Geotechnical investigations of dredged overburden at the Syncrude oil sand mine in northern Alberta, Canada

The feasibility of constructing a stable overburden waste dump using hydraulic techniques has been investigated. A joint Alberta Oil Sands Technology and Research Authority - Syncrude field pilot resulted in a total of 25 000 m 3 of overburden being dredged, hydraulically transported in lump form, a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Canadian geotechnical journal 1989-02, Vol.26 (1), p.132-153
Hauptverfasser: Lord, E. R. F, Isaac, B. A. A
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!