THE EVALUATING METHOD OF THE CONTINUATION RELIABILITY OF THE CONSTRUCTION LIFE OF RAILWAY TRANSPORT OF THE CHERNOBYL NPP

A methodical approach to the reliability estimation and service life prolongation of the railway carrier vehicle design, included into the bulk container wagon TK-8, and intended for transportation of exhausted nuclear fuel by rail tracks of the alienation zone is described. The results of work perf...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nauka ta progres transportu 2008 (22), p.23-24
Hauptverfasser: Donchenko, A. V., Khudiienko, V. A., Sheleiko, T. V.
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!