Status on Design and Construction of the ITER Buildings and Plant Systems

The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and the Diagnostic building, together with a wide range of auxiliary buildings, such as those for the heating systems, cryoplant, power supply, o...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on plasma science 2018-07, Vol.46 (7), p.2647-2652
Hauptverfasser: Kuehn, Ingo, Cordier, Jean-Jacques, Carafa, Leontin, Darbour, Romaric, Giuseppe, Giovanni Di, Jeannoutot, Thomas, Kotamaki, Miikka, Patisson, Laurent, Perrin, Jean Lou, Rigoni, Giuliano, Rotella, Rossella, Vannuffelen, Fabrice, Vincent, Gregoire, Zhang, Yanhong
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 2652
container_issue 7
container_start_page 2647
container_title IEEE transactions on plasma science
container_volume 46
creator Kuehn, Ingo
Cordier, Jean-Jacques
Carafa, Leontin
Darbour, Romaric
Giuseppe, Giovanni Di
Jeannoutot, Thomas
Kotamaki, Miikka
Patisson, Laurent
Perrin, Jean Lou
Rigoni, Giuliano
Rotella, Rossella
Vannuffelen, Fabrice
Vincent, Gregoire
Zhang, Yanhong
description The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and the Diagnostic building, together with a wide range of auxiliary buildings, such as those for the heating systems, cryoplant, power supply, or the assembly of the Tokamak machine. The ITER project applies a staged approach, with the first plasma phase scheduled end of 2025, followed by the Prefusion power operation phase I and II, and finally the Tritium phase scheduled in 2035. As a consequence of the staged approach, the schedule of the building construction and plant systems installation has to be organized accordingly, and the plant configuration for each phase has to be defined. While the manufacture of the long lead items for the Tokamak machine is currently ongoing, the plant systems are completing the final design and manufacturing design, in order to start the manufacture of the components to be ready on time for the start of the installation works in the buildings. This paper gives an overview of the building overall integration and design process, and the construction status of each building. This paper further highlights the definition freeze and control of the physical and functional interfaces which are needed, in order to decouple the plant systems design and reducing the risk of possible changes propagated to the more advanced and mature interfacing systems. The newly introduced staged approach is described with the requirements on the four plasma phases.
doi_str_mv 10.1109/TPS.2017.2774861
format Article
fullrecord <record><control><sourceid>crossref_RIE</sourceid><recordid>TN_cdi_crossref_primary_10_1109_TPS_2017_2774861</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><ieee_id>8225745</ieee_id><sourcerecordid>10_1109_TPS_2017_2774861</sourcerecordid><originalsourceid>FETCH-LOGICAL-c310t-3eaa993c84fcdcad540cb8c45086c5fc183ad5dc7e4e8992f31d75ad6215362c3</originalsourceid><addsrcrecordid>eNo9kMFLwzAYxYMoWKd3wUv-gc58-ZomOeqcWhg4bD2XmKSzsrXSpIf993ZueHrweO_x-BFyC2wOwPR9tS7nnIGccykzlcMZSUCjTjVKcU4SxjSmqAAvyVUI34xBJhhPSFFGE8dA-44--dBuOmo6Rxd9F-Iw2thOft_Q-OVpUS3f6ePYbl3bbcJfbL01XaTlPkS_C9fkojHb4G9OOiMfz8tq8Zqu3l6KxcMqtQgspuiN0RqtyhrrrHEiY_ZT2emNyq1oLCicTGelz7zSmjcITgrjcg4Cc25xRthx1w59CINv6p-h3ZlhXwOrDyjqCUV9QFGfUEyVu2Ol9d7_xxXnQmYCfwEb91pw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Status on Design and Construction of the ITER Buildings and Plant Systems</title><source>IEEE Electronic Library (IEL)</source><creator>Kuehn, Ingo ; Cordier, Jean-Jacques ; Carafa, Leontin ; Darbour, Romaric ; Giuseppe, Giovanni Di ; Jeannoutot, Thomas ; Kotamaki, Miikka ; Patisson, Laurent ; Perrin, Jean Lou ; Rigoni, Giuliano ; Rotella, Rossella ; Vannuffelen, Fabrice ; Vincent, Gregoire ; Zhang, Yanhong</creator><creatorcontrib>Kuehn, Ingo ; Cordier, Jean-Jacques ; Carafa, Leontin ; Darbour, Romaric ; Giuseppe, Giovanni Di ; Jeannoutot, Thomas ; Kotamaki, Miikka ; Patisson, Laurent ; Perrin, Jean Lou ; Rigoni, Giuliano ; Rotella, Rossella ; Vannuffelen, Fabrice ; Vincent, Gregoire ; Zhang, Yanhong</creatorcontrib><description>The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and the Diagnostic building, together with a wide range of auxiliary buildings, such as those for the heating systems, cryoplant, power supply, or the assembly of the Tokamak machine. The ITER project applies a staged approach, with the first plasma phase scheduled end of 2025, followed by the Prefusion power operation phase I and II, and finally the Tritium phase scheduled in 2035. As a consequence of the staged approach, the schedule of the building construction and plant systems installation has to be organized accordingly, and the plant configuration for each phase has to be defined. While the manufacture of the long lead items for the Tokamak machine is currently ongoing, the plant systems are completing the final design and manufacturing design, in order to start the manufacture of the components to be ready on time for the start of the installation works in the buildings. This paper gives an overview of the building overall integration and design process, and the construction status of each building. This paper further highlights the definition freeze and control of the physical and functional interfaces which are needed, in order to decouple the plant systems design and reducing the risk of possible changes propagated to the more advanced and mature interfacing systems. The newly introduced staged approach is described with the requirements on the four plasma phases.</description><identifier>ISSN: 0093-3813</identifier><identifier>EISSN: 1939-9375</identifier><identifier>DOI: 10.1109/TPS.2017.2774861</identifier><identifier>CODEN: ITPSBD</identifier><language>eng</language><publisher>IEEE</publisher><subject>Building ; Buildings ; construction ; Heating systems ; installation ; ITER ; Layout ; manufacture ; plant system ; Schedules ; Tokamak devices</subject><ispartof>IEEE transactions on plasma science, 2018-07, Vol.46 (7), p.2647-2652</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c310t-3eaa993c84fcdcad540cb8c45086c5fc183ad5dc7e4e8992f31d75ad6215362c3</citedby><cites>FETCH-LOGICAL-c310t-3eaa993c84fcdcad540cb8c45086c5fc183ad5dc7e4e8992f31d75ad6215362c3</cites><orcidid>0000-0002-6094-8018</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://ieeexplore.ieee.org/document/8225745$$EHTML$$P50$$Gieee$$H</linktohtml><link.rule.ids>314,780,784,796,27923,27924,54757</link.rule.ids><linktorsrc>$$Uhttps://ieeexplore.ieee.org/document/8225745$$EView_record_in_IEEE$$FView_record_in_$$GIEEE</linktorsrc></links><search><creatorcontrib>Kuehn, Ingo</creatorcontrib><creatorcontrib>Cordier, Jean-Jacques</creatorcontrib><creatorcontrib>Carafa, Leontin</creatorcontrib><creatorcontrib>Darbour, Romaric</creatorcontrib><creatorcontrib>Giuseppe, Giovanni Di</creatorcontrib><creatorcontrib>Jeannoutot, Thomas</creatorcontrib><creatorcontrib>Kotamaki, Miikka</creatorcontrib><creatorcontrib>Patisson, Laurent</creatorcontrib><creatorcontrib>Perrin, Jean Lou</creatorcontrib><creatorcontrib>Rigoni, Giuliano</creatorcontrib><creatorcontrib>Rotella, Rossella</creatorcontrib><creatorcontrib>Vannuffelen, Fabrice</creatorcontrib><creatorcontrib>Vincent, Gregoire</creatorcontrib><creatorcontrib>Zhang, Yanhong</creatorcontrib><title>Status on Design and Construction of the ITER Buildings and Plant Systems</title><title>IEEE transactions on plasma science</title><addtitle>TPS</addtitle><description>The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and the Diagnostic building, together with a wide range of auxiliary buildings, such as those for the heating systems, cryoplant, power supply, or the assembly of the Tokamak machine. The ITER project applies a staged approach, with the first plasma phase scheduled end of 2025, followed by the Prefusion power operation phase I and II, and finally the Tritium phase scheduled in 2035. As a consequence of the staged approach, the schedule of the building construction and plant systems installation has to be organized accordingly, and the plant configuration for each phase has to be defined. While the manufacture of the long lead items for the Tokamak machine is currently ongoing, the plant systems are completing the final design and manufacturing design, in order to start the manufacture of the components to be ready on time for the start of the installation works in the buildings. This paper gives an overview of the building overall integration and design process, and the construction status of each building. This paper further highlights the definition freeze and control of the physical and functional interfaces which are needed, in order to decouple the plant systems design and reducing the risk of possible changes propagated to the more advanced and mature interfacing systems. The newly introduced staged approach is described with the requirements on the four plasma phases.</description><subject>Building</subject><subject>Buildings</subject><subject>construction</subject><subject>Heating systems</subject><subject>installation</subject><subject>ITER</subject><subject>Layout</subject><subject>manufacture</subject><subject>plant system</subject><subject>Schedules</subject><subject>Tokamak devices</subject><issn>0093-3813</issn><issn>1939-9375</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2018</creationdate><recordtype>article</recordtype><sourceid>RIE</sourceid><recordid>eNo9kMFLwzAYxYMoWKd3wUv-gc58-ZomOeqcWhg4bD2XmKSzsrXSpIf993ZueHrweO_x-BFyC2wOwPR9tS7nnIGccykzlcMZSUCjTjVKcU4SxjSmqAAvyVUI34xBJhhPSFFGE8dA-44--dBuOmo6Rxd9F-Iw2thOft_Q-OVpUS3f6ePYbl3bbcJfbL01XaTlPkS_C9fkojHb4G9OOiMfz8tq8Zqu3l6KxcMqtQgspuiN0RqtyhrrrHEiY_ZT2emNyq1oLCicTGelz7zSmjcITgrjcg4Cc25xRthx1w59CINv6p-h3ZlhXwOrDyjqCUV9QFGfUEyVu2Ol9d7_xxXnQmYCfwEb91pw</recordid><startdate>201807</startdate><enddate>201807</enddate><creator>Kuehn, Ingo</creator><creator>Cordier, Jean-Jacques</creator><creator>Carafa, Leontin</creator><creator>Darbour, Romaric</creator><creator>Giuseppe, Giovanni Di</creator><creator>Jeannoutot, Thomas</creator><creator>Kotamaki, Miikka</creator><creator>Patisson, Laurent</creator><creator>Perrin, Jean Lou</creator><creator>Rigoni, Giuliano</creator><creator>Rotella, Rossella</creator><creator>Vannuffelen, Fabrice</creator><creator>Vincent, Gregoire</creator><creator>Zhang, Yanhong</creator><general>IEEE</general><scope>97E</scope><scope>RIA</scope><scope>RIE</scope><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0002-6094-8018</orcidid></search><sort><creationdate>201807</creationdate><title>Status on Design and Construction of the ITER Buildings and Plant Systems</title><author>Kuehn, Ingo ; Cordier, Jean-Jacques ; Carafa, Leontin ; Darbour, Romaric ; Giuseppe, Giovanni Di ; Jeannoutot, Thomas ; Kotamaki, Miikka ; Patisson, Laurent ; Perrin, Jean Lou ; Rigoni, Giuliano ; Rotella, Rossella ; Vannuffelen, Fabrice ; Vincent, Gregoire ; Zhang, Yanhong</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c310t-3eaa993c84fcdcad540cb8c45086c5fc183ad5dc7e4e8992f31d75ad6215362c3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2018</creationdate><topic>Building</topic><topic>Buildings</topic><topic>construction</topic><topic>Heating systems</topic><topic>installation</topic><topic>ITER</topic><topic>Layout</topic><topic>manufacture</topic><topic>plant system</topic><topic>Schedules</topic><topic>Tokamak devices</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kuehn, Ingo</creatorcontrib><creatorcontrib>Cordier, Jean-Jacques</creatorcontrib><creatorcontrib>Carafa, Leontin</creatorcontrib><creatorcontrib>Darbour, Romaric</creatorcontrib><creatorcontrib>Giuseppe, Giovanni Di</creatorcontrib><creatorcontrib>Jeannoutot, Thomas</creatorcontrib><creatorcontrib>Kotamaki, Miikka</creatorcontrib><creatorcontrib>Patisson, Laurent</creatorcontrib><creatorcontrib>Perrin, Jean Lou</creatorcontrib><creatorcontrib>Rigoni, Giuliano</creatorcontrib><creatorcontrib>Rotella, Rossella</creatorcontrib><creatorcontrib>Vannuffelen, Fabrice</creatorcontrib><creatorcontrib>Vincent, Gregoire</creatorcontrib><creatorcontrib>Zhang, Yanhong</creatorcontrib><collection>IEEE All-Society Periodicals Package (ASPP) 2005-present</collection><collection>IEEE All-Society Periodicals Package (ASPP) 1998-Present</collection><collection>IEEE Electronic Library (IEL)</collection><collection>CrossRef</collection><jtitle>IEEE transactions on plasma science</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Kuehn, Ingo</au><au>Cordier, Jean-Jacques</au><au>Carafa, Leontin</au><au>Darbour, Romaric</au><au>Giuseppe, Giovanni Di</au><au>Jeannoutot, Thomas</au><au>Kotamaki, Miikka</au><au>Patisson, Laurent</au><au>Perrin, Jean Lou</au><au>Rigoni, Giuliano</au><au>Rotella, Rossella</au><au>Vannuffelen, Fabrice</au><au>Vincent, Gregoire</au><au>Zhang, Yanhong</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Status on Design and Construction of the ITER Buildings and Plant Systems</atitle><jtitle>IEEE transactions on plasma science</jtitle><stitle>TPS</stitle><date>2018-07</date><risdate>2018</risdate><volume>46</volume><issue>7</issue><spage>2647</spage><epage>2652</epage><pages>2647-2652</pages><issn>0093-3813</issn><eissn>1939-9375</eissn><coden>ITPSBD</coden><abstract>The Tokamak complex building construction is progressing on the ITER site. This consists of the Tokamak building hosting the machine, the Tritium building and the Diagnostic building, together with a wide range of auxiliary buildings, such as those for the heating systems, cryoplant, power supply, or the assembly of the Tokamak machine. The ITER project applies a staged approach, with the first plasma phase scheduled end of 2025, followed by the Prefusion power operation phase I and II, and finally the Tritium phase scheduled in 2035. As a consequence of the staged approach, the schedule of the building construction and plant systems installation has to be organized accordingly, and the plant configuration for each phase has to be defined. While the manufacture of the long lead items for the Tokamak machine is currently ongoing, the plant systems are completing the final design and manufacturing design, in order to start the manufacture of the components to be ready on time for the start of the installation works in the buildings. This paper gives an overview of the building overall integration and design process, and the construction status of each building. This paper further highlights the definition freeze and control of the physical and functional interfaces which are needed, in order to decouple the plant systems design and reducing the risk of possible changes propagated to the more advanced and mature interfacing systems. The newly introduced staged approach is described with the requirements on the four plasma phases.</abstract><pub>IEEE</pub><doi>10.1109/TPS.2017.2774861</doi><tpages>6</tpages><orcidid>https://orcid.org/0000-0002-6094-8018</orcidid></addata></record>
fulltext fulltext_linktorsrc
identifier ISSN: 0093-3813
ispartof IEEE transactions on plasma science, 2018-07, Vol.46 (7), p.2647-2652
issn 0093-3813
1939-9375
language eng
recordid cdi_crossref_primary_10_1109_TPS_2017_2774861
source IEEE Electronic Library (IEL)
subjects Building
Buildings
construction
Heating systems
installation
ITER
Layout
manufacture
plant system
Schedules
Tokamak devices
title Status on Design and Construction of the ITER Buildings and Plant Systems
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T03%3A18%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_RIE&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Status%20on%20Design%20and%20Construction%20of%20the%20ITER%20Buildings%20and%20Plant%20Systems&rft.jtitle=IEEE%20transactions%20on%20plasma%20science&rft.au=Kuehn,%20Ingo&rft.date=2018-07&rft.volume=46&rft.issue=7&rft.spage=2647&rft.epage=2652&rft.pages=2647-2652&rft.issn=0093-3813&rft.eissn=1939-9375&rft.coden=ITPSBD&rft_id=info:doi/10.1109/TPS.2017.2774861&rft_dat=%3Ccrossref_RIE%3E10_1109_TPS_2017_2774861%3C/crossref_RIE%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_ieee_id=8225745&rfr_iscdi=true