Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006

Unauthorized dilution of boric acid in the reactor coolant due to improper operation of the chemical and volume control system (KBA) is a project mode with the violation of normal operation. The operator is obliged to identify unauthorized dilution within half an hour and stop feeding with pure cond...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Kerntechnik (1987) 2018-10, Vol.83 (5), p.407-413
Hauptverfasser: Shumskiy, B. E., Gordienko, P. V., Kotsarev, A. V., Lizorkin, M. P.
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 413
container_issue 5
container_start_page 407
container_title Kerntechnik (1987)
container_volume 83
creator Shumskiy, B. E.
Gordienko, P. V.
Kotsarev, A. V.
Lizorkin, M. P.
description Unauthorized dilution of boric acid in the reactor coolant due to improper operation of the chemical and volume control system (KBA) is a project mode with the violation of normal operation. The operator is obliged to identify unauthorized dilution within half an hour and stop feeding with pure condensate. The power unit has automation, which stops feeding on EP (emergency protection) and ATWS (Anticipated transient without scram) signals. The situation without the intervention of the operator and the failure of automation to stop dilution can be considered as a beyond design basis accident. The article presents an analysis of unauthorized boric acid dilution process in the primary circuit coolant of the NPP-2006 power unit up to the controlled state, either considering the operator's intervention after a 30-minute period of process, i. e. with a forced cessation of dilution, or without the operator's intervention until the tanks with pure condensate are completely emptied.
doi_str_mv 10.3139/124.110933
format Article
fullrecord <record><control><sourceid>walterdegruyter_cross</sourceid><recordid>TN_cdi_crossref_primary_10_3139_124_110933</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_3139_124_110933835407</sourcerecordid><originalsourceid>FETCH-LOGICAL-c333t-dcb04cf8aff32289bc331f0402ac69b9108cd1ab7658cb6eb10d3aacd5e0537a3</originalsourceid><addsrcrecordid>eNptkMlOwzAQhi0EEhX0whPkjJTiJYtzrCo2qYIe4BxNvFBXblJ5ESrPw4PiNoUTvtjz-_tnRj9CNwTPGGHNHaHFjBDcMHaGJpQ0Zc5Ljs_RJEk0Zw2ml2jq_QanU9G6LPAEfc97sHtvfDboLKxVZrY7EOFQSaO1cqoPmReqB2eGBPVHyJtttBBMKp3y0YajPfYQw3pw5kvJ5LbxCKSPLmkiA2FkZsYGYhgs9OF36M6ZLbh9JowT0fzJL6tVTtOu1-hCg_Vqerqv0PvD_dviKV--Pj4v5stcMMZCLkWHC6E5aM0o5U2XZKJxgSmIqukagrmQBLq6KrnoKtURLBmAkKXCJauBXaHbsa9wg_dO6fa0WEtwe4i4TRG3Y8QJ5iP8CTYoJ9WHi_v0aDdDdClU_4-JsxR6zX4A6KqCxQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006</title><source>De Gruyter journals</source><creator>Shumskiy, B. E. ; Gordienko, P. V. ; Kotsarev, A. V. ; Lizorkin, M. P.</creator><creatorcontrib>Shumskiy, B. E. ; Gordienko, P. V. ; Kotsarev, A. V. ; Lizorkin, M. P.</creatorcontrib><description>Unauthorized dilution of boric acid in the reactor coolant due to improper operation of the chemical and volume control system (KBA) is a project mode with the violation of normal operation. The operator is obliged to identify unauthorized dilution within half an hour and stop feeding with pure condensate. The power unit has automation, which stops feeding on EP (emergency protection) and ATWS (Anticipated transient without scram) signals. The situation without the intervention of the operator and the failure of automation to stop dilution can be considered as a beyond design basis accident. The article presents an analysis of unauthorized boric acid dilution process in the primary circuit coolant of the NPP-2006 power unit up to the controlled state, either considering the operator's intervention after a 30-minute period of process, i. e. with a forced cessation of dilution, or without the operator's intervention until the tanks with pure condensate are completely emptied.</description><identifier>ISSN: 0932-3902</identifier><identifier>EISSN: 2195-8580</identifier><identifier>DOI: 10.3139/124.110933</identifier><language>eng</language><publisher>De Gruyter</publisher><ispartof>Kerntechnik (1987), 2018-10, Vol.83 (5), p.407-413</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c333t-dcb04cf8aff32289bc331f0402ac69b9108cd1ab7658cb6eb10d3aacd5e0537a3</citedby><cites>FETCH-LOGICAL-c333t-dcb04cf8aff32289bc331f0402ac69b9108cd1ab7658cb6eb10d3aacd5e0537a3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.degruyter.com/document/doi/10.3139/124.110933/pdf$$EPDF$$P50$$Gwalterdegruyter$$H</linktopdf><linktohtml>$$Uhttps://www.degruyter.com/document/doi/10.3139/124.110933/html$$EHTML$$P50$$Gwalterdegruyter$$H</linktohtml><link.rule.ids>314,777,781,27905,27906,66503,68287</link.rule.ids></links><search><creatorcontrib>Shumskiy, B. E.</creatorcontrib><creatorcontrib>Gordienko, P. V.</creatorcontrib><creatorcontrib>Kotsarev, A. V.</creatorcontrib><creatorcontrib>Lizorkin, M. P.</creatorcontrib><title>Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006</title><title>Kerntechnik (1987)</title><description>Unauthorized dilution of boric acid in the reactor coolant due to improper operation of the chemical and volume control system (KBA) is a project mode with the violation of normal operation. The operator is obliged to identify unauthorized dilution within half an hour and stop feeding with pure condensate. The power unit has automation, which stops feeding on EP (emergency protection) and ATWS (Anticipated transient without scram) signals. The situation without the intervention of the operator and the failure of automation to stop dilution can be considered as a beyond design basis accident. The article presents an analysis of unauthorized boric acid dilution process in the primary circuit coolant of the NPP-2006 power unit up to the controlled state, either considering the operator's intervention after a 30-minute period of process, i. e. with a forced cessation of dilution, or without the operator's intervention until the tanks with pure condensate are completely emptied.</description><issn>0932-3902</issn><issn>2195-8580</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><recordid>eNptkMlOwzAQhi0EEhX0whPkjJTiJYtzrCo2qYIe4BxNvFBXblJ5ESrPw4PiNoUTvtjz-_tnRj9CNwTPGGHNHaHFjBDcMHaGJpQ0Zc5Ljs_RJEk0Zw2ml2jq_QanU9G6LPAEfc97sHtvfDboLKxVZrY7EOFQSaO1cqoPmReqB2eGBPVHyJtttBBMKp3y0YajPfYQw3pw5kvJ5LbxCKSPLmkiA2FkZsYGYhgs9OF36M6ZLbh9JowT0fzJL6tVTtOu1-hCg_Vqerqv0PvD_dviKV--Pj4v5stcMMZCLkWHC6E5aM0o5U2XZKJxgSmIqukagrmQBLq6KrnoKtURLBmAkKXCJauBXaHbsa9wg_dO6fa0WEtwe4i4TRG3Y8QJ5iP8CTYoJ9WHi_v0aDdDdClU_4-JsxR6zX4A6KqCxQ</recordid><startdate>20181015</startdate><enddate>20181015</enddate><creator>Shumskiy, B. E.</creator><creator>Gordienko, P. V.</creator><creator>Kotsarev, A. V.</creator><creator>Lizorkin, M. P.</creator><general>De Gruyter</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20181015</creationdate><title>Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006</title><author>Shumskiy, B. E. ; Gordienko, P. V. ; Kotsarev, A. V. ; Lizorkin, M. P.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c333t-dcb04cf8aff32289bc331f0402ac69b9108cd1ab7658cb6eb10d3aacd5e0537a3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Shumskiy, B. E.</creatorcontrib><creatorcontrib>Gordienko, P. V.</creatorcontrib><creatorcontrib>Kotsarev, A. V.</creatorcontrib><creatorcontrib>Lizorkin, M. P.</creatorcontrib><collection>CrossRef</collection><jtitle>Kerntechnik (1987)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Shumskiy, B. E.</au><au>Gordienko, P. V.</au><au>Kotsarev, A. V.</au><au>Lizorkin, M. P.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006</atitle><jtitle>Kerntechnik (1987)</jtitle><date>2018-10-15</date><risdate>2018</risdate><volume>83</volume><issue>5</issue><spage>407</spage><epage>413</epage><pages>407-413</pages><issn>0932-3902</issn><eissn>2195-8580</eissn><abstract>Unauthorized dilution of boric acid in the reactor coolant due to improper operation of the chemical and volume control system (KBA) is a project mode with the violation of normal operation. The operator is obliged to identify unauthorized dilution within half an hour and stop feeding with pure condensate. The power unit has automation, which stops feeding on EP (emergency protection) and ATWS (Anticipated transient without scram) signals. The situation without the intervention of the operator and the failure of automation to stop dilution can be considered as a beyond design basis accident. The article presents an analysis of unauthorized boric acid dilution process in the primary circuit coolant of the NPP-2006 power unit up to the controlled state, either considering the operator's intervention after a 30-minute period of process, i. e. with a forced cessation of dilution, or without the operator's intervention until the tanks with pure condensate are completely emptied.</abstract><pub>De Gruyter</pub><doi>10.3139/124.110933</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0932-3902
ispartof Kerntechnik (1987), 2018-10, Vol.83 (5), p.407-413
issn 0932-3902
2195-8580
language eng
recordid cdi_crossref_primary_10_3139_124_110933
source De Gruyter journals
title Analysis of the impact of different scenarios on the simulation results of unauthorized dilution of boric acid in the coolant of the primary circuit of the NPP-2006
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-18T11%3A56%3A14IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-walterdegruyter_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Analysis%20of%20the%20impact%20of%20different%20scenarios%20on%20the%20simulation%20results%20of%20unauthorized%20dilution%20of%20boric%20acid%20in%20the%20coolant%20of%20the%20primary%20circuit%20of%20the%20NPP-2006&rft.jtitle=Kerntechnik%20(1987)&rft.au=Shumskiy,%20B.%20E.&rft.date=2018-10-15&rft.volume=83&rft.issue=5&rft.spage=407&rft.epage=413&rft.pages=407-413&rft.issn=0932-3902&rft.eissn=2195-8580&rft_id=info:doi/10.3139/124.110933&rft_dat=%3Cwalterdegruyter_cross%3E10_3139_124_110933835407%3C/walterdegruyter_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true