Risk Level of Design and Procurement Factors Causing Construction Waste Generation

Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related fact...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of Applied Engineering Sciences 2022-05, Vol.12 (1), p.11-16
Hauptverfasser: Bachayo, A., Memon, A. H., Hussain, M., Rahman, I. A., Ahmed, S. J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 16
container_issue 1
container_start_page 11
container_title Journal of Applied Engineering Sciences
container_volume 12
creator Bachayo, A.
Memon, A. H.
Hussain, M.
Rahman, I. A.
Ahmed, S. J.
description Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.
doi_str_mv 10.2478/jaes-2022-0002
format Article
fullrecord <record><control><sourceid>walterdegruyter_cross</sourceid><recordid>TN_cdi_crossref_primary_10_2478_jaes_2022_0002</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_2478_jaes_2022_000212111</sourcerecordid><originalsourceid>FETCH-LOGICAL-c1311-59ace456d7c16f9db7fdcb440bde628902b327e1f53d55f34e2c9215bbfaa3ee3</originalsourceid><addsrcrecordid>eNp1kE1LAzEQhoMoWGqvnvMHtuZjs2nwJKutQkEpiseQTSZla5tIsqv037tLPXjxNC_D-wzDg9A1JXNWysXNzkAuGGGsIISwMzRhbFEWkip5_idfolnOu6FBpVBKVRO02bT5A6_hC_Y4enwPud0GbILDLynaPsEBQoeXxnYxZVybPrdhi-sYcpd627Ux4HeTO8ArCJDMuLhCF97sM8x-5xS9LR9e68di_bx6qu_WhaWc0kIoY6EUlZOWVl65Rnpnm7IkjYOKLRRhDWcSqBfcCeF5CcwqRkXTeGM4AJ-i-emuTTHnBF5_pvZg0lFTokcpepSiRyl6lDIAtyfg2-w7SA62qT8OQe9in8Lw6j8gZZRS_gOGU2oV</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Risk Level of Design and Procurement Factors Causing Construction Waste Generation</title><source>De Gruyter Open Access Journals</source><source>EZB-FREE-00999 freely available EZB journals</source><creator>Bachayo, A. ; Memon, A. H. ; Hussain, M. ; Rahman, I. A. ; Ahmed, S. J.</creator><creatorcontrib>Bachayo, A. ; Memon, A. H. ; Hussain, M. ; Rahman, I. A. ; Ahmed, S. J.</creatorcontrib><description>Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.</description><identifier>ISSN: 2284-7197</identifier><identifier>EISSN: 2284-7197</identifier><identifier>DOI: 10.2478/jaes-2022-0002</identifier><language>eng</language><publisher>Sciendo</publisher><subject>average index ; construction waste ; Karachi ; Pakistan ; risk analysis</subject><ispartof>Journal of Applied Engineering Sciences, 2022-05, Vol.12 (1), p.11-16</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c1311-59ace456d7c16f9db7fdcb440bde628902b327e1f53d55f34e2c9215bbfaa3ee3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://sciendo.com/pdf/10.2478/jaes-2022-0002$$EPDF$$P50$$Gwalterdegruyter$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://sciendo.com/article/10.2478/jaes-2022-0002$$EHTML$$P50$$Gwalterdegruyter$$Hfree_for_read</linktohtml><link.rule.ids>314,780,784,27922,27923,75934,75935</link.rule.ids></links><search><creatorcontrib>Bachayo, A.</creatorcontrib><creatorcontrib>Memon, A. H.</creatorcontrib><creatorcontrib>Hussain, M.</creatorcontrib><creatorcontrib>Rahman, I. A.</creatorcontrib><creatorcontrib>Ahmed, S. J.</creatorcontrib><title>Risk Level of Design and Procurement Factors Causing Construction Waste Generation</title><title>Journal of Applied Engineering Sciences</title><description>Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.</description><subject>average index</subject><subject>construction waste</subject><subject>Karachi</subject><subject>Pakistan</subject><subject>risk analysis</subject><issn>2284-7197</issn><issn>2284-7197</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><recordid>eNp1kE1LAzEQhoMoWGqvnvMHtuZjs2nwJKutQkEpiseQTSZla5tIsqv037tLPXjxNC_D-wzDg9A1JXNWysXNzkAuGGGsIISwMzRhbFEWkip5_idfolnOu6FBpVBKVRO02bT5A6_hC_Y4enwPud0GbILDLynaPsEBQoeXxnYxZVybPrdhi-sYcpd627Ux4HeTO8ArCJDMuLhCF97sM8x-5xS9LR9e68di_bx6qu_WhaWc0kIoY6EUlZOWVl65Rnpnm7IkjYOKLRRhDWcSqBfcCeF5CcwqRkXTeGM4AJ-i-emuTTHnBF5_pvZg0lFTokcpepSiRyl6lDIAtyfg2-w7SA62qT8OQe9in8Lw6j8gZZRS_gOGU2oV</recordid><startdate>20220501</startdate><enddate>20220501</enddate><creator>Bachayo, A.</creator><creator>Memon, A. H.</creator><creator>Hussain, M.</creator><creator>Rahman, I. A.</creator><creator>Ahmed, S. J.</creator><general>Sciendo</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20220501</creationdate><title>Risk Level of Design and Procurement Factors Causing Construction Waste Generation</title><author>Bachayo, A. ; Memon, A. H. ; Hussain, M. ; Rahman, I. A. ; Ahmed, S. J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c1311-59ace456d7c16f9db7fdcb440bde628902b327e1f53d55f34e2c9215bbfaa3ee3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>average index</topic><topic>construction waste</topic><topic>Karachi</topic><topic>Pakistan</topic><topic>risk analysis</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Bachayo, A.</creatorcontrib><creatorcontrib>Memon, A. H.</creatorcontrib><creatorcontrib>Hussain, M.</creatorcontrib><creatorcontrib>Rahman, I. A.</creatorcontrib><creatorcontrib>Ahmed, S. J.</creatorcontrib><collection>CrossRef</collection><jtitle>Journal of Applied Engineering Sciences</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Bachayo, A.</au><au>Memon, A. H.</au><au>Hussain, M.</au><au>Rahman, I. A.</au><au>Ahmed, S. J.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Risk Level of Design and Procurement Factors Causing Construction Waste Generation</atitle><jtitle>Journal of Applied Engineering Sciences</jtitle><date>2022-05-01</date><risdate>2022</risdate><volume>12</volume><issue>1</issue><spage>11</spage><epage>16</epage><pages>11-16</pages><issn>2284-7197</issn><eissn>2284-7197</eissn><abstract>Construction waste is a global concern among the practitioners and has got attention of the researchers for many years. This issue is serious in construction industry of Pakistan also and various researchers have contributed in addressing it. This paper identified design and procurement related factors and assessed their risk level in causing construction waste. Data was collected through questionnaire survey amongst the practitioners from client consultants and contractors working on construction projects in Karachi and Hyderabad division of the Sind province. A total of 72 completed questionnaire forms were analysed and the results shows that 8 of the 20 factors are highly important factors and fall in the red zone of the risk matrix. It was also observed that last minute client requirements is reported as most important factor in design related issues while “items not in compliance with specification” is the most risk factor in the category of the procurement. Besides these, “last minute client requirements” and “Mistakes in quantity surveys” are the key factors which have significant effect on project cost. The findings of this study will be helpful for the practitioner to improve design and procurement quality for controlling the waste generation.</abstract><pub>Sciendo</pub><doi>10.2478/jaes-2022-0002</doi><tpages>6</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2284-7197
ispartof Journal of Applied Engineering Sciences, 2022-05, Vol.12 (1), p.11-16
issn 2284-7197
2284-7197
language eng
recordid cdi_crossref_primary_10_2478_jaes_2022_0002
source De Gruyter Open Access Journals; EZB-FREE-00999 freely available EZB journals
subjects average index
construction waste
Karachi
Pakistan
risk analysis
title Risk Level of Design and Procurement Factors Causing Construction Waste Generation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-14T13%3A02%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-walterdegruyter_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Risk%20Level%20of%20Design%20and%20Procurement%20Factors%20Causing%20Construction%20Waste%20Generation&rft.jtitle=Journal%20of%20Applied%20Engineering%20Sciences&rft.au=Bachayo,%20A.&rft.date=2022-05-01&rft.volume=12&rft.issue=1&rft.spage=11&rft.epage=16&rft.pages=11-16&rft.issn=2284-7197&rft.eissn=2284-7197&rft_id=info:doi/10.2478/jaes-2022-0002&rft_dat=%3Cwalterdegruyter_cross%3E10_2478_jaes_2022_000212111%3C/walterdegruyter_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true