Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants
By intensively investing in innovation, development and construction, Photovoltaic power plants become the first choice for electricity production due to a number of reasons related to environmental parameters, sustainable development, but also the wide availability of the primary source. However, a...
Gespeichert in:
Veröffentlicht in: | SAR Journal 2024-12, p.411-423 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 423 |
---|---|
container_issue | |
container_start_page | 411 |
container_title | SAR Journal |
container_volume | |
creator | Rahmanović, Adis Saračević, Muzafer Berkovac, Haris |
description | By intensively investing in innovation, development and construction, Photovoltaic power plants become the first choice for electricity production due to a number of reasons related to environmental parameters, sustainable development, but also the wide availability of the primary source. However, a significantly larger number of such power plants compared to fossil fuel power plants with a larger capacity creates new risks, related to the conditions of network infrastructure availability, management of such complex systems, where telemetry management, especially with the introduction of new standards, ICT and advanced technologies, has an increasing significance and brings a number of benefits, eliminates a number of obstacles, but also reduces the perceived risks to an acceptable level. The aim of this article is to show the potential of improving telemetry control at PV power plants, but also to show the results of adequate use of this type of control. With the intensive development of new technologies for remote management and control, there will be an increasing potential and need for their application in Electric Power Systems, which due to the need for sustainable development are becoming more and more complex and demanding, but also more necessary if one wants to ensure safe, reliable and effective exploitation. |
doi_str_mv | 10.18421/SAR74-16 |
format | Article |
fullrecord | <record><control><sourceid>crossref</sourceid><recordid>TN_cdi_crossref_primary_10_18421_SAR74_16</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_18421_SAR74_16</sourcerecordid><originalsourceid>FETCH-crossref_primary_10_18421_SAR74_163</originalsourceid><addsrcrecordid>eNqVj0GLwjAUhIMoKOrBf_CuHuo2rUZ7lLLiXqRo7yHWVxuIeZJEZf-9VZa9yxxm-GYuw9iExzO-mif867DeL-cRFx02SATPoiwTafc_LxZ9NvZeH-NUJK3S5YDhISh7Uu7koXXY4QN-8hJKrBpLhs4aPWgLoUHY3GwVNFmguu0NXjA4XUFONjgyL1o0FOhOJqiWF_RAB4VRNvgR69XKeBz_-ZBNN99lvo0qR947rOXV6Ytyv5LH8n1Fvq9ILtJPtk8dbU9z</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants</title><source>EZB Electronic Journals Library</source><creator>Rahmanović, Adis ; Saračević, Muzafer ; Berkovac, Haris</creator><creatorcontrib>Rahmanović, Adis ; Saračević, Muzafer ; Berkovac, Haris</creatorcontrib><description>By intensively investing in innovation, development and construction, Photovoltaic power plants become the first choice for electricity production due to a number of reasons related to environmental parameters, sustainable development, but also the wide availability of the primary source. However, a significantly larger number of such power plants compared to fossil fuel power plants with a larger capacity creates new risks, related to the conditions of network infrastructure availability, management of such complex systems, where telemetry management, especially with the introduction of new standards, ICT and advanced technologies, has an increasing significance and brings a number of benefits, eliminates a number of obstacles, but also reduces the perceived risks to an acceptable level. The aim of this article is to show the potential of improving telemetry control at PV power plants, but also to show the results of adequate use of this type of control. With the intensive development of new technologies for remote management and control, there will be an increasing potential and need for their application in Electric Power Systems, which due to the need for sustainable development are becoming more and more complex and demanding, but also more necessary if one wants to ensure safe, reliable and effective exploitation.</description><identifier>ISSN: 2619-9955</identifier><identifier>EISSN: 2619-9963</identifier><identifier>DOI: 10.18421/SAR74-16</identifier><language>eng</language><ispartof>SAR Journal, 2024-12, p.411-423</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,777,781,27905,27906</link.rule.ids></links><search><creatorcontrib>Rahmanović, Adis</creatorcontrib><creatorcontrib>Saračević, Muzafer</creatorcontrib><creatorcontrib>Berkovac, Haris</creatorcontrib><title>Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants</title><title>SAR Journal</title><description>By intensively investing in innovation, development and construction, Photovoltaic power plants become the first choice for electricity production due to a number of reasons related to environmental parameters, sustainable development, but also the wide availability of the primary source. However, a significantly larger number of such power plants compared to fossil fuel power plants with a larger capacity creates new risks, related to the conditions of network infrastructure availability, management of such complex systems, where telemetry management, especially with the introduction of new standards, ICT and advanced technologies, has an increasing significance and brings a number of benefits, eliminates a number of obstacles, but also reduces the perceived risks to an acceptable level. The aim of this article is to show the potential of improving telemetry control at PV power plants, but also to show the results of adequate use of this type of control. With the intensive development of new technologies for remote management and control, there will be an increasing potential and need for their application in Electric Power Systems, which due to the need for sustainable development are becoming more and more complex and demanding, but also more necessary if one wants to ensure safe, reliable and effective exploitation.</description><issn>2619-9955</issn><issn>2619-9963</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNqVj0GLwjAUhIMoKOrBf_CuHuo2rUZ7lLLiXqRo7yHWVxuIeZJEZf-9VZa9yxxm-GYuw9iExzO-mif867DeL-cRFx02SATPoiwTafc_LxZ9NvZeH-NUJK3S5YDhISh7Uu7koXXY4QN-8hJKrBpLhs4aPWgLoUHY3GwVNFmguu0NXjA4XUFONjgyL1o0FOhOJqiWF_RAB4VRNvgR69XKeBz_-ZBNN99lvo0qR947rOXV6Ytyv5LH8n1Fvq9ILtJPtk8dbU9z</recordid><startdate>20241227</startdate><enddate>20241227</enddate><creator>Rahmanović, Adis</creator><creator>Saračević, Muzafer</creator><creator>Berkovac, Haris</creator><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20241227</creationdate><title>Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants</title><author>Rahmanović, Adis ; Saračević, Muzafer ; Berkovac, Haris</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-crossref_primary_10_18421_SAR74_163</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Rahmanović, Adis</creatorcontrib><creatorcontrib>Saračević, Muzafer</creatorcontrib><creatorcontrib>Berkovac, Haris</creatorcontrib><collection>CrossRef</collection><jtitle>SAR Journal</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Rahmanović, Adis</au><au>Saračević, Muzafer</au><au>Berkovac, Haris</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants</atitle><jtitle>SAR Journal</jtitle><date>2024-12-27</date><risdate>2024</risdate><spage>411</spage><epage>423</epage><pages>411-423</pages><issn>2619-9955</issn><eissn>2619-9963</eissn><abstract>By intensively investing in innovation, development and construction, Photovoltaic power plants become the first choice for electricity production due to a number of reasons related to environmental parameters, sustainable development, but also the wide availability of the primary source. However, a significantly larger number of such power plants compared to fossil fuel power plants with a larger capacity creates new risks, related to the conditions of network infrastructure availability, management of such complex systems, where telemetry management, especially with the introduction of new standards, ICT and advanced technologies, has an increasing significance and brings a number of benefits, eliminates a number of obstacles, but also reduces the perceived risks to an acceptable level. The aim of this article is to show the potential of improving telemetry control at PV power plants, but also to show the results of adequate use of this type of control. With the intensive development of new technologies for remote management and control, there will be an increasing potential and need for their application in Electric Power Systems, which due to the need for sustainable development are becoming more and more complex and demanding, but also more necessary if one wants to ensure safe, reliable and effective exploitation.</abstract><doi>10.18421/SAR74-16</doi></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2619-9955 |
ispartof | SAR Journal, 2024-12, p.411-423 |
issn | 2619-9955 2619-9963 |
language | eng |
recordid | cdi_crossref_primary_10_18421_SAR74_16 |
source | EZB Electronic Journals Library |
title | Standards and New ICT Technologies in the Function of Telemetric Control of Photovoltaic Power Plants |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T17%3A17%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Standards%20and%20New%20ICT%20Technologies%20in%20the%20Function%20of%20Telemetric%20Control%20of%20Photovoltaic%20Power%20Plants&rft.jtitle=SAR%20Journal&rft.au=Rahmanovi%C4%87,%20Adis&rft.date=2024-12-27&rft.spage=411&rft.epage=423&rft.pages=411-423&rft.issn=2619-9955&rft.eissn=2619-9963&rft_id=info:doi/10.18421/SAR74-16&rft_dat=%3Ccrossref%3E10_18421_SAR74_16%3C/crossref%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |