Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler

During retrofits taken on power unit ?Nikola Tesla? A6 in 2011 for the purpose of increasing its overall production capacity certain modifications on milling plants have been applied. Enlargement of power steam boiler production capacities included increase in milling plant output with existing numb...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Thermal science 2024, p.255-255
Hauptverfasser: Stamenkovic, Ognjen, Stupar, Goran, Tucakovic, Dragan, Jankovic, Andrija
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 255
container_issue
container_start_page 255
container_title Thermal science
container_volume
creator Stamenkovic, Ognjen
Stupar, Goran
Tucakovic, Dragan
Jankovic, Andrija
description During retrofits taken on power unit ?Nikola Tesla? A6 in 2011 for the purpose of increasing its overall production capacity certain modifications on milling plants have been applied. Enlargement of power steam boiler production capacities included increase in milling plant output with existing number of mills in operation. Changes made on arrangement of pulverized coal burners, geometry of mill gaseous mixture distribution elements inside mill gaseous mixture duct as well as operational rotational speed of mill impeller led to increase of milling capacity to the certain extent. Consequently, applied modifications resulted in higher primary air flow required for the purpose of regulating mill gaseous mixture temperature, thus, reducing secondary airflow in burners below recommended level which affected combustion process within boiler furnace. In this paper results of thermal calculations of power steam boiler and aerodynamic calculations of milling plant for the present operating conditions have been presented. Calculations results have been validated by use of measurements taken on site in present operating conditions. Impact on overall boiler operation made by modifications taken on milling plants has been discussed in details. In text new measures, which would reduce occurred negative effects, have been proposed. Positive effects of proposed measures, as new operating point of milling plant, are confirmed by the results of additionally performed thermal and aerodynamic calculations given in this paper.
doi_str_mv 10.2298/TSCI230529255S
format Article
fullrecord <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_2298_TSCI230529255S</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_2298_TSCI230529255S</sourcerecordid><originalsourceid>FETCH-crossref_primary_10_2298_TSCI230529255S3</originalsourceid><addsrcrecordid>eNqVj8FOwzAQRC0EEqFw5ewfSHHsJk3OFQhuSO09cqx1u1WStbyuqvIRfDNJxYUjp9GM3kgzQjwXaql1U7_stpsPbVSpG12W2xuRaWNW-bqozK3IlClXeVOb6l48MB-Vqqq6Xmfi-5OYscO-x4TA0lOUOLoIlnHcS_AeHcLoLpK8HGZsSkNvxyQpQLQJabyW0gFkOMVADDNKIeGAXzPtaOhOfAVDJAfM8ozpgJOlM0TJCewgO8Ie4qO487ZnePrVhVi-ve4277mL084Ivg0RBxsvbaHa-XX797X5d-EHnflj1g</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><source>Free Full-Text Journals in Chemistry</source><creator>Stamenkovic, Ognjen ; Stupar, Goran ; Tucakovic, Dragan ; Jankovic, Andrija</creator><creatorcontrib>Stamenkovic, Ognjen ; Stupar, Goran ; Tucakovic, Dragan ; Jankovic, Andrija</creatorcontrib><description>During retrofits taken on power unit ?Nikola Tesla? A6 in 2011 for the purpose of increasing its overall production capacity certain modifications on milling plants have been applied. Enlargement of power steam boiler production capacities included increase in milling plant output with existing number of mills in operation. Changes made on arrangement of pulverized coal burners, geometry of mill gaseous mixture distribution elements inside mill gaseous mixture duct as well as operational rotational speed of mill impeller led to increase of milling capacity to the certain extent. Consequently, applied modifications resulted in higher primary air flow required for the purpose of regulating mill gaseous mixture temperature, thus, reducing secondary airflow in burners below recommended level which affected combustion process within boiler furnace. In this paper results of thermal calculations of power steam boiler and aerodynamic calculations of milling plant for the present operating conditions have been presented. Calculations results have been validated by use of measurements taken on site in present operating conditions. Impact on overall boiler operation made by modifications taken on milling plants has been discussed in details. In text new measures, which would reduce occurred negative effects, have been proposed. Positive effects of proposed measures, as new operating point of milling plant, are confirmed by the results of additionally performed thermal and aerodynamic calculations given in this paper.</description><identifier>ISSN: 0354-9836</identifier><identifier>EISSN: 2334-7163</identifier><identifier>DOI: 10.2298/TSCI230529255S</identifier><language>eng</language><ispartof>Thermal science, 2024, p.255-255</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><orcidid>0000-0003-2579-1403 ; 0000-0001-8998-2204</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,4010,27900,27901,27902</link.rule.ids></links><search><creatorcontrib>Stamenkovic, Ognjen</creatorcontrib><creatorcontrib>Stupar, Goran</creatorcontrib><creatorcontrib>Tucakovic, Dragan</creatorcontrib><creatorcontrib>Jankovic, Andrija</creatorcontrib><title>Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler</title><title>Thermal science</title><description>During retrofits taken on power unit ?Nikola Tesla? A6 in 2011 for the purpose of increasing its overall production capacity certain modifications on milling plants have been applied. Enlargement of power steam boiler production capacities included increase in milling plant output with existing number of mills in operation. Changes made on arrangement of pulverized coal burners, geometry of mill gaseous mixture distribution elements inside mill gaseous mixture duct as well as operational rotational speed of mill impeller led to increase of milling capacity to the certain extent. Consequently, applied modifications resulted in higher primary air flow required for the purpose of regulating mill gaseous mixture temperature, thus, reducing secondary airflow in burners below recommended level which affected combustion process within boiler furnace. In this paper results of thermal calculations of power steam boiler and aerodynamic calculations of milling plant for the present operating conditions have been presented. Calculations results have been validated by use of measurements taken on site in present operating conditions. Impact on overall boiler operation made by modifications taken on milling plants has been discussed in details. In text new measures, which would reduce occurred negative effects, have been proposed. Positive effects of proposed measures, as new operating point of milling plant, are confirmed by the results of additionally performed thermal and aerodynamic calculations given in this paper.</description><issn>0354-9836</issn><issn>2334-7163</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNqVj8FOwzAQRC0EEqFw5ewfSHHsJk3OFQhuSO09cqx1u1WStbyuqvIRfDNJxYUjp9GM3kgzQjwXaql1U7_stpsPbVSpG12W2xuRaWNW-bqozK3IlClXeVOb6l48MB-Vqqq6Xmfi-5OYscO-x4TA0lOUOLoIlnHcS_AeHcLoLpK8HGZsSkNvxyQpQLQJabyW0gFkOMVADDNKIeGAXzPtaOhOfAVDJAfM8ozpgJOlM0TJCewgO8Ie4qO487ZnePrVhVi-ve4277mL084Ivg0RBxsvbaHa-XX797X5d-EHnflj1g</recordid><startdate>2024</startdate><enddate>2024</enddate><creator>Stamenkovic, Ognjen</creator><creator>Stupar, Goran</creator><creator>Tucakovic, Dragan</creator><creator>Jankovic, Andrija</creator><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0003-2579-1403</orcidid><orcidid>https://orcid.org/0000-0001-8998-2204</orcidid></search><sort><creationdate>2024</creationdate><title>Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler</title><author>Stamenkovic, Ognjen ; Stupar, Goran ; Tucakovic, Dragan ; Jankovic, Andrija</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-crossref_primary_10_2298_TSCI230529255S3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Stamenkovic, Ognjen</creatorcontrib><creatorcontrib>Stupar, Goran</creatorcontrib><creatorcontrib>Tucakovic, Dragan</creatorcontrib><creatorcontrib>Jankovic, Andrija</creatorcontrib><collection>CrossRef</collection><jtitle>Thermal science</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Stamenkovic, Ognjen</au><au>Stupar, Goran</au><au>Tucakovic, Dragan</au><au>Jankovic, Andrija</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler</atitle><jtitle>Thermal science</jtitle><date>2024</date><risdate>2024</risdate><spage>255</spage><epage>255</epage><pages>255-255</pages><issn>0354-9836</issn><eissn>2334-7163</eissn><abstract>During retrofits taken on power unit ?Nikola Tesla? A6 in 2011 for the purpose of increasing its overall production capacity certain modifications on milling plants have been applied. Enlargement of power steam boiler production capacities included increase in milling plant output with existing number of mills in operation. Changes made on arrangement of pulverized coal burners, geometry of mill gaseous mixture distribution elements inside mill gaseous mixture duct as well as operational rotational speed of mill impeller led to increase of milling capacity to the certain extent. Consequently, applied modifications resulted in higher primary air flow required for the purpose of regulating mill gaseous mixture temperature, thus, reducing secondary airflow in burners below recommended level which affected combustion process within boiler furnace. In this paper results of thermal calculations of power steam boiler and aerodynamic calculations of milling plant for the present operating conditions have been presented. Calculations results have been validated by use of measurements taken on site in present operating conditions. Impact on overall boiler operation made by modifications taken on milling plants has been discussed in details. In text new measures, which would reduce occurred negative effects, have been proposed. Positive effects of proposed measures, as new operating point of milling plant, are confirmed by the results of additionally performed thermal and aerodynamic calculations given in this paper.</abstract><doi>10.2298/TSCI230529255S</doi><orcidid>https://orcid.org/0000-0003-2579-1403</orcidid><orcidid>https://orcid.org/0000-0001-8998-2204</orcidid></addata></record>
fulltext fulltext
identifier ISSN: 0354-9836
ispartof Thermal science, 2024, p.255-255
issn 0354-9836
2334-7163
language eng
recordid cdi_crossref_primary_10_2298_TSCI230529255S
source Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals; Free Full-Text Journals in Chemistry
title Possibillities for increasing efficiency of milling plant operation for the purpose of optimizing combustion process within power steam boiler
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T07%3A26%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Possibillities%20for%20increasing%20efficiency%20of%20milling%20plant%20operation%20for%20the%20purpose%20of%20optimizing%20combustion%20process%20within%20power%20steam%20boiler&rft.jtitle=Thermal%20science&rft.au=Stamenkovic,%20Ognjen&rft.date=2024&rft.spage=255&rft.epage=255&rft.pages=255-255&rft.issn=0354-9836&rft.eissn=2334-7163&rft_id=info:doi/10.2298/TSCI230529255S&rft_dat=%3Ccrossref%3E10_2298_TSCI230529255S%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true