Determination and application study of optimal delay time for tunnel millisecond blasting based on interference vibration reduction method
In tunnel excavation, blasting is widely adopted as an efficient excavation method. However, the influence of vibration on tunnel surrounding rock and support structures during the blasting process cannot be ignored. In this study, based on the background of tunnel blasting construction, we theoreti...
Gespeichert in:
Veröffentlicht in: | Journal of vibration and control 2024-06 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!