A Two-Phase Soft Optimization Method for the Uncertain Scheduling Problem in the Steelmaking Industry
In this paper, an uncertain scheduling problem arising from the steelmaking-continuous casting (SCC) production system is investigated. For the practical SCC production system, it is difficult to obtain a schedule with better performance using traditional deterministic scheduling methods since there...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on systems, man, and cybernetics. Systems man, and cybernetics. Systems, 2017-03, Vol.47 (3), p.416-431 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!