Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach

The design of facility layout is an influential factor in a company's performance to support the streamlined process of production. PT. PMJ is one of the garment industries that produce women's underwear. The total processing time in the sewing department often exceeds the standard time se...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Cogent engineering 2019-01, Vol.6 (1)
Hauptverfasser: Suhardi, Bambang, Juwita, Eldiana, Astuti, Rahmaniyah Dwi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title Cogent engineering
container_volume 6
creator Suhardi, Bambang
Juwita, Eldiana
Astuti, Rahmaniyah Dwi
description The design of facility layout is an influential factor in a company's performance to support the streamlined process of production. PT. PMJ is one of the garment industries that produce women's underwear. The total processing time in the sewing department often exceeds the standard time set by the company. The composition of the machine and facilities at the sewing department is considered to be not optimal. The order of machines in the production line has not been arranged appropriately which causes the excessive distance in the material transfer. In addition, the uses of straight material flow cause the workers to rotate their posture of the body when taking the materials. Based on the results of the assessment of the condition of workers in the initial facility layout using the Quick Exposure Check (QEC) method, the highest total exposure score is on the back. This study aims to redesign the facility layout of PT. PMJ using Systematic Layout Planning (SLP) and ergonomics approach to minimize total material handling cost. Two design alternatives are proposed and the performance of each design is evaluated using ARENA simulation software. Based on the calculation of total material handling cost and simulation, the second proposed facility layout was chosen since it was able to reduce the total material handling cost by 22.92% and material transfer time by 34.01%.
doi_str_mv 10.1080/23311916.2019.1597412
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_23311916_2019_1597412</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_9f45e99acf2e4e21a317b15dee3b9049</doaj_id><sourcerecordid>2352087257</sourcerecordid><originalsourceid>FETCH-LOGICAL-c494t-c195f158fb3ea76220a9a6daddf9b7132e76a5f699387a6d95f59a681537853e3</originalsourceid><addsrcrecordid>eNp9UU1r3DAQNaWFhjQ_oWDIebf6sCzrlhKaNrCQQ9uzmJVHu1psyZW0XfzvK8dpyamnGd6892aGV1UfKdlS0pFPjHNKFW23jFC1pULJhrI31dWCb5bB21f9--ompRMhhPJGEEWuquMDGDe4PNcDzOGcazdOMfzGEX3pfZ3w4vyh7nGCmJ_Bi8vH-vucMo6Qnal3q24awPuFCr6vMR6CD6MzqYap-IE5fqjeWRgS3rzU6-rnw5cf9982u6evj_efdxvTqCZvDFXCUtHZPUeQLWMEFLQ99L1Ve0k5Q9mCsK1SvJNlUNiiEDoquOwER35dPa6-fYCTnqIbIc46gNPPQIgHXT5xZkCtbCNQKTCWYYOMAqdyT0WPyPeKNKp43a5e5YVfZ0xZn8I5-nK-Zlww0kkmZGGJlWViSCmi_beVEr1kpP9mpJeM9EtGRXe36py3IY5wCXHodYZ5CNFG8MYlzf9v8QefDZk4</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2352087257</pqid></control><display><type>article</type><title>Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach</title><source>Taylor &amp; Francis Open Access</source><source>DOAJ Directory of Open Access Journals</source><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Suhardi, Bambang ; Juwita, Eldiana ; Astuti, Rahmaniyah Dwi</creator><creatorcontrib>Suhardi, Bambang ; Juwita, Eldiana ; Astuti, Rahmaniyah Dwi</creatorcontrib><description>The design of facility layout is an influential factor in a company's performance to support the streamlined process of production. PT. PMJ is one of the garment industries that produce women's underwear. The total processing time in the sewing department often exceeds the standard time set by the company. The composition of the machine and facilities at the sewing department is considered to be not optimal. The order of machines in the production line has not been arranged appropriately which causes the excessive distance in the material transfer. In addition, the uses of straight material flow cause the workers to rotate their posture of the body when taking the materials. Based on the results of the assessment of the condition of workers in the initial facility layout using the Quick Exposure Check (QEC) method, the highest total exposure score is on the back. This study aims to redesign the facility layout of PT. PMJ using Systematic Layout Planning (SLP) and ergonomics approach to minimize total material handling cost. Two design alternatives are proposed and the performance of each design is evaluated using ARENA simulation software. Based on the calculation of total material handling cost and simulation, the second proposed facility layout was chosen since it was able to reduce the total material handling cost by 22.92% and material transfer time by 34.01%.</description><identifier>ISSN: 2331-1916</identifier><identifier>EISSN: 2331-1916</identifier><identifier>DOI: 10.1080/23311916.2019.1597412</identifier><language>eng</language><publisher>Abingdon: Cogent</publisher><subject>ARENA ; Ergonomics ; Facilities management ; facility layout ; Layouts ; Materials handling ; Quick exposure check ; Redesign ; Sewing ; Systematic layout planning ; Underwear</subject><ispartof>Cogent engineering, 2019-01, Vol.6 (1)</ispartof><rights>2019 The Author(s). This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license. 2019</rights><rights>2019 The Author(s). This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license. This work is licensed under the Creative Commons Attribution License http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c494t-c195f158fb3ea76220a9a6daddf9b7132e76a5f699387a6d95f59a681537853e3</citedby><cites>FETCH-LOGICAL-c494t-c195f158fb3ea76220a9a6daddf9b7132e76a5f699387a6d95f59a681537853e3</cites><orcidid>0000-0001-7700-3494</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.tandfonline.com/doi/pdf/10.1080/23311916.2019.1597412$$EPDF$$P50$$Ginformaworld$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.tandfonline.com/doi/full/10.1080/23311916.2019.1597412$$EHTML$$P50$$Ginformaworld$$Hfree_for_read</linktohtml><link.rule.ids>314,776,780,860,2096,27479,27901,27902,59116,59117</link.rule.ids></links><search><creatorcontrib>Suhardi, Bambang</creatorcontrib><creatorcontrib>Juwita, Eldiana</creatorcontrib><creatorcontrib>Astuti, Rahmaniyah Dwi</creatorcontrib><title>Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach</title><title>Cogent engineering</title><description>The design of facility layout is an influential factor in a company's performance to support the streamlined process of production. PT. PMJ is one of the garment industries that produce women's underwear. The total processing time in the sewing department often exceeds the standard time set by the company. The composition of the machine and facilities at the sewing department is considered to be not optimal. The order of machines in the production line has not been arranged appropriately which causes the excessive distance in the material transfer. In addition, the uses of straight material flow cause the workers to rotate their posture of the body when taking the materials. Based on the results of the assessment of the condition of workers in the initial facility layout using the Quick Exposure Check (QEC) method, the highest total exposure score is on the back. This study aims to redesign the facility layout of PT. PMJ using Systematic Layout Planning (SLP) and ergonomics approach to minimize total material handling cost. Two design alternatives are proposed and the performance of each design is evaluated using ARENA simulation software. Based on the calculation of total material handling cost and simulation, the second proposed facility layout was chosen since it was able to reduce the total material handling cost by 22.92% and material transfer time by 34.01%.</description><subject>ARENA</subject><subject>Ergonomics</subject><subject>Facilities management</subject><subject>facility layout</subject><subject>Layouts</subject><subject>Materials handling</subject><subject>Quick exposure check</subject><subject>Redesign</subject><subject>Sewing</subject><subject>Systematic layout planning</subject><subject>Underwear</subject><issn>2331-1916</issn><issn>2331-1916</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><sourceid>0YH</sourceid><sourceid>BENPR</sourceid><sourceid>DOA</sourceid><recordid>eNp9UU1r3DAQNaWFhjQ_oWDIebf6sCzrlhKaNrCQQ9uzmJVHu1psyZW0XfzvK8dpyamnGd6892aGV1UfKdlS0pFPjHNKFW23jFC1pULJhrI31dWCb5bB21f9--ompRMhhPJGEEWuquMDGDe4PNcDzOGcazdOMfzGEX3pfZ3w4vyh7nGCmJ_Bi8vH-vucMo6Qnal3q24awPuFCr6vMR6CD6MzqYap-IE5fqjeWRgS3rzU6-rnw5cf9982u6evj_efdxvTqCZvDFXCUtHZPUeQLWMEFLQ99L1Ve0k5Q9mCsK1SvJNlUNiiEDoquOwER35dPa6-fYCTnqIbIc46gNPPQIgHXT5xZkCtbCNQKTCWYYOMAqdyT0WPyPeKNKp43a5e5YVfZ0xZn8I5-nK-Zlww0kkmZGGJlWViSCmi_beVEr1kpP9mpJeM9EtGRXe36py3IY5wCXHodYZ5CNFG8MYlzf9v8QefDZk4</recordid><startdate>20190101</startdate><enddate>20190101</enddate><creator>Suhardi, Bambang</creator><creator>Juwita, Eldiana</creator><creator>Astuti, Rahmaniyah Dwi</creator><general>Cogent</general><general>Taylor &amp; Francis Ltd</general><general>Taylor &amp; Francis Group</general><scope>0YH</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope><scope>DOA</scope><orcidid>https://orcid.org/0000-0001-7700-3494</orcidid></search><sort><creationdate>20190101</creationdate><title>Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach</title><author>Suhardi, Bambang ; Juwita, Eldiana ; Astuti, Rahmaniyah Dwi</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c494t-c195f158fb3ea76220a9a6daddf9b7132e76a5f699387a6d95f59a681537853e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>ARENA</topic><topic>Ergonomics</topic><topic>Facilities management</topic><topic>facility layout</topic><topic>Layouts</topic><topic>Materials handling</topic><topic>Quick exposure check</topic><topic>Redesign</topic><topic>Sewing</topic><topic>Systematic layout planning</topic><topic>Underwear</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Suhardi, Bambang</creatorcontrib><creatorcontrib>Juwita, Eldiana</creatorcontrib><creatorcontrib>Astuti, Rahmaniyah Dwi</creatorcontrib><collection>Taylor &amp; Francis Open Access</collection><collection>CrossRef</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science &amp; Engineering Collection</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Cogent engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Suhardi, Bambang</au><au>Juwita, Eldiana</au><au>Astuti, Rahmaniyah Dwi</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach</atitle><jtitle>Cogent engineering</jtitle><date>2019-01-01</date><risdate>2019</risdate><volume>6</volume><issue>1</issue><issn>2331-1916</issn><eissn>2331-1916</eissn><abstract>The design of facility layout is an influential factor in a company's performance to support the streamlined process of production. PT. PMJ is one of the garment industries that produce women's underwear. The total processing time in the sewing department often exceeds the standard time set by the company. The composition of the machine and facilities at the sewing department is considered to be not optimal. The order of machines in the production line has not been arranged appropriately which causes the excessive distance in the material transfer. In addition, the uses of straight material flow cause the workers to rotate their posture of the body when taking the materials. Based on the results of the assessment of the condition of workers in the initial facility layout using the Quick Exposure Check (QEC) method, the highest total exposure score is on the back. This study aims to redesign the facility layout of PT. PMJ using Systematic Layout Planning (SLP) and ergonomics approach to minimize total material handling cost. Two design alternatives are proposed and the performance of each design is evaluated using ARENA simulation software. Based on the calculation of total material handling cost and simulation, the second proposed facility layout was chosen since it was able to reduce the total material handling cost by 22.92% and material transfer time by 34.01%.</abstract><cop>Abingdon</cop><pub>Cogent</pub><doi>10.1080/23311916.2019.1597412</doi><orcidid>https://orcid.org/0000-0001-7700-3494</orcidid><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2331-1916
ispartof Cogent engineering, 2019-01, Vol.6 (1)
issn 2331-1916
2331-1916
language eng
recordid cdi_crossref_primary_10_1080_23311916_2019_1597412
source Taylor & Francis Open Access; DOAJ Directory of Open Access Journals; Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals
subjects ARENA
Ergonomics
Facilities management
facility layout
Layouts
Materials handling
Quick exposure check
Redesign
Sewing
Systematic layout planning
Underwear
title Facility layout improvement in sewing department with Systematic Layout planning and ergonomics approach
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T04%3A07%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Facility%20layout%20improvement%20in%20sewing%20department%20with%20Systematic%20Layout%20planning%20and%20ergonomics%20approach&rft.jtitle=Cogent%20engineering&rft.au=Suhardi,%20Bambang&rft.date=2019-01-01&rft.volume=6&rft.issue=1&rft.issn=2331-1916&rft.eissn=2331-1916&rft_id=info:doi/10.1080/23311916.2019.1597412&rft_dat=%3Cproquest_cross%3E2352087257%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2352087257&rft_id=info:pmid/&rft_doaj_id=oai_doaj_org_article_9f45e99acf2e4e21a317b15dee3b9049&rfr_iscdi=true