Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology
There is limited understanding concerning the practicable challenges that could impede the developmental process of railway infrastructure projects, and the possible negative effect of the Standard Gauge Railway (SGR) technology in Ghana. Given that the majority of the population are unfamiliar with...
Gespeichert in:
Veröffentlicht in: | Journal of infrastructure development 2021-12, Vol.13 (2), p.87-106 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 106 |
---|---|
container_issue | 2 |
container_start_page | 87 |
container_title | Journal of infrastructure development |
container_volume | 13 |
creator | Awal, Iddrisu Mohammed Senadjki, Abdelhak Nee, Au Yong Hui |
description | There is limited understanding concerning the practicable challenges that could impede the developmental process of railway infrastructure projects, and the possible negative effect of the Standard Gauge Railway (SGR) technology in Ghana. Given that the majority of the population are unfamiliar with the newly planned railway system. Our research intends to contribute towards the development of human capital and elevating the standard of living through the assertion of productive policies to ensure rapid infrastructure development by highlighting not only the socio-economic impact, but the negative impact of the railway infrastructure in the society. Also, this study discusses the possible challenges that could hinder the railway infrastructure development process. This study employs face-to-face interviews and Focus Group Discussions (FGDs) interview sessions that assimilate 35 respondents. Data collected is transcribed verbatim and analysed thematically. The findings reveal that corruption, unstable political discourse, lack of modern technology, and the impact of the Covid19 pandemic are among the critical challenges to hinder the progress and completion of the railway infrastructure development. By-laws should be designated ensuring that every uncompleted national project must be completed and not abandoned by the successive governments regardless of political differences.
JEL Classifications: R4, O1, Q18, Q55, Q51 |
doi_str_mv | 10.1177/09749306211058500 |
format | Article |
fullrecord | <record><control><sourceid>sage_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1177_09749306211058500</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.1177_09749306211058500</sage_id><sourcerecordid>10.1177_09749306211058500</sourcerecordid><originalsourceid>FETCH-LOGICAL-c1380-ff5a87b7643dcb7d609a4a78d779c99ba3bc300805d9a0a9cb19a2ab4e0aa52e3</originalsourceid><addsrcrecordid>eNp9kM1Kw0AUhYMoWKsP4G6Wuki9k2QyM-6kaiwUlLauw81k0qakkzCTKMWXN7GiC8HV_eF8B87xvEsKE0o5vwHJIxlCHFAKTDCAI2_U_5jPZCyPv_bIHwSn3plzW4BYMh6NvI8XW7tGq9YRNDmZ7Rqdlztt-rsuyALL6h33ZGYKi661nWo7q8m9ftNV3QwyUhqSbNDg7cCiagds2fZeaHOSYLfWPy5Xy2RxTVZabUxd1ev9uXdSYOX0xfcce6-PD6vpkz9_TmbTu7mvaCjALwqGgmc8jsJcZTyPQWKEXOScSyVlhmGmQgABLJcIKFVGJQaYRRoQWaDDsUcPvqrP6qwu0saWO7T7lEI6tJf-aa9nyIHRqjal-yW4iJkQAee9ZHKQOFzrdFt31vQp_vH8BP_cezU</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology</title><source>SAGE Complete</source><creator>Awal, Iddrisu Mohammed ; Senadjki, Abdelhak ; Nee, Au Yong Hui</creator><creatorcontrib>Awal, Iddrisu Mohammed ; Senadjki, Abdelhak ; Nee, Au Yong Hui</creatorcontrib><description>There is limited understanding concerning the practicable challenges that could impede the developmental process of railway infrastructure projects, and the possible negative effect of the Standard Gauge Railway (SGR) technology in Ghana. Given that the majority of the population are unfamiliar with the newly planned railway system. Our research intends to contribute towards the development of human capital and elevating the standard of living through the assertion of productive policies to ensure rapid infrastructure development by highlighting not only the socio-economic impact, but the negative impact of the railway infrastructure in the society. Also, this study discusses the possible challenges that could hinder the railway infrastructure development process. This study employs face-to-face interviews and Focus Group Discussions (FGDs) interview sessions that assimilate 35 respondents. Data collected is transcribed verbatim and analysed thematically. The findings reveal that corruption, unstable political discourse, lack of modern technology, and the impact of the Covid19 pandemic are among the critical challenges to hinder the progress and completion of the railway infrastructure development. By-laws should be designated ensuring that every uncompleted national project must be completed and not abandoned by the successive governments regardless of political differences.
JEL Classifications: R4, O1, Q18, Q55, Q51</description><identifier>ISSN: 0974-9306</identifier><identifier>EISSN: 0975-5969</identifier><identifier>DOI: 10.1177/09749306211058500</identifier><language>eng</language><publisher>New Delhi, India: SAGE Publications</publisher><ispartof>Journal of infrastructure development, 2021-12, Vol.13 (2), p.87-106</ispartof><rights>2021 India Development Foundation</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c1380-ff5a87b7643dcb7d609a4a78d779c99ba3bc300805d9a0a9cb19a2ab4e0aa52e3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.1177/09749306211058500$$EPDF$$P50$$Gsage$$H</linktopdf><linktohtml>$$Uhttps://journals.sagepub.com/doi/10.1177/09749306211058500$$EHTML$$P50$$Gsage$$H</linktohtml><link.rule.ids>314,776,780,21798,27901,27902,43597,43598</link.rule.ids></links><search><creatorcontrib>Awal, Iddrisu Mohammed</creatorcontrib><creatorcontrib>Senadjki, Abdelhak</creatorcontrib><creatorcontrib>Nee, Au Yong Hui</creatorcontrib><title>Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology</title><title>Journal of infrastructure development</title><description>There is limited understanding concerning the practicable challenges that could impede the developmental process of railway infrastructure projects, and the possible negative effect of the Standard Gauge Railway (SGR) technology in Ghana. Given that the majority of the population are unfamiliar with the newly planned railway system. Our research intends to contribute towards the development of human capital and elevating the standard of living through the assertion of productive policies to ensure rapid infrastructure development by highlighting not only the socio-economic impact, but the negative impact of the railway infrastructure in the society. Also, this study discusses the possible challenges that could hinder the railway infrastructure development process. This study employs face-to-face interviews and Focus Group Discussions (FGDs) interview sessions that assimilate 35 respondents. Data collected is transcribed verbatim and analysed thematically. The findings reveal that corruption, unstable political discourse, lack of modern technology, and the impact of the Covid19 pandemic are among the critical challenges to hinder the progress and completion of the railway infrastructure development. By-laws should be designated ensuring that every uncompleted national project must be completed and not abandoned by the successive governments regardless of political differences.
JEL Classifications: R4, O1, Q18, Q55, Q51</description><issn>0974-9306</issn><issn>0975-5969</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNp9kM1Kw0AUhYMoWKsP4G6Wuki9k2QyM-6kaiwUlLauw81k0qakkzCTKMWXN7GiC8HV_eF8B87xvEsKE0o5vwHJIxlCHFAKTDCAI2_U_5jPZCyPv_bIHwSn3plzW4BYMh6NvI8XW7tGq9YRNDmZ7Rqdlztt-rsuyALL6h33ZGYKi661nWo7q8m9ftNV3QwyUhqSbNDg7cCiagds2fZeaHOSYLfWPy5Xy2RxTVZabUxd1ev9uXdSYOX0xfcce6-PD6vpkz9_TmbTu7mvaCjALwqGgmc8jsJcZTyPQWKEXOScSyVlhmGmQgABLJcIKFVGJQaYRRoQWaDDsUcPvqrP6qwu0saWO7T7lEI6tJf-aa9nyIHRqjal-yW4iJkQAee9ZHKQOFzrdFt31vQp_vH8BP_cezU</recordid><startdate>202112</startdate><enddate>202112</enddate><creator>Awal, Iddrisu Mohammed</creator><creator>Senadjki, Abdelhak</creator><creator>Nee, Au Yong Hui</creator><general>SAGE Publications</general><scope>OQ6</scope><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>202112</creationdate><title>Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology</title><author>Awal, Iddrisu Mohammed ; Senadjki, Abdelhak ; Nee, Au Yong Hui</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c1380-ff5a87b7643dcb7d609a4a78d779c99ba3bc300805d9a0a9cb19a2ab4e0aa52e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Awal, Iddrisu Mohammed</creatorcontrib><creatorcontrib>Senadjki, Abdelhak</creatorcontrib><creatorcontrib>Nee, Au Yong Hui</creatorcontrib><collection>ECONIS</collection><collection>CrossRef</collection><jtitle>Journal of infrastructure development</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Awal, Iddrisu Mohammed</au><au>Senadjki, Abdelhak</au><au>Nee, Au Yong Hui</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology</atitle><jtitle>Journal of infrastructure development</jtitle><date>2021-12</date><risdate>2021</risdate><volume>13</volume><issue>2</issue><spage>87</spage><epage>106</epage><pages>87-106</pages><issn>0974-9306</issn><eissn>0975-5969</eissn><abstract>There is limited understanding concerning the practicable challenges that could impede the developmental process of railway infrastructure projects, and the possible negative effect of the Standard Gauge Railway (SGR) technology in Ghana. Given that the majority of the population are unfamiliar with the newly planned railway system. Our research intends to contribute towards the development of human capital and elevating the standard of living through the assertion of productive policies to ensure rapid infrastructure development by highlighting not only the socio-economic impact, but the negative impact of the railway infrastructure in the society. Also, this study discusses the possible challenges that could hinder the railway infrastructure development process. This study employs face-to-face interviews and Focus Group Discussions (FGDs) interview sessions that assimilate 35 respondents. Data collected is transcribed verbatim and analysed thematically. The findings reveal that corruption, unstable political discourse, lack of modern technology, and the impact of the Covid19 pandemic are among the critical challenges to hinder the progress and completion of the railway infrastructure development. By-laws should be designated ensuring that every uncompleted national project must be completed and not abandoned by the successive governments regardless of political differences.
JEL Classifications: R4, O1, Q18, Q55, Q51</abstract><cop>New Delhi, India</cop><pub>SAGE Publications</pub><doi>10.1177/09749306211058500</doi><tpages>20</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0974-9306 |
ispartof | Journal of infrastructure development, 2021-12, Vol.13 (2), p.87-106 |
issn | 0974-9306 0975-5969 |
language | eng |
recordid | cdi_crossref_primary_10_1177_09749306211058500 |
source | SAGE Complete |
title | Prospects and Impediments of Railway Infrastructure Development in Ghana: Impact of Standard Gauge Railway (SGR) Technology |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T18%3A01%3A38IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-sage_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Prospects%20and%20Impediments%20of%20Railway%20Infrastructure%20Development%20in%20Ghana:%20Impact%20of%20Standard%20Gauge%20Railway%20(SGR)%20Technology&rft.jtitle=Journal%20of%20infrastructure%20development&rft.au=Awal,%20Iddrisu%20Mohammed&rft.date=2021-12&rft.volume=13&rft.issue=2&rft.spage=87&rft.epage=106&rft.pages=87-106&rft.issn=0974-9306&rft.eissn=0975-5969&rft_id=info:doi/10.1177/09749306211058500&rft_dat=%3Csage_cross%3E10.1177_09749306211058500%3C/sage_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_sage_id=10.1177_09749306211058500&rfr_iscdi=true |