A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks
Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballas...
Gespeichert in:
Veröffentlicht in: | Civil Engineering Journal 2020-10, Vol.6 (10), p.2045-2057 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 2057 |
---|---|
container_issue | 10 |
container_start_page | 2045 |
container_title | Civil Engineering Journal |
container_volume | 6 |
creator | Daddow, Mohammad Zhang, Xiedong Qiu, Hongsheng Zhang, Zhihua Liu, Yingqi |
description | Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballasted tracks to improve the track geometry and reduce the total maintenance cost. A mathematical model for this problem in the literature is improved here by including the restriction on the resources (tools, workers and budget) in the model and including constant/variable values for track possession cost and available resources. The optimal solutions obtained for all instances are found by using the global optimization. Besides, a numerical study is presented to test and evaluate the model performance. The results show that the proposed model can be adopted by the infrastructure manager (IM) to make suitable tamping scheduling decisions under normal or private conditions; however, the private conditions lead to an increase of the final cost compared to that of the normal ones. Doi: 10.28991/cej-2020-03091601 Full Text: PDF |
doi_str_mv | 10.28991/cej-2020-03091601 |
format | Article |
fullrecord | <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_28991_cej_2020_03091601</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_28991_cej_2020_03091601</sourcerecordid><originalsourceid>FETCH-LOGICAL-c313t-13a7e7ad79d57356d16bc3b1ccb0617dd4b2a17f5952a7e2ff9bb808a2fe53823</originalsourceid><addsrcrecordid>eNo1kMtKAzEYhYMoWGpfwFVeYDSXSTJZ1nqnRZBxPfy5aexMpyQD0rc39bI658DHWXwIXVJyxRqt6bX1nxUjjFSEE00loSdoxmolK06EOC1dli61UOdokXM0pK4VL2g9Q89LvIHpww8wRQs93ozO9ziMCd9A30OecAvDPu7e8a23McdxV_jtcccdfoXYf8EBtwnsNl-gswB99ou_nKO3-7t29VitXx6eVst1ZTnlU0U5KK_AKe2E4kI6Ko3lhlpriKTKudowoCoILVghWQjamIY0wIIXvGF8jtjvr01jzsmHbp_iAOnQUdL9COmKkO4opPsXwr8BcgpT1w</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks</title><source>EZB Electronic Journals Library</source><creator>Daddow, Mohammad ; Zhang, Xiedong ; Qiu, Hongsheng ; Zhang, Zhihua ; Liu, Yingqi</creator><creatorcontrib>Daddow, Mohammad ; Zhang, Xiedong ; Qiu, Hongsheng ; Zhang, Zhihua ; Liu, Yingqi</creatorcontrib><description>Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballasted tracks to improve the track geometry and reduce the total maintenance cost. A mathematical model for this problem in the literature is improved here by including the restriction on the resources (tools, workers and budget) in the model and including constant/variable values for track possession cost and available resources. The optimal solutions obtained for all instances are found by using the global optimization. Besides, a numerical study is presented to test and evaluate the model performance. The results show that the proposed model can be adopted by the infrastructure manager (IM) to make suitable tamping scheduling decisions under normal or private conditions; however, the private conditions lead to an increase of the final cost compared to that of the normal ones. Doi: 10.28991/cej-2020-03091601 Full Text: PDF</description><identifier>ISSN: 2676-6957</identifier><identifier>EISSN: 2476-3055</identifier><identifier>DOI: 10.28991/cej-2020-03091601</identifier><language>eng</language><ispartof>Civil Engineering Journal, 2020-10, Vol.6 (10), p.2045-2057</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c313t-13a7e7ad79d57356d16bc3b1ccb0617dd4b2a17f5952a7e2ff9bb808a2fe53823</citedby><orcidid>0000-0001-8103-7590</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Daddow, Mohammad</creatorcontrib><creatorcontrib>Zhang, Xiedong</creatorcontrib><creatorcontrib>Qiu, Hongsheng</creatorcontrib><creatorcontrib>Zhang, Zhihua</creatorcontrib><creatorcontrib>Liu, Yingqi</creatorcontrib><title>A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks</title><title>Civil Engineering Journal</title><description>Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballasted tracks to improve the track geometry and reduce the total maintenance cost. A mathematical model for this problem in the literature is improved here by including the restriction on the resources (tools, workers and budget) in the model and including constant/variable values for track possession cost and available resources. The optimal solutions obtained for all instances are found by using the global optimization. Besides, a numerical study is presented to test and evaluate the model performance. The results show that the proposed model can be adopted by the infrastructure manager (IM) to make suitable tamping scheduling decisions under normal or private conditions; however, the private conditions lead to an increase of the final cost compared to that of the normal ones. Doi: 10.28991/cej-2020-03091601 Full Text: PDF</description><issn>2676-6957</issn><issn>2476-3055</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNo1kMtKAzEYhYMoWGpfwFVeYDSXSTJZ1nqnRZBxPfy5aexMpyQD0rc39bI658DHWXwIXVJyxRqt6bX1nxUjjFSEE00loSdoxmolK06EOC1dli61UOdokXM0pK4VL2g9Q89LvIHpww8wRQs93ozO9ziMCd9A30OecAvDPu7e8a23McdxV_jtcccdfoXYf8EBtwnsNl-gswB99ou_nKO3-7t29VitXx6eVst1ZTnlU0U5KK_AKe2E4kI6Ko3lhlpriKTKudowoCoILVghWQjamIY0wIIXvGF8jtjvr01jzsmHbp_iAOnQUdL9COmKkO4opPsXwr8BcgpT1w</recordid><startdate>20201001</startdate><enddate>20201001</enddate><creator>Daddow, Mohammad</creator><creator>Zhang, Xiedong</creator><creator>Qiu, Hongsheng</creator><creator>Zhang, Zhihua</creator><creator>Liu, Yingqi</creator><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0001-8103-7590</orcidid></search><sort><creationdate>20201001</creationdate><title>A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks</title><author>Daddow, Mohammad ; Zhang, Xiedong ; Qiu, Hongsheng ; Zhang, Zhihua ; Liu, Yingqi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c313t-13a7e7ad79d57356d16bc3b1ccb0617dd4b2a17f5952a7e2ff9bb808a2fe53823</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Daddow, Mohammad</creatorcontrib><creatorcontrib>Zhang, Xiedong</creatorcontrib><creatorcontrib>Qiu, Hongsheng</creatorcontrib><creatorcontrib>Zhang, Zhihua</creatorcontrib><creatorcontrib>Liu, Yingqi</creatorcontrib><collection>CrossRef</collection><jtitle>Civil Engineering Journal</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Daddow, Mohammad</au><au>Zhang, Xiedong</au><au>Qiu, Hongsheng</au><au>Zhang, Zhihua</au><au>Liu, Yingqi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks</atitle><jtitle>Civil Engineering Journal</jtitle><date>2020-10-01</date><risdate>2020</risdate><volume>6</volume><issue>10</issue><spage>2045</spage><epage>2057</epage><pages>2045-2057</pages><issn>2676-6957</issn><eissn>2476-3055</eissn><abstract>Ballast tamping is considered as an important maintenance process for railway infrastructures and has a large influence on the capacity of any railway networks. But optimizing the plan of that process is a complex problem with a high cost. This paper discusses optimizing tamping operations on ballasted tracks to improve the track geometry and reduce the total maintenance cost. A mathematical model for this problem in the literature is improved here by including the restriction on the resources (tools, workers and budget) in the model and including constant/variable values for track possession cost and available resources. The optimal solutions obtained for all instances are found by using the global optimization. Besides, a numerical study is presented to test and evaluate the model performance. The results show that the proposed model can be adopted by the infrastructure manager (IM) to make suitable tamping scheduling decisions under normal or private conditions; however, the private conditions lead to an increase of the final cost compared to that of the normal ones. Doi: 10.28991/cej-2020-03091601 Full Text: PDF</abstract><doi>10.28991/cej-2020-03091601</doi><tpages>13</tpages><orcidid>https://orcid.org/0000-0001-8103-7590</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2676-6957 |
ispartof | Civil Engineering Journal, 2020-10, Vol.6 (10), p.2045-2057 |
issn | 2676-6957 2476-3055 |
language | eng |
recordid | cdi_crossref_primary_10_28991_cej_2020_03091601 |
source | EZB Electronic Journals Library |
title | A Mathematical Model for Ballast Tamping Decision Making in Railway Tracks |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T17%3A41%3A49IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20Mathematical%20Model%20for%20Ballast%20Tamping%20Decision%20Making%20in%20Railway%20Tracks&rft.jtitle=Civil%20Engineering%20Journal&rft.au=Daddow,%20Mohammad&rft.date=2020-10-01&rft.volume=6&rft.issue=10&rft.spage=2045&rft.epage=2057&rft.pages=2045-2057&rft.issn=2676-6957&rft.eissn=2476-3055&rft_id=info:doi/10.28991/cej-2020-03091601&rft_dat=%3Ccrossref%3E10_28991_cej_2020_03091601%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |