Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario

In today’s climate of environmental and economic constraints coupled with a diminishing aggregate supply, in situ hot-mix recycling provides an important alternative to conventional pavement rehabilitation. In situ hot-mix recycling, including hot in-place recycling (HIR) and cold inplace recycling...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation research record 1999, Vol.1684 (1), p.194-202
Hauptverfasser: Kazmierowski, Tom, Marks, Pamela, Lee, Stephen
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 202
container_issue 1
container_start_page 194
container_title Transportation research record
container_volume 1684
creator Kazmierowski, Tom
Marks, Pamela
Lee, Stephen
description In today’s climate of environmental and economic constraints coupled with a diminishing aggregate supply, in situ hot-mix recycling provides an important alternative to conventional pavement rehabilitation. In situ hot-mix recycling, including hot in-place recycling (HIR) and cold inplace recycling (CIR), is proving to be an economical rehabilitation technique that conserves granular materials and energy and results in zero waste. The Ministry of Transportation and the Regional Municipality of Ottawa–Carleton have rehabilitated in excess of 80 projects using in situ hot-mix recycling techniques since 1987. The HIR process is suitable for roadways exhibiting a variety of surficial nonstructural distresses. The HIR process involves heating the existing pavement surface, scarifying, adding rejuvenator, fine aggregates, or beneficiating hot-mix (admixture) as required, mixing, reprofiling, and compacting this hot mixture in a continuous operation. CIR is suitable for roadways with moderate to severe distresses where reflection cracking is a concern. CIR involves milling the existing pavement, screening for oversize, addition of asphalt emulsion, and mixing; then this cold renewed material is spread, reprofiled, and compacted on the roadway in one continuous operation. An overview on the design, construction procedures, test results, and pavement performance to date of in situ recycling is presented. Ten years of performance monitoring of the in situ recycling projects has resulted in the evolution of design strategies and performance specifications. Their effectiveness, limitations, and future utility on highway contracts are discussed.
doi_str_mv 10.3141/1684-23
format Article
fullrecord <record><control><sourceid>sage_cross</sourceid><recordid>TN_cdi_crossref_primary_10_3141_1684_23</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.3141_1684-23</sage_id><sourcerecordid>10.3141_1684-23</sourcerecordid><originalsourceid>FETCH-LOGICAL-c195t-b33b1cdd5db27854008c1d7ddbc0822de773089a406fb27027f9db8264f02fa93</originalsourceid><addsrcrecordid>eNplj0tLAzEYRYMoOFbxL2QhuIp-ecwks5SibaFS0bpwFTJ5lJQ2I5mp2n_vlLpzdRf3cLkHoWsKd5wKek8rJQjjJ6hgtKqJgJKdogJ4RQmtFT1HF123BuBcSF6g8dIn8uFNxi8-hzZvTbIev_qv6L9xG_As4bfY7_C07clz_Bkau7ebmFY4JrxIvcmxvURnwWw6f_WXI_T-9LgcT8l8MZmNH-bE0rrsScN5Q61zpWuYVKUAUJY66VxjQTHmvJQcVG0EVGEggMlQu0axSgRgwdR8hG6Puza3XZd90J85bk3eawr64K4P7prxgbw5kp1Zeb1udzkNx_5hv1zZVT8</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario</title><source>SAGE Complete</source><creator>Kazmierowski, Tom ; Marks, Pamela ; Lee, Stephen</creator><creatorcontrib>Kazmierowski, Tom ; Marks, Pamela ; Lee, Stephen</creatorcontrib><description>In today’s climate of environmental and economic constraints coupled with a diminishing aggregate supply, in situ hot-mix recycling provides an important alternative to conventional pavement rehabilitation. In situ hot-mix recycling, including hot in-place recycling (HIR) and cold inplace recycling (CIR), is proving to be an economical rehabilitation technique that conserves granular materials and energy and results in zero waste. The Ministry of Transportation and the Regional Municipality of Ottawa–Carleton have rehabilitated in excess of 80 projects using in situ hot-mix recycling techniques since 1987. The HIR process is suitable for roadways exhibiting a variety of surficial nonstructural distresses. The HIR process involves heating the existing pavement surface, scarifying, adding rejuvenator, fine aggregates, or beneficiating hot-mix (admixture) as required, mixing, reprofiling, and compacting this hot mixture in a continuous operation. CIR is suitable for roadways with moderate to severe distresses where reflection cracking is a concern. CIR involves milling the existing pavement, screening for oversize, addition of asphalt emulsion, and mixing; then this cold renewed material is spread, reprofiled, and compacted on the roadway in one continuous operation. An overview on the design, construction procedures, test results, and pavement performance to date of in situ recycling is presented. Ten years of performance monitoring of the in situ recycling projects has resulted in the evolution of design strategies and performance specifications. Their effectiveness, limitations, and future utility on highway contracts are discussed.</description><identifier>ISSN: 0361-1981</identifier><identifier>EISSN: 2169-4052</identifier><identifier>DOI: 10.3141/1684-23</identifier><language>eng</language><publisher>Los Angeles, CA: SAGE Publications</publisher><ispartof>Transportation research record, 1999, Vol.1684 (1), p.194-202</ispartof><rights>1999 National Academy of Sciences</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c195t-b33b1cdd5db27854008c1d7ddbc0822de773089a406fb27027f9db8264f02fa93</citedby><cites>FETCH-LOGICAL-c195t-b33b1cdd5db27854008c1d7ddbc0822de773089a406fb27027f9db8264f02fa93</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.3141/1684-23$$EPDF$$P50$$Gsage$$H</linktopdf><linktohtml>$$Uhttps://journals.sagepub.com/doi/10.3141/1684-23$$EHTML$$P50$$Gsage$$H</linktohtml><link.rule.ids>314,776,780,4009,21799,27902,27903,27904,43600,43601</link.rule.ids></links><search><creatorcontrib>Kazmierowski, Tom</creatorcontrib><creatorcontrib>Marks, Pamela</creatorcontrib><creatorcontrib>Lee, Stephen</creatorcontrib><title>Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario</title><title>Transportation research record</title><description>In today’s climate of environmental and economic constraints coupled with a diminishing aggregate supply, in situ hot-mix recycling provides an important alternative to conventional pavement rehabilitation. In situ hot-mix recycling, including hot in-place recycling (HIR) and cold inplace recycling (CIR), is proving to be an economical rehabilitation technique that conserves granular materials and energy and results in zero waste. The Ministry of Transportation and the Regional Municipality of Ottawa–Carleton have rehabilitated in excess of 80 projects using in situ hot-mix recycling techniques since 1987. The HIR process is suitable for roadways exhibiting a variety of surficial nonstructural distresses. The HIR process involves heating the existing pavement surface, scarifying, adding rejuvenator, fine aggregates, or beneficiating hot-mix (admixture) as required, mixing, reprofiling, and compacting this hot mixture in a continuous operation. CIR is suitable for roadways with moderate to severe distresses where reflection cracking is a concern. CIR involves milling the existing pavement, screening for oversize, addition of asphalt emulsion, and mixing; then this cold renewed material is spread, reprofiled, and compacted on the roadway in one continuous operation. An overview on the design, construction procedures, test results, and pavement performance to date of in situ recycling is presented. Ten years of performance monitoring of the in situ recycling projects has resulted in the evolution of design strategies and performance specifications. Their effectiveness, limitations, and future utility on highway contracts are discussed.</description><issn>0361-1981</issn><issn>2169-4052</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1999</creationdate><recordtype>article</recordtype><recordid>eNplj0tLAzEYRYMoOFbxL2QhuIp-ecwks5SibaFS0bpwFTJ5lJQ2I5mp2n_vlLpzdRf3cLkHoWsKd5wKek8rJQjjJ6hgtKqJgJKdogJ4RQmtFT1HF123BuBcSF6g8dIn8uFNxi8-hzZvTbIev_qv6L9xG_As4bfY7_C07clz_Bkau7ebmFY4JrxIvcmxvURnwWw6f_WXI_T-9LgcT8l8MZmNH-bE0rrsScN5Q61zpWuYVKUAUJY66VxjQTHmvJQcVG0EVGEggMlQu0axSgRgwdR8hG6Puza3XZd90J85bk3eawr64K4P7prxgbw5kp1Zeb1udzkNx_5hv1zZVT8</recordid><startdate>1999</startdate><enddate>1999</enddate><creator>Kazmierowski, Tom</creator><creator>Marks, Pamela</creator><creator>Lee, Stephen</creator><general>SAGE Publications</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>1999</creationdate><title>Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario</title><author>Kazmierowski, Tom ; Marks, Pamela ; Lee, Stephen</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c195t-b33b1cdd5db27854008c1d7ddbc0822de773089a406fb27027f9db8264f02fa93</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1999</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kazmierowski, Tom</creatorcontrib><creatorcontrib>Marks, Pamela</creatorcontrib><creatorcontrib>Lee, Stephen</creatorcontrib><collection>CrossRef</collection><jtitle>Transportation research record</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kazmierowski, Tom</au><au>Marks, Pamela</au><au>Lee, Stephen</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario</atitle><jtitle>Transportation research record</jtitle><date>1999</date><risdate>1999</risdate><volume>1684</volume><issue>1</issue><spage>194</spage><epage>202</epage><pages>194-202</pages><issn>0361-1981</issn><eissn>2169-4052</eissn><abstract>In today’s climate of environmental and economic constraints coupled with a diminishing aggregate supply, in situ hot-mix recycling provides an important alternative to conventional pavement rehabilitation. In situ hot-mix recycling, including hot in-place recycling (HIR) and cold inplace recycling (CIR), is proving to be an economical rehabilitation technique that conserves granular materials and energy and results in zero waste. The Ministry of Transportation and the Regional Municipality of Ottawa–Carleton have rehabilitated in excess of 80 projects using in situ hot-mix recycling techniques since 1987. The HIR process is suitable for roadways exhibiting a variety of surficial nonstructural distresses. The HIR process involves heating the existing pavement surface, scarifying, adding rejuvenator, fine aggregates, or beneficiating hot-mix (admixture) as required, mixing, reprofiling, and compacting this hot mixture in a continuous operation. CIR is suitable for roadways with moderate to severe distresses where reflection cracking is a concern. CIR involves milling the existing pavement, screening for oversize, addition of asphalt emulsion, and mixing; then this cold renewed material is spread, reprofiled, and compacted on the roadway in one continuous operation. An overview on the design, construction procedures, test results, and pavement performance to date of in situ recycling is presented. Ten years of performance monitoring of the in situ recycling projects has resulted in the evolution of design strategies and performance specifications. Their effectiveness, limitations, and future utility on highway contracts are discussed.</abstract><cop>Los Angeles, CA</cop><pub>SAGE Publications</pub><doi>10.3141/1684-23</doi><tpages>9</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0361-1981
ispartof Transportation research record, 1999, Vol.1684 (1), p.194-202
issn 0361-1981
2169-4052
language eng
recordid cdi_crossref_primary_10_3141_1684_23
source SAGE Complete
title Ten-Year Performance Review of In Situ Hot-Mix Recycling in Ontario
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T23%3A32%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sage_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Ten-Year%20Performance%20Review%20of%20In%20Situ%20Hot-Mix%20Recycling%20in%20Ontario&rft.jtitle=Transportation%20research%20record&rft.au=Kazmierowski,%20Tom&rft.date=1999&rft.volume=1684&rft.issue=1&rft.spage=194&rft.epage=202&rft.pages=194-202&rft.issn=0361-1981&rft.eissn=2169-4052&rft_id=info:doi/10.3141/1684-23&rft_dat=%3Csage_cross%3E10.3141_1684-23%3C/sage_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_sage_id=10.3141_1684-23&rfr_iscdi=true