Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system
In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with in-situ variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhanc...
Gespeichert in:
Veröffentlicht in: | Nuclear fusion 2024-09, Vol.64 (9), p.96017 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 9 |
container_start_page | 96017 |
container_title | Nuclear fusion |
container_volume | 64 |
creator | Hopf, C. Harder, N. den Heinemann, B. Angioni, C. Plank, U. Weiland, M. |
description | In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with
in-situ
variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature. |
doi_str_mv | 10.1088/1741-4326/ad63b9 |
format | Article |
fullrecord | <record><control><sourceid>doaj_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1088_1741_4326_ad63b9</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_2fc8200a3720410a9b6281b4cb3decfa</doaj_id><sourcerecordid>oai_doaj_org_article_2fc8200a3720410a9b6281b4cb3decfa</sourcerecordid><originalsourceid>FETCH-LOGICAL-c271t-41d131984b9943bc3781bcaf35d689161b7a6f7989b7625978e469e174e49593</originalsourceid><addsrcrecordid>eNp1kMFOwzAQRC0EEqVw5-gPINSOHSc-lrZApQoOFImbtXac4CqNIyel9O9JCeqN02pXM7Oah9AtJfeUZNmEppxGnMViArlgWp6h0el0jkaExDJKEppcoqu23RBCOWVshNzcGr9rKleXWFvY4sbvbcBQ58NqaxvKA_Y1nr7NFx_4vSkD5Ba_PCzx3nWfvRK7Ompdt8NfEBzoymL73QUwnetdJTS4PbSd3V6jiwKq1t78zTFaPy7Ws-do9fq0nE1XkYlT2kWc5pRRmXEtJWfasDSj2kDBklxkkgqqUxBFKjOpUxEnMs0sF9L2XS2XiWRjtBxicw8b1QS3hXBQHpz6PfhQKgidM5VVcWGymBBgaUw4JSC1iPtn3GiWW1NAn0WGLBN82wZbnPIoUUfq6ohYHRGrgXpvuRsszjdq43eh7rv-L_8BpsSB2Q</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system</title><source>IOP Publishing Free Content</source><source>DOAJ Directory of Open Access Journals</source><creator>Hopf, C. ; Harder, N. den ; Heinemann, B. ; Angioni, C. ; Plank, U. ; Weiland, M.</creator><creatorcontrib>Hopf, C. ; Harder, N. den ; Heinemann, B. ; Angioni, C. ; Plank, U. ; Weiland, M. ; the ASDEX Upgrade Team</creatorcontrib><description>In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with
in-situ
variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.</description><identifier>ISSN: 0029-5515</identifier><identifier>EISSN: 1741-4326</identifier><identifier>DOI: 10.1088/1741-4326/ad63b9</identifier><identifier>CODEN: NUFUAU</identifier><language>eng</language><publisher>IOP Publishing</publisher><subject>neutral beam injection ; plasma control ; variable gap</subject><ispartof>Nuclear fusion, 2024-09, Vol.64 (9), p.96017</ispartof><rights>2024 The Author(s). Published by IOP Publishing Ltd on behalf of the IAEA</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c271t-41d131984b9943bc3781bcaf35d689161b7a6f7989b7625978e469e174e49593</cites><orcidid>0000-0002-5819-9724 ; 0000-0002-7422-5865 ; 0000-0002-1224-9108 ; 0000-0003-0270-9630 ; 0000-0001-6824-7358 ; 0000-0002-1509-4308</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://iopscience.iop.org/article/10.1088/1741-4326/ad63b9/pdf$$EPDF$$P50$$Giop$$Hfree_for_read</linktopdf><link.rule.ids>314,776,780,860,2095,27903,27904,38869,53845</link.rule.ids></links><search><creatorcontrib>Hopf, C.</creatorcontrib><creatorcontrib>Harder, N. den</creatorcontrib><creatorcontrib>Heinemann, B.</creatorcontrib><creatorcontrib>Angioni, C.</creatorcontrib><creatorcontrib>Plank, U.</creatorcontrib><creatorcontrib>Weiland, M.</creatorcontrib><creatorcontrib>the ASDEX Upgrade Team</creatorcontrib><title>Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system</title><title>Nuclear fusion</title><addtitle>NF</addtitle><addtitle>Nucl. Fusion</addtitle><description>In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with
in-situ
variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.</description><subject>neutral beam injection</subject><subject>plasma control</subject><subject>variable gap</subject><issn>0029-5515</issn><issn>1741-4326</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><sourceid>O3W</sourceid><sourceid>DOA</sourceid><recordid>eNp1kMFOwzAQRC0EEqVw5-gPINSOHSc-lrZApQoOFImbtXac4CqNIyel9O9JCeqN02pXM7Oah9AtJfeUZNmEppxGnMViArlgWp6h0el0jkaExDJKEppcoqu23RBCOWVshNzcGr9rKleXWFvY4sbvbcBQ58NqaxvKA_Y1nr7NFx_4vSkD5Ba_PCzx3nWfvRK7Ompdt8NfEBzoymL73QUwnetdJTS4PbSd3V6jiwKq1t78zTFaPy7Ws-do9fq0nE1XkYlT2kWc5pRRmXEtJWfasDSj2kDBklxkkgqqUxBFKjOpUxEnMs0sF9L2XS2XiWRjtBxicw8b1QS3hXBQHpz6PfhQKgidM5VVcWGymBBgaUw4JSC1iPtn3GiWW1NAn0WGLBN82wZbnPIoUUfq6ohYHRGrgXpvuRsszjdq43eh7rv-L_8BpsSB2Q</recordid><startdate>20240901</startdate><enddate>20240901</enddate><creator>Hopf, C.</creator><creator>Harder, N. den</creator><creator>Heinemann, B.</creator><creator>Angioni, C.</creator><creator>Plank, U.</creator><creator>Weiland, M.</creator><general>IOP Publishing</general><scope>O3W</scope><scope>TSCCA</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0002-5819-9724</orcidid><orcidid>https://orcid.org/0000-0002-7422-5865</orcidid><orcidid>https://orcid.org/0000-0002-1224-9108</orcidid><orcidid>https://orcid.org/0000-0003-0270-9630</orcidid><orcidid>https://orcid.org/0000-0001-6824-7358</orcidid><orcidid>https://orcid.org/0000-0002-1509-4308</orcidid></search><sort><creationdate>20240901</creationdate><title>Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system</title><author>Hopf, C. ; Harder, N. den ; Heinemann, B. ; Angioni, C. ; Plank, U. ; Weiland, M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c271t-41d131984b9943bc3781bcaf35d689161b7a6f7989b7625978e469e174e49593</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>neutral beam injection</topic><topic>plasma control</topic><topic>variable gap</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Hopf, C.</creatorcontrib><creatorcontrib>Harder, N. den</creatorcontrib><creatorcontrib>Heinemann, B.</creatorcontrib><creatorcontrib>Angioni, C.</creatorcontrib><creatorcontrib>Plank, U.</creatorcontrib><creatorcontrib>Weiland, M.</creatorcontrib><creatorcontrib>the ASDEX Upgrade Team</creatorcontrib><collection>IOP Publishing Free Content</collection><collection>IOPscience (Open Access)</collection><collection>CrossRef</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Nuclear fusion</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hopf, C.</au><au>Harder, N. den</au><au>Heinemann, B.</au><au>Angioni, C.</au><au>Plank, U.</au><au>Weiland, M.</au><aucorp>the ASDEX Upgrade Team</aucorp><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system</atitle><jtitle>Nuclear fusion</jtitle><stitle>NF</stitle><addtitle>Nucl. Fusion</addtitle><date>2024-09-01</date><risdate>2024</risdate><volume>64</volume><issue>9</issue><spage>96017</spage><pages>96017-</pages><issn>0029-5515</issn><eissn>1741-4326</eissn><coden>NUFUAU</coden><abstract>In early 2022 one source of ASDEX Upgrade’s (AUG) neutral beam injector 2 was equipped with a first-of-its-kind beam extraction grid system with
in-situ
variable extraction/acceleration gap that allows one to choose beam energy and beam power independently in a wide operational space, greatly enhancing experimental flexibility. The gap can be changed from one AUG discharge to the next. The extended operational space makes it possible to reduce beam energy and shine through while maintaining high heating power, or to reduce NBI power at high beam energy, e.g. to stay in L mode. Furthermore, the feature opens the door for advanced control of heat and torque deposition, such as to change torque and ion-to-electron heating ratio at constant power. The prototype system was successfully tested in 2022 and already found first applications in AUG’s physics programme. The remaining three sources of the same injector will also be equipped with variable gaps during the 2022–24 opening of AUG and installation of this new system on all sources of NBI 1 is also under discussion in order to exploit the full potential of the new feature.</abstract><pub>IOP Publishing</pub><doi>10.1088/1741-4326/ad63b9</doi><tpages>7</tpages><orcidid>https://orcid.org/0000-0002-5819-9724</orcidid><orcidid>https://orcid.org/0000-0002-7422-5865</orcidid><orcidid>https://orcid.org/0000-0002-1224-9108</orcidid><orcidid>https://orcid.org/0000-0003-0270-9630</orcidid><orcidid>https://orcid.org/0000-0001-6824-7358</orcidid><orcidid>https://orcid.org/0000-0002-1509-4308</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0029-5515 |
ispartof | Nuclear fusion, 2024-09, Vol.64 (9), p.96017 |
issn | 0029-5515 1741-4326 |
language | eng |
recordid | cdi_crossref_primary_10_1088_1741_4326_ad63b9 |
source | IOP Publishing Free Content; DOAJ Directory of Open Access Journals |
subjects | neutral beam injection plasma control variable gap |
title | Decoupling beam power and beam energy on ASDEX Upgrade NBI with an in-situ variable extraction gap system |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T00%3A47%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-doaj_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Decoupling%20beam%20power%20and%20beam%20energy%20on%20ASDEX%20Upgrade%20NBI%20with%20an%20in-situ%20variable%20extraction%20gap%20system&rft.jtitle=Nuclear%20fusion&rft.au=Hopf,%20C.&rft.aucorp=the%20ASDEX%20Upgrade%20Team&rft.date=2024-09-01&rft.volume=64&rft.issue=9&rft.spage=96017&rft.pages=96017-&rft.issn=0029-5515&rft.eissn=1741-4326&rft.coden=NUFUAU&rft_id=info:doi/10.1088/1741-4326/ad63b9&rft_dat=%3Cdoaj_cross%3Eoai_doaj_org_article_2fc8200a3720410a9b6281b4cb3decfa%3C/doaj_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_doaj_id=oai_doaj_org_article_2fc8200a3720410a9b6281b4cb3decfa&rfr_iscdi=true |