Retrofitting and Rehabilitation of damage footbridge over Yamuna River
Every Structure has a certain predefined age with which it has to withstand, and after that, it requires the rehabilitation/repairing to avoid any damage or collapse. The footbridge over Yamuna River in Delhi, India was constructed in 1960 adjacent to Wazirabad barrage, and this is a very important...
Gespeichert in:
Veröffentlicht in: | International journal of recent technology and engineering 2019-07, Vol.8 (2), p.4239-4246 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 4246 |
---|---|
container_issue | 2 |
container_start_page | 4239 |
container_title | International journal of recent technology and engineering |
container_volume | 8 |
creator | Shukla, Anjani Kumar Maiti, Pabitra Ranjan |
description | Every Structure has a certain predefined age with which it has to withstand, and after that, it requires the rehabilitation/repairing to avoid any damage or collapse. The footbridge over Yamuna River in Delhi, India was constructed in 1960 adjacent to Wazirabad barrage, and this is a very important link to East Delhi and West Delhi. Due to heavy traffic plying on this footbridge, in due course of time, the signs of deterioration were visible in the bridge expansion joint assemblies in the deck slab and cantilever portion of footpath slab. There were many potholes also developed in the wearing course. It was also dilapidation observed in many portions of the footpath, and some portion of the footpath slab were collapsed. The cantilever portion of the footbridge was retrofitted with steel jacketing fixing in the main longitudinal girder of the bridge. In this study analysis of the cantilever footbridge slab retrofitted by a steel jacket was carried out to check the deflection and stress limit of the bridge and it is found that the bridge is safe and now Bridge is open for traffic. |
doi_str_mv | 10.35940/ijrte.B2667.078219 |
format | Article |
fullrecord | <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_35940_ijrte_B2667_078219</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_35940_ijrte_B2667_078219</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2099-2576f6cc64fa0f5b40cc3b3fc601620bb7ddac1a7e10ebcb2af4b8e7c1cb1e733</originalsourceid><addsrcrecordid>eNpN0EFLwzAcBfAgCo65T-AlX6D1n6RN2qMOp4OBUPTgKfyTJjNjbSSNgt_e0Xnw9N67vMOPkFsGpajbCu7CIWVXPnApVQmq4ay9IAvOlSpEo5rLf_2arKbpAABMSFYJuSCbzuUUfcg5jHuKY08794EmHEPGHOJIo6c9Drh31MeYTQr9qcZvl-g7Dl8j0i6cxg258nic3Oovl-Rt8_i6fi52L0_b9f2usBzatuC1kl5aKyuP4GtTgbXCCG8lMMnBGNX3aBkqx8AZazj6yjROWWYNc0qIJRHnX5viNCXn9WcKA6YfzUDPGnrW0LOGPmuIXzoLVdo</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Retrofitting and Rehabilitation of damage footbridge over Yamuna River</title><source>EZB-FREE-00999 freely available EZB journals</source><creator>Shukla, Anjani Kumar ; Maiti, Pabitra Ranjan</creator><creatorcontrib>Shukla, Anjani Kumar ; Maiti, Pabitra Ranjan ; Associate Professor, Department of Civil Engineering, Indian Institute of Technology (BHU) Varanasi, (U.P.), India ; Assistant Professor, Department of Structural Engineering, Kashi Institute of Technology Varanasi, (U.P.), India</creatorcontrib><description>Every Structure has a certain predefined age with which it has to withstand, and after that, it requires the rehabilitation/repairing to avoid any damage or collapse. The footbridge over Yamuna River in Delhi, India was constructed in 1960 adjacent to Wazirabad barrage, and this is a very important link to East Delhi and West Delhi. Due to heavy traffic plying on this footbridge, in due course of time, the signs of deterioration were visible in the bridge expansion joint assemblies in the deck slab and cantilever portion of footpath slab. There were many potholes also developed in the wearing course. It was also dilapidation observed in many portions of the footpath, and some portion of the footpath slab were collapsed. The cantilever portion of the footbridge was retrofitted with steel jacketing fixing in the main longitudinal girder of the bridge. In this study analysis of the cantilever footbridge slab retrofitted by a steel jacket was carried out to check the deflection and stress limit of the bridge and it is found that the bridge is safe and now Bridge is open for traffic.</description><identifier>ISSN: 2277-3878</identifier><identifier>EISSN: 2277-3878</identifier><identifier>DOI: 10.35940/ijrte.B2667.078219</identifier><language>eng</language><ispartof>International journal of recent technology and engineering, 2019-07, Vol.8 (2), p.4239-4246</ispartof><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c2099-2576f6cc64fa0f5b40cc3b3fc601620bb7ddac1a7e10ebcb2af4b8e7c1cb1e733</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Shukla, Anjani Kumar</creatorcontrib><creatorcontrib>Maiti, Pabitra Ranjan</creatorcontrib><creatorcontrib>Associate Professor, Department of Civil Engineering, Indian Institute of Technology (BHU) Varanasi, (U.P.), India</creatorcontrib><creatorcontrib>Assistant Professor, Department of Structural Engineering, Kashi Institute of Technology Varanasi, (U.P.), India</creatorcontrib><title>Retrofitting and Rehabilitation of damage footbridge over Yamuna River</title><title>International journal of recent technology and engineering</title><description>Every Structure has a certain predefined age with which it has to withstand, and after that, it requires the rehabilitation/repairing to avoid any damage or collapse. The footbridge over Yamuna River in Delhi, India was constructed in 1960 adjacent to Wazirabad barrage, and this is a very important link to East Delhi and West Delhi. Due to heavy traffic plying on this footbridge, in due course of time, the signs of deterioration were visible in the bridge expansion joint assemblies in the deck slab and cantilever portion of footpath slab. There were many potholes also developed in the wearing course. It was also dilapidation observed in many portions of the footpath, and some portion of the footpath slab were collapsed. The cantilever portion of the footbridge was retrofitted with steel jacketing fixing in the main longitudinal girder of the bridge. In this study analysis of the cantilever footbridge slab retrofitted by a steel jacket was carried out to check the deflection and stress limit of the bridge and it is found that the bridge is safe and now Bridge is open for traffic.</description><issn>2277-3878</issn><issn>2277-3878</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNpN0EFLwzAcBfAgCo65T-AlX6D1n6RN2qMOp4OBUPTgKfyTJjNjbSSNgt_e0Xnw9N67vMOPkFsGpajbCu7CIWVXPnApVQmq4ay9IAvOlSpEo5rLf_2arKbpAABMSFYJuSCbzuUUfcg5jHuKY08794EmHEPGHOJIo6c9Drh31MeYTQr9qcZvl-g7Dl8j0i6cxg258nic3Oovl-Rt8_i6fi52L0_b9f2usBzatuC1kl5aKyuP4GtTgbXCCG8lMMnBGNX3aBkqx8AZazj6yjROWWYNc0qIJRHnX5viNCXn9WcKA6YfzUDPGnrW0LOGPmuIXzoLVdo</recordid><startdate>20190730</startdate><enddate>20190730</enddate><creator>Shukla, Anjani Kumar</creator><creator>Maiti, Pabitra Ranjan</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20190730</creationdate><title>Retrofitting and Rehabilitation of damage footbridge over Yamuna River</title><author>Shukla, Anjani Kumar ; Maiti, Pabitra Ranjan</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2099-2576f6cc64fa0f5b40cc3b3fc601620bb7ddac1a7e10ebcb2af4b8e7c1cb1e733</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><toplevel>online_resources</toplevel><creatorcontrib>Shukla, Anjani Kumar</creatorcontrib><creatorcontrib>Maiti, Pabitra Ranjan</creatorcontrib><creatorcontrib>Associate Professor, Department of Civil Engineering, Indian Institute of Technology (BHU) Varanasi, (U.P.), India</creatorcontrib><creatorcontrib>Assistant Professor, Department of Structural Engineering, Kashi Institute of Technology Varanasi, (U.P.), India</creatorcontrib><collection>CrossRef</collection><jtitle>International journal of recent technology and engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Shukla, Anjani Kumar</au><au>Maiti, Pabitra Ranjan</au><aucorp>Associate Professor, Department of Civil Engineering, Indian Institute of Technology (BHU) Varanasi, (U.P.), India</aucorp><aucorp>Assistant Professor, Department of Structural Engineering, Kashi Institute of Technology Varanasi, (U.P.), India</aucorp><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Retrofitting and Rehabilitation of damage footbridge over Yamuna River</atitle><jtitle>International journal of recent technology and engineering</jtitle><date>2019-07-30</date><risdate>2019</risdate><volume>8</volume><issue>2</issue><spage>4239</spage><epage>4246</epage><pages>4239-4246</pages><issn>2277-3878</issn><eissn>2277-3878</eissn><abstract>Every Structure has a certain predefined age with which it has to withstand, and after that, it requires the rehabilitation/repairing to avoid any damage or collapse. The footbridge over Yamuna River in Delhi, India was constructed in 1960 adjacent to Wazirabad barrage, and this is a very important link to East Delhi and West Delhi. Due to heavy traffic plying on this footbridge, in due course of time, the signs of deterioration were visible in the bridge expansion joint assemblies in the deck slab and cantilever portion of footpath slab. There were many potholes also developed in the wearing course. It was also dilapidation observed in many portions of the footpath, and some portion of the footpath slab were collapsed. The cantilever portion of the footbridge was retrofitted with steel jacketing fixing in the main longitudinal girder of the bridge. In this study analysis of the cantilever footbridge slab retrofitted by a steel jacket was carried out to check the deflection and stress limit of the bridge and it is found that the bridge is safe and now Bridge is open for traffic.</abstract><doi>10.35940/ijrte.B2667.078219</doi><tpages>8</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2277-3878 |
ispartof | International journal of recent technology and engineering, 2019-07, Vol.8 (2), p.4239-4246 |
issn | 2277-3878 2277-3878 |
language | eng |
recordid | cdi_crossref_primary_10_35940_ijrte_B2667_078219 |
source | EZB-FREE-00999 freely available EZB journals |
title | Retrofitting and Rehabilitation of damage footbridge over Yamuna River |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T23%3A35%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Retrofitting%20and%20Rehabilitation%20of%20damage%20footbridge%20over%20Yamuna%20River&rft.jtitle=International%20journal%20of%20recent%20technology%20and%20engineering&rft.au=Shukla,%20Anjani%20Kumar&rft.aucorp=Associate%20Professor,%20Department%20of%20Civil%20Engineering,%20Indian%20Institute%20of%20Technology%20(BHU)%20Varanasi,%20(U.P.),%20India&rft.date=2019-07-30&rft.volume=8&rft.issue=2&rft.spage=4239&rft.epage=4246&rft.pages=4239-4246&rft.issn=2277-3878&rft.eissn=2277-3878&rft_id=info:doi/10.35940/ijrte.B2667.078219&rft_dat=%3Ccrossref%3E10_35940_ijrte_B2667_078219%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |