Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)

A planning method for multi-stage logistic system is proposed to reduce total logistics costs and stock-out under uncertain demand. Mathematical model is constructed to decide logistics between different locations and inventory at locations. The proposed method is applied to decide logistics plan in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C 2013, Vol.79(798), pp.190-202
Hauptverfasser: TOYOOKA, Yasuhiko, ARAKAWA, Masahiro
Format: Artikel
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 202
container_issue 798
container_start_page 190
container_title TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C
container_volume 79
creator TOYOOKA, Yasuhiko
ARAKAWA, Masahiro
description A planning method for multi-stage logistic system is proposed to reduce total logistics costs and stock-out under uncertain demand. Mathematical model is constructed to decide logistics between different locations and inventory at locations. The proposed method is applied to decide logistics plan in continuous time periods as rolling planning method. The problem involves two types of significant measures: logistics costs in the system and stock-out at shops. In order to reduce total logistics cost, virtual logistics process generated through plural periods is considered in the mathematical model. In addition, inventory control at shops is included to reduce probability of stock-out at all shops in the model. Strategy to control inventory for reduction of probability of stock-out is applied under the condition logistic cost is reduced to execute rolling planning in multi-periods. The proposed method is compared with Pull system as the conventional procedure to evaluate the effectiveness of the method. Further, characteristics of the proposed method are investigated on simple data using probability distribution of demand in practical use.
doi_str_mv 10.1299/kikaic.79.190
format Article
fullrecord <record><control><sourceid>jstage_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1299_kikaic_79_190</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>article_kikaic_79_798_79_190_article_char_en</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2630-94cee070f6765a3620093ee4f38db6f2af10fe2a097d9b400e9a9f0110770bf3</originalsourceid><addsrcrecordid>eNpNkL1vwjAQxa2qlYpaxu4e2yH0Eps4HlvoBxKoqNA5cpIzuAQb2aESQ__3JgKhTnd693snvUfIXQyDOJHycWM2ypQDIQexhAvSi7OMRxkb8kvSA5aJaAgJvyb9EEwBkKaMM572yO_YhHLfis5Sp-nE_qBtnD_QkbONdzVt9dm-bky0aNQKA526lQmNKQNdHEKDW3o_927ngqo7_6era2NXdF4ra7tlhs3aVXRvK_T0y5boG2UsHeNW2erhllxpVQfsn-YNWb6-LEfv0fTjbTJ6mkZlkjKIJC8RQYBORTpULE0AJEPkmmVVkepE6Rg0JgqkqGTBAVAqqSGOQQgoNLsh0fFt6V0IHnW-82ar_CGPIe_ay4_t5ULmbXst_3zkv0MX-kwr3wav8R8tZHYynY_lWvkcLfsDZkp95Q</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)</title><source>J-STAGE Free</source><source>EZB-FREE-00999 freely available EZB journals</source><creator>TOYOOKA, Yasuhiko ; ARAKAWA, Masahiro</creator><creatorcontrib>TOYOOKA, Yasuhiko ; ARAKAWA, Masahiro</creatorcontrib><description>A planning method for multi-stage logistic system is proposed to reduce total logistics costs and stock-out under uncertain demand. Mathematical model is constructed to decide logistics between different locations and inventory at locations. The proposed method is applied to decide logistics plan in continuous time periods as rolling planning method. The problem involves two types of significant measures: logistics costs in the system and stock-out at shops. In order to reduce total logistics cost, virtual logistics process generated through plural periods is considered in the mathematical model. In addition, inventory control at shops is included to reduce probability of stock-out at all shops in the model. Strategy to control inventory for reduction of probability of stock-out is applied under the condition logistic cost is reduced to execute rolling planning in multi-periods. The proposed method is compared with Pull system as the conventional procedure to evaluate the effectiveness of the method. Further, characteristics of the proposed method are investigated on simple data using probability distribution of demand in practical use.</description><identifier>ISSN: 0387-5024</identifier><identifier>EISSN: 1884-8354</identifier><identifier>DOI: 10.1299/kikaic.79.190</identifier><language>eng ; jpn</language><publisher>The Japan Society of Mechanical Engineers</publisher><subject>Inventory Management ; Logistics Cost ; Multi-Stage Logistics System ; Rolling Planning ; Stock-Out ; Supply Chain ; Uncertain Demand</subject><ispartof>TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C, 2013, Vol.79(798), pp.190-202</ispartof><rights>2013 The Japan Society of Mechanical Engineers</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,777,781,1878,4011,27905,27906,27907</link.rule.ids></links><search><creatorcontrib>TOYOOKA, Yasuhiko</creatorcontrib><creatorcontrib>ARAKAWA, Masahiro</creatorcontrib><title>Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)</title><title>TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C</title><addtitle>Trans.JSME, C</addtitle><description>A planning method for multi-stage logistic system is proposed to reduce total logistics costs and stock-out under uncertain demand. Mathematical model is constructed to decide logistics between different locations and inventory at locations. The proposed method is applied to decide logistics plan in continuous time periods as rolling planning method. The problem involves two types of significant measures: logistics costs in the system and stock-out at shops. In order to reduce total logistics cost, virtual logistics process generated through plural periods is considered in the mathematical model. In addition, inventory control at shops is included to reduce probability of stock-out at all shops in the model. Strategy to control inventory for reduction of probability of stock-out is applied under the condition logistic cost is reduced to execute rolling planning in multi-periods. The proposed method is compared with Pull system as the conventional procedure to evaluate the effectiveness of the method. Further, characteristics of the proposed method are investigated on simple data using probability distribution of demand in practical use.</description><subject>Inventory Management</subject><subject>Logistics Cost</subject><subject>Multi-Stage Logistics System</subject><subject>Rolling Planning</subject><subject>Stock-Out</subject><subject>Supply Chain</subject><subject>Uncertain Demand</subject><issn>0387-5024</issn><issn>1884-8354</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2013</creationdate><recordtype>article</recordtype><recordid>eNpNkL1vwjAQxa2qlYpaxu4e2yH0Eps4HlvoBxKoqNA5cpIzuAQb2aESQ__3JgKhTnd693snvUfIXQyDOJHycWM2ypQDIQexhAvSi7OMRxkb8kvSA5aJaAgJvyb9EEwBkKaMM572yO_YhHLfis5Sp-nE_qBtnD_QkbONdzVt9dm-bky0aNQKA526lQmNKQNdHEKDW3o_927ngqo7_6era2NXdF4ra7tlhs3aVXRvK_T0y5boG2UsHeNW2erhllxpVQfsn-YNWb6-LEfv0fTjbTJ6mkZlkjKIJC8RQYBORTpULE0AJEPkmmVVkepE6Rg0JgqkqGTBAVAqqSGOQQgoNLsh0fFt6V0IHnW-82ar_CGPIe_ay4_t5ULmbXst_3zkv0MX-kwr3wav8R8tZHYynY_lWvkcLfsDZkp95Q</recordid><startdate>2013</startdate><enddate>2013</enddate><creator>TOYOOKA, Yasuhiko</creator><creator>ARAKAWA, Masahiro</creator><general>The Japan Society of Mechanical Engineers</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>2013</creationdate><title>Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)</title><author>TOYOOKA, Yasuhiko ; ARAKAWA, Masahiro</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2630-94cee070f6765a3620093ee4f38db6f2af10fe2a097d9b400e9a9f0110770bf3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng ; jpn</language><creationdate>2013</creationdate><topic>Inventory Management</topic><topic>Logistics Cost</topic><topic>Multi-Stage Logistics System</topic><topic>Rolling Planning</topic><topic>Stock-Out</topic><topic>Supply Chain</topic><topic>Uncertain Demand</topic><toplevel>online_resources</toplevel><creatorcontrib>TOYOOKA, Yasuhiko</creatorcontrib><creatorcontrib>ARAKAWA, Masahiro</creatorcontrib><collection>CrossRef</collection><jtitle>TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>TOYOOKA, Yasuhiko</au><au>ARAKAWA, Masahiro</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)</atitle><jtitle>TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C</jtitle><addtitle>Trans.JSME, C</addtitle><date>2013</date><risdate>2013</risdate><volume>79</volume><issue>798</issue><spage>190</spage><epage>202</epage><pages>190-202</pages><issn>0387-5024</issn><eissn>1884-8354</eissn><abstract>A planning method for multi-stage logistic system is proposed to reduce total logistics costs and stock-out under uncertain demand. Mathematical model is constructed to decide logistics between different locations and inventory at locations. The proposed method is applied to decide logistics plan in continuous time periods as rolling planning method. The problem involves two types of significant measures: logistics costs in the system and stock-out at shops. In order to reduce total logistics cost, virtual logistics process generated through plural periods is considered in the mathematical model. In addition, inventory control at shops is included to reduce probability of stock-out at all shops in the model. Strategy to control inventory for reduction of probability of stock-out is applied under the condition logistic cost is reduced to execute rolling planning in multi-periods. The proposed method is compared with Pull system as the conventional procedure to evaluate the effectiveness of the method. Further, characteristics of the proposed method are investigated on simple data using probability distribution of demand in practical use.</abstract><pub>The Japan Society of Mechanical Engineers</pub><doi>10.1299/kikaic.79.190</doi><tpages>13</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0387-5024
ispartof TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series C, 2013, Vol.79(798), pp.190-202
issn 0387-5024
1884-8354
language eng ; jpn
recordid cdi_crossref_primary_10_1299_kikaic_79_190
source J-STAGE Free; EZB-FREE-00999 freely available EZB journals
subjects Inventory Management
Logistics Cost
Multi-Stage Logistics System
Rolling Planning
Stock-Out
Supply Chain
Uncertain Demand
title Discussion of Inventory Control on Multi-Stages Logistics System (Proposal of Rolling Planning Method under Uncertain Demand)
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-17T09%3A58%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-jstage_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Discussion%20of%20Inventory%20Control%20on%20Multi-Stages%20Logistics%20System%20(Proposal%20of%20Rolling%20Planning%20Method%20under%20Uncertain%20Demand)&rft.jtitle=TRANSACTIONS%20OF%20THE%20JAPAN%20SOCIETY%20OF%20MECHANICAL%20ENGINEERS%20Series%20C&rft.au=TOYOOKA,%20Yasuhiko&rft.date=2013&rft.volume=79&rft.issue=798&rft.spage=190&rft.epage=202&rft.pages=190-202&rft.issn=0387-5024&rft.eissn=1884-8354&rft_id=info:doi/10.1299/kikaic.79.190&rft_dat=%3Cjstage_cross%3Earticle_kikaic_79_798_79_190_article_char_en%3C/jstage_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true