Study of PWR hot leg creep rupture and RCS depressurization strategy during an SBO accident

Preventing the leakage of radioactive materials is important to nuclear safety. During a station blackout accident in pressurized water reactors, the hot leg creep rupture caused by hot leg countercurrent flow occurs before the reactor pressure vessel failure that caused by lower head rupture. The s...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Kerntechnik (1987) 2021-06, Vol.86 (3), p.194-201
Hauptverfasser: Wu, L., Miao, H., Yu, P., Huang, Z., Zheng, J., Li, J., Zhai, Z., Jia, T.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Preventing the leakage of radioactive materials is important to nuclear safety. During a station blackout accident in pressurized water reactors, the hot leg creep rupture caused by hot leg countercurrent flow occurs before the reactor pressure vessel failure that caused by lower head rupture. The secondary fission products barrier is lost after hot leg creep rupture. An analysis for this phenomenon was done using the Modular Accident Analysis Program version 4.0.4 code. A station blackout accident for CPR1000 is simulated and the occurrence and influence of hot leg creep rupture phenomenon are analyzed in detail. After that, a sensitivity analysis of the opening of different pressurizer pilot-operated relief valves at five minutes after entering severe accident management guideline (before the hot leg creep rupture occurs) is studied. The results show that reactor pressure vessel failure time can be extended by at least 4 h if at least one pilot-operated relief valve is opened and direct containment heating phenomenon can be eliminated if at least two pilot-operated relief valves are opened.
ISSN:0932-3902
2195-8580
DOI:10.1515/kern-2021-0005