1%BA%97%20al-ab%E1%B8%A5ath%20al-handasiyya%E1%BA%97&rft.au=Coban,%20Hasan%20Husayn&rft.aucorp=Ardahan%20University,%20Department%20of%20Electrical%20Engineering,%2075002.%20Ardahan,%20Turkey&rft.date=2023-03-01&rft.volume=11&rft.issue=1%20A&rft.spage=273&rft.epage=284&rft.pages=273-284&rft.issn=2307-1877&rft.eissn=2307-1885&rft_id=info:doi/10.36909/jer.16481&rft_dat=%3Cemarefa_cross%3E1494674%3C/emarefa_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |