REMOVEMENT WORKS AND CORROSION INVESTIGATION OF COASTAL OBSERVATION PIER AT AJIGAURA BEACH
This paper describes the removement works and corrosion investigation of the 200m long coastal observation pier at Ajigaura beach, which was composed of steel truss framework supported by steel piles. The pier was constructed in 1973 and extended in 1976. The pier was used for observation of waves,...
Gespeichert in:
Veröffentlicht in: | PROCEEDINGS OF CIVIL ENGINEERING IN THE OCEAN 1999, Vol.15, pp.201-206 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!