Investigating the Influence of Penetration Length of Cut-off Wall on its Dynamic Interaction with Core and Foundation of Earth Dam
Seepage and flow of water in the soil is one of the most important issue and effective elements in designing embankment dams. One of the methods to control seepage in alluvial foundation of earth dams is to use a plastic concrete cutoff-wall. For better seepage control, the cutoff-wall extends insid...
Gespeichert in:
Veröffentlicht in: | Civil Engineering Journal 2018-12, Vol.4 (12), p.3019 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!