Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects
Cost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as t...
Gespeichert in:
Veröffentlicht in: | Civil Engineering Journal 2020-02, Vol.6 (2), p.384-401 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 401 |
---|---|
container_issue | 2 |
container_start_page | 384 |
container_title | Civil Engineering Journal |
container_volume | 6 |
creator | Khalaf, Tarq Zaed Çağlar, Hakan Çağlar, Arzu Hanoon, Ammar Nasiri |
description | Cost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as the tools of soft computing techniques, offer significant potential in this field. This study presents the proposal of an approach to the estimation of construction costs and duration of construction projects, which is based on PSO approach. The general applicability of PSO in the formulated problem with cost and duration estimation is examined. A series of 60 projects collected from constructed government projects were utilized to build the proposed models. Eight input parameters, such as volume of bricks, the volume of concrete, footing type, elevators number, total floors area, area of the ground floor, floors number, and security status are used in building the proposed model. The results displayed that the PSO models can be an alternative approach to evaluate the cost and-or duration of construction projects. The developed model provides high prediction accuracy, with a low mean (0.97 and 0.99) and CoV (10.87% and 4.94%) values. A comparison of the models’ results indicated that predicting with PSO was importantly more precise. |
doi_str_mv | 10.28991/cej-2020-03091478 |
format | Article |
fullrecord | <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_28991_cej_2020_03091478</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_28991_cej_2020_03091478</sourcerecordid><originalsourceid>FETCH-LOGICAL-c247t-40cfd86edbf1443004624c25c6a8f0f0009c6f7540609710278b0e8ef010ff133</originalsourceid><addsrcrecordid>eNpNkN1KAzEQhYMoWGpfwKu8QHTys8nuZV2rFQotqNdLNpvQLe1mSVJEn97YKng1Z84ZhsOH0C2FO1ZWFb03dkcYMCDAoaJClRdowoSShENRXGYts5ZVoa7RLMa-BSEUz6digrYbHVJv9ha_fuhwwOsx9Yf-S6feD_hBR9vh-TgGr80WOx_wIub8nHqHax9TxHro8OMx_HOHmMLRnPZN8DtrUrxBV07vo539zil6f1q81UuyWj-_1PMVMblxIgKM60ppu9ZRITiAkEwYVhipSwcOACojnSoESKgUBabKFmxpHVBwjnI-Rez81wQfY7CuGUNuHD4bCs0JV5NxNT-4mj9c_BtaGF8G</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Khalaf, Tarq Zaed ; Çağlar, Hakan ; Çağlar, Arzu ; Hanoon, Ammar Nasiri</creator><creatorcontrib>Khalaf, Tarq Zaed ; Çağlar, Hakan ; Çağlar, Arzu ; Hanoon, Ammar Nasiri</creatorcontrib><description>Cost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as the tools of soft computing techniques, offer significant potential in this field. This study presents the proposal of an approach to the estimation of construction costs and duration of construction projects, which is based on PSO approach. The general applicability of PSO in the formulated problem with cost and duration estimation is examined. A series of 60 projects collected from constructed government projects were utilized to build the proposed models. Eight input parameters, such as volume of bricks, the volume of concrete, footing type, elevators number, total floors area, area of the ground floor, floors number, and security status are used in building the proposed model. The results displayed that the PSO models can be an alternative approach to evaluate the cost and-or duration of construction projects. The developed model provides high prediction accuracy, with a low mean (0.97 and 0.99) and CoV (10.87% and 4.94%) values. A comparison of the models’ results indicated that predicting with PSO was importantly more precise.</description><identifier>ISSN: 2676-6957</identifier><identifier>EISSN: 2476-3055</identifier><identifier>DOI: 10.28991/cej-2020-03091478</identifier><language>eng</language><ispartof>Civil Engineering Journal, 2020-02, Vol.6 (2), p.384-401</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c247t-40cfd86edbf1443004624c25c6a8f0f0009c6f7540609710278b0e8ef010ff133</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Khalaf, Tarq Zaed</creatorcontrib><creatorcontrib>Çağlar, Hakan</creatorcontrib><creatorcontrib>Çağlar, Arzu</creatorcontrib><creatorcontrib>Hanoon, Ammar Nasiri</creatorcontrib><title>Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects</title><title>Civil Engineering Journal</title><description>Cost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as the tools of soft computing techniques, offer significant potential in this field. This study presents the proposal of an approach to the estimation of construction costs and duration of construction projects, which is based on PSO approach. The general applicability of PSO in the formulated problem with cost and duration estimation is examined. A series of 60 projects collected from constructed government projects were utilized to build the proposed models. Eight input parameters, such as volume of bricks, the volume of concrete, footing type, elevators number, total floors area, area of the ground floor, floors number, and security status are used in building the proposed model. The results displayed that the PSO models can be an alternative approach to evaluate the cost and-or duration of construction projects. The developed model provides high prediction accuracy, with a low mean (0.97 and 0.99) and CoV (10.87% and 4.94%) values. A comparison of the models’ results indicated that predicting with PSO was importantly more precise.</description><issn>2676-6957</issn><issn>2476-3055</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2020</creationdate><recordtype>article</recordtype><recordid>eNpNkN1KAzEQhYMoWGpfwKu8QHTys8nuZV2rFQotqNdLNpvQLe1mSVJEn97YKng1Z84ZhsOH0C2FO1ZWFb03dkcYMCDAoaJClRdowoSShENRXGYts5ZVoa7RLMa-BSEUz6digrYbHVJv9ha_fuhwwOsx9Yf-S6feD_hBR9vh-TgGr80WOx_wIub8nHqHax9TxHro8OMx_HOHmMLRnPZN8DtrUrxBV07vo539zil6f1q81UuyWj-_1PMVMblxIgKM60ppu9ZRITiAkEwYVhipSwcOACojnSoESKgUBabKFmxpHVBwjnI-Rez81wQfY7CuGUNuHD4bCs0JV5NxNT-4mj9c_BtaGF8G</recordid><startdate>20200201</startdate><enddate>20200201</enddate><creator>Khalaf, Tarq Zaed</creator><creator>Çağlar, Hakan</creator><creator>Çağlar, Arzu</creator><creator>Hanoon, Ammar Nasiri</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20200201</creationdate><title>Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects</title><author>Khalaf, Tarq Zaed ; Çağlar, Hakan ; Çağlar, Arzu ; Hanoon, Ammar Nasiri</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c247t-40cfd86edbf1443004624c25c6a8f0f0009c6f7540609710278b0e8ef010ff133</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2020</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Khalaf, Tarq Zaed</creatorcontrib><creatorcontrib>Çağlar, Hakan</creatorcontrib><creatorcontrib>Çağlar, Arzu</creatorcontrib><creatorcontrib>Hanoon, Ammar Nasiri</creatorcontrib><collection>CrossRef</collection><jtitle>Civil Engineering Journal</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Khalaf, Tarq Zaed</au><au>Çağlar, Hakan</au><au>Çağlar, Arzu</au><au>Hanoon, Ammar Nasiri</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects</atitle><jtitle>Civil Engineering Journal</jtitle><date>2020-02-01</date><risdate>2020</risdate><volume>6</volume><issue>2</issue><spage>384</spage><epage>401</epage><pages>384-401</pages><issn>2676-6957</issn><eissn>2476-3055</eissn><abstract>Cost and duration estimation is essential for the success of construction projects. The importance of decision making in cost and duration estimation for building design processes points to a need for an estimation tool for both designers and project managers. Particle swarm optimization (PSO), as the tools of soft computing techniques, offer significant potential in this field. This study presents the proposal of an approach to the estimation of construction costs and duration of construction projects, which is based on PSO approach. The general applicability of PSO in the formulated problem with cost and duration estimation is examined. A series of 60 projects collected from constructed government projects were utilized to build the proposed models. Eight input parameters, such as volume of bricks, the volume of concrete, footing type, elevators number, total floors area, area of the ground floor, floors number, and security status are used in building the proposed model. The results displayed that the PSO models can be an alternative approach to evaluate the cost and-or duration of construction projects. The developed model provides high prediction accuracy, with a low mean (0.97 and 0.99) and CoV (10.87% and 4.94%) values. A comparison of the models’ results indicated that predicting with PSO was importantly more precise.</abstract><doi>10.28991/cej-2020-03091478</doi><tpages>18</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2676-6957 |
ispartof | Civil Engineering Journal, 2020-02, Vol.6 (2), p.384-401 |
issn | 2676-6957 2476-3055 |
language | eng |
recordid | cdi_crossref_primary_10_28991_cej_2020_03091478 |
source | Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals |
title | Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T01%3A21%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Particle%20Swarm%20Optimization%20Based%20Approach%20for%20Estimation%20of%20Costs%20and%20Duration%20of%20Construction%20Projects&rft.jtitle=Civil%20Engineering%20Journal&rft.au=Khalaf,%20Tarq%20Zaed&rft.date=2020-02-01&rft.volume=6&rft.issue=2&rft.spage=384&rft.epage=401&rft.pages=384-401&rft.issn=2676-6957&rft.eissn=2476-3055&rft_id=info:doi/10.28991/cej-2020-03091478&rft_dat=%3Ccrossref%3E10_28991_cej_2020_03091478%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |