ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL

The estuary of River Sibelis is vessel traffic modes of fishermen and the risk rob flooding. The estuary of River Sibelis (STA 0+00 – STA 0+373) project employed some heavy equipment to undertake the project. The purpose of  find out the needs of heavy equipment, productivity of heavy equipment, the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Prokons 2019-07, Vol.12 (1), p.44
Hauptverfasser: Azhim, Fandi, ,, Suhariyanto, ,, Burhamtoro
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page 44
container_title Prokons
container_volume 12
creator Azhim, Fandi
,, Suhariyanto
,, Burhamtoro
description The estuary of River Sibelis is vessel traffic modes of fishermen and the risk rob flooding. The estuary of River Sibelis (STA 0+00 – STA 0+373) project employed some heavy equipment to undertake the project. The purpose of  find out the needs of heavy equipment, productivity of heavy equipment, the duration of work and heavy equipment operational cost. The required data were of layouts, cross sectional drawings of the river estuary, and specifications of heavy equipment. Microsoft Excel program was applied for the calculation and the schedule using method Barchart.The implementation results are as follow: 1) exavating sediment on 29 work days using 1 unit of crane barge in productivity of 80.8 m3/h at Rp. 1.120.384.700,- ; 2) excavating sediment on 16 work days using 2 units of backhoe, 2 units of barge, and 1 unit of tug boat in productivity of 48 m3/h at Rp.351.309,- ; 3) setting sheet pile on 33 work days using 2 units of crawler crane, 1 unit of diesel hammer, 1 unit of tug boat, and 2 units of barge in productivity of 11 m/h at Rp. 805.385.500,-; at total cost project of  Rp. 2.846.349.000,- on  63 work days. Keywords: heavy equipment, productivity, time, cost
doi_str_mv 10.33795/prokons.v12i1.151
format Article
fullrecord <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_33795_prokons_v12i1_151</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_33795_prokons_v12i1_151</sourcerecordid><originalsourceid>FETCH-crossref_primary_10_33795_prokons_v12i1_1513</originalsourceid><addsrcrecordid>eNqdj8sKgkAYhYcoSKoXaDUvoPl7YXT5W1OZpqEjLYcKA-lizEDQ22fRE7Q5B85l8REyBdtyXRb6s4dqL-1dW09wGrDAhx4xHAaeGQTg94kBIQtMYIE3JBOtm6PtecxnYDsG2WOaJ1jGNOFRJao1ZhRTFDTiRac7XCDd8YQXG-yaLC-2mMblZ7-tsEBaVtkKY1rGEe9ymuQCqeArTMdkcD5cdT35-Yg4Sy7ma_OkWq1VfZYP1dwO6iXBll8K-aOQXwrZUbh_nd63300K</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL</title><source>Directory of Open Access Journals</source><creator>Azhim, Fandi ; ,, Suhariyanto ; ,, Burhamtoro</creator><creatorcontrib>Azhim, Fandi ; ,, Suhariyanto ; ,, Burhamtoro</creatorcontrib><description>The estuary of River Sibelis is vessel traffic modes of fishermen and the risk rob flooding. The estuary of River Sibelis (STA 0+00 – STA 0+373) project employed some heavy equipment to undertake the project. The purpose of  find out the needs of heavy equipment, productivity of heavy equipment, the duration of work and heavy equipment operational cost. The required data were of layouts, cross sectional drawings of the river estuary, and specifications of heavy equipment. Microsoft Excel program was applied for the calculation and the schedule using method Barchart.The implementation results are as follow: 1) exavating sediment on 29 work days using 1 unit of crane barge in productivity of 80.8 m3/h at Rp. 1.120.384.700,- ; 2) excavating sediment on 16 work days using 2 units of backhoe, 2 units of barge, and 1 unit of tug boat in productivity of 48 m3/h at Rp.351.309,- ; 3) setting sheet pile on 33 work days using 2 units of crawler crane, 1 unit of diesel hammer, 1 unit of tug boat, and 2 units of barge in productivity of 11 m/h at Rp. 805.385.500,-; at total cost project of  Rp. 2.846.349.000,- on  63 work days. Keywords: heavy equipment, productivity, time, cost</description><identifier>ISSN: 1978-1784</identifier><identifier>EISSN: 2714-8815</identifier><identifier>DOI: 10.33795/prokons.v12i1.151</identifier><language>eng</language><ispartof>Prokons, 2019-07, Vol.12 (1), p.44</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,864,27923,27924</link.rule.ids></links><search><creatorcontrib>Azhim, Fandi</creatorcontrib><creatorcontrib>,, Suhariyanto</creatorcontrib><creatorcontrib>,, Burhamtoro</creatorcontrib><title>ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL</title><title>Prokons</title><description>The estuary of River Sibelis is vessel traffic modes of fishermen and the risk rob flooding. The estuary of River Sibelis (STA 0+00 – STA 0+373) project employed some heavy equipment to undertake the project. The purpose of  find out the needs of heavy equipment, productivity of heavy equipment, the duration of work and heavy equipment operational cost. The required data were of layouts, cross sectional drawings of the river estuary, and specifications of heavy equipment. Microsoft Excel program was applied for the calculation and the schedule using method Barchart.The implementation results are as follow: 1) exavating sediment on 29 work days using 1 unit of crane barge in productivity of 80.8 m3/h at Rp. 1.120.384.700,- ; 2) excavating sediment on 16 work days using 2 units of backhoe, 2 units of barge, and 1 unit of tug boat in productivity of 48 m3/h at Rp.351.309,- ; 3) setting sheet pile on 33 work days using 2 units of crawler crane, 1 unit of diesel hammer, 1 unit of tug boat, and 2 units of barge in productivity of 11 m/h at Rp. 805.385.500,-; at total cost project of  Rp. 2.846.349.000,- on  63 work days. Keywords: heavy equipment, productivity, time, cost</description><issn>1978-1784</issn><issn>2714-8815</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNqdj8sKgkAYhYcoSKoXaDUvoPl7YXT5W1OZpqEjLYcKA-lizEDQ22fRE7Q5B85l8REyBdtyXRb6s4dqL-1dW09wGrDAhx4xHAaeGQTg94kBIQtMYIE3JBOtm6PtecxnYDsG2WOaJ1jGNOFRJao1ZhRTFDTiRac7XCDd8YQXG-yaLC-2mMblZ7-tsEBaVtkKY1rGEe9ymuQCqeArTMdkcD5cdT35-Yg4Sy7ma_OkWq1VfZYP1dwO6iXBll8K-aOQXwrZUbh_nd63300K</recordid><startdate>20190717</startdate><enddate>20190717</enddate><creator>Azhim, Fandi</creator><creator>,, Suhariyanto</creator><creator>,, Burhamtoro</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20190717</creationdate><title>ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL</title><author>Azhim, Fandi ; ,, Suhariyanto ; ,, Burhamtoro</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-crossref_primary_10_33795_prokons_v12i1_1513</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Azhim, Fandi</creatorcontrib><creatorcontrib>,, Suhariyanto</creatorcontrib><creatorcontrib>,, Burhamtoro</creatorcontrib><collection>CrossRef</collection><jtitle>Prokons</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Azhim, Fandi</au><au>,, Suhariyanto</au><au>,, Burhamtoro</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL</atitle><jtitle>Prokons</jtitle><date>2019-07-17</date><risdate>2019</risdate><volume>12</volume><issue>1</issue><spage>44</spage><pages>44-</pages><issn>1978-1784</issn><eissn>2714-8815</eissn><abstract>The estuary of River Sibelis is vessel traffic modes of fishermen and the risk rob flooding. The estuary of River Sibelis (STA 0+00 – STA 0+373) project employed some heavy equipment to undertake the project. The purpose of  find out the needs of heavy equipment, productivity of heavy equipment, the duration of work and heavy equipment operational cost. The required data were of layouts, cross sectional drawings of the river estuary, and specifications of heavy equipment. Microsoft Excel program was applied for the calculation and the schedule using method Barchart.The implementation results are as follow: 1) exavating sediment on 29 work days using 1 unit of crane barge in productivity of 80.8 m3/h at Rp. 1.120.384.700,- ; 2) excavating sediment on 16 work days using 2 units of backhoe, 2 units of barge, and 1 unit of tug boat in productivity of 48 m3/h at Rp.351.309,- ; 3) setting sheet pile on 33 work days using 2 units of crawler crane, 1 unit of diesel hammer, 1 unit of tug boat, and 2 units of barge in productivity of 11 m/h at Rp. 805.385.500,-; at total cost project of  Rp. 2.846.349.000,- on  63 work days. Keywords: heavy equipment, productivity, time, cost</abstract><doi>10.33795/prokons.v12i1.151</doi></addata></record>
fulltext fulltext
identifier ISSN: 1978-1784
ispartof Prokons, 2019-07, Vol.12 (1), p.44
issn 1978-1784
2714-8815
language eng
recordid cdi_crossref_primary_10_33795_prokons_v12i1_151
source Directory of Open Access Journals
title ALOKASI KEBUTUHAN ALAT BERAT PADA PEKERJAAN NORMALISASI MUARA SUNGAI SIBELIS KOTA TEGAL
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T18%3A54%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=ALOKASI%20KEBUTUHAN%20ALAT%20BERAT%20PADA%20PEKERJAAN%20NORMALISASI%20MUARA%20SUNGAI%20SIBELIS%20KOTA%20TEGAL&rft.jtitle=Prokons&rft.au=Azhim,%20Fandi&rft.date=2019-07-17&rft.volume=12&rft.issue=1&rft.spage=44&rft.pages=44-&rft.issn=1978-1784&rft.eissn=2714-8815&rft_id=info:doi/10.33795/prokons.v12i1.151&rft_dat=%3Ccrossref%3E10_33795_prokons_v12i1_151%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true