Dispatching for order-driven FABs with backward pegging
In this paper, a two-stage dispatching rule for the on-time delivery of an order-driven FAB is presented. Dispatching rules have a significant impact on the performance of FABs. Consequently, many such rules have been created, such as first in first out, earliest due data, operation due date, and cr...
Gespeichert in:
Veröffentlicht in: | Cogent engineering 2016-12, Vol.3 (1), p.1226460 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 1 |
container_start_page | 1226460 |
container_title | Cogent engineering |
container_volume | 3 |
creator | Chung, Yong H. Lee, S. Park, Sang C. |
description | In this paper, a two-stage dispatching rule for the on-time delivery of an order-driven FAB is presented. Dispatching rules have a significant impact on the performance of FABs. Consequently, many such rules have been created, such as first in first out, earliest due data, operation due date, and critical ratio. Because these conventional dispatching rules make decisions only by considering the due date of each lot, they might not be suitable for dynamic order-driven FABs, for which it is very essential to monitor not only the due date of each lot but also the production rate of each step. In the first stage of the proposed two-stage dispatching rule, the production rate of each step is taken into account, and the due date of each lot is considered in the second stage. In this paper, the production rates of steps are computed by combining forward simulation and backward pegging. A simulation model, based on a wafer FAB data-set, has been developed, and simulation is conducted using commercial software SEEPLAN
®
. The simulation results clearly show the advantages of the proposed dispatching rule over existing rules. |
doi_str_mv | 10.1080/23311916.2016.1226460 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_23311916_2016_1226460</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><doaj_id>oai_doaj_org_article_a3844531f28a42e29b0edd51d560fdba</doaj_id><sourcerecordid>4313625151</sourcerecordid><originalsourceid>FETCH-LOGICAL-c451t-4ac3154567accb7833e0bbeb0aea6a0e3bcf2a29d272c59489dba217e1dd0f63</originalsourceid><addsrcrecordid>eNp9kE1PAjEQhhujiQT5CSabeF6cfu3HTURREhIv3JvZtgtF2GK7SPj3LoLGk5e2eTvzzOQh5JbCkEIB94xzSkuaDRl0B2UsExlckN4xT48fl3_e12QQ4woAKBcSSuiR_MnFLbZ66ZpFUvuQ-GBsSE1wn7ZJJqPHmOxdu0wq1O97DCbZ2sWiq70hVzWuox2c7z6ZT57n49d09vYyHY9mqRaStqlAzakUMstR6yovOLdQVbYCtJghWF7pmiErDcuZlqUoSlMho7mlxkCd8T6ZnrDG40ptg9tgOCiPTn0HPiwUhtbptVXICyEkpzUrUDDLygqsMZIamUHdUTvW3Ym1Df5jZ2OrVn4Xmm57RYssL4uSdl76RJ6qdPAxBlv_TqWgjsbVj3F1NK7Oxru-h1OfazqNG9z7sDaqxcPahzpgo11U_H_EF_WJhfk</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1867989101</pqid></control><display><type>article</type><title>Dispatching for order-driven FABs with backward pegging</title><source>Taylor & Francis Open Access</source><source>DOAJ Directory of Open Access Journals</source><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Chung, Yong H. ; Lee, S. ; Park, Sang C.</creator><contributor>Zhou, Zude</contributor><creatorcontrib>Chung, Yong H. ; Lee, S. ; Park, Sang C. ; Zhou, Zude</creatorcontrib><description>In this paper, a two-stage dispatching rule for the on-time delivery of an order-driven FAB is presented. Dispatching rules have a significant impact on the performance of FABs. Consequently, many such rules have been created, such as first in first out, earliest due data, operation due date, and critical ratio. Because these conventional dispatching rules make decisions only by considering the due date of each lot, they might not be suitable for dynamic order-driven FABs, for which it is very essential to monitor not only the due date of each lot but also the production rate of each step. In the first stage of the proposed two-stage dispatching rule, the production rate of each step is taken into account, and the due date of each lot is considered in the second stage. In this paper, the production rates of steps are computed by combining forward simulation and backward pegging. A simulation model, based on a wafer FAB data-set, has been developed, and simulation is conducted using commercial software SEEPLAN
®
. The simulation results clearly show the advantages of the proposed dispatching rule over existing rules.</description><identifier>ISSN: 2331-1916</identifier><identifier>EISSN: 2331-1916</identifier><identifier>DOI: 10.1080/23311916.2016.1226460</identifier><language>eng</language><publisher>Abingdon: Cogent</publisher><subject>Dispatching rules ; FAB ; on-time delivery ; pegging ; Simulation ; two-stage dispatching rule</subject><ispartof>Cogent engineering, 2016-12, Vol.3 (1), p.1226460</ispartof><rights>2016 The Author(s). This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license 2016</rights><rights>2016 The Author(s). This open access article is distributed under a Creative Commons Attribution (CC-BY) 4.0 license. This work is licensed under the Creative Commons Attribution License http://creativecommons.org/licenses/by/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c451t-4ac3154567accb7833e0bbeb0aea6a0e3bcf2a29d272c59489dba217e1dd0f63</citedby><cites>FETCH-LOGICAL-c451t-4ac3154567accb7833e0bbeb0aea6a0e3bcf2a29d272c59489dba217e1dd0f63</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.tandfonline.com/doi/pdf/10.1080/23311916.2016.1226460$$EPDF$$P50$$Ginformaworld$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://www.tandfonline.com/doi/full/10.1080/23311916.2016.1226460$$EHTML$$P50$$Ginformaworld$$Hfree_for_read</linktohtml><link.rule.ids>315,781,785,865,2103,27504,27926,27927,59145,59146</link.rule.ids></links><search><contributor>Zhou, Zude</contributor><creatorcontrib>Chung, Yong H.</creatorcontrib><creatorcontrib>Lee, S.</creatorcontrib><creatorcontrib>Park, Sang C.</creatorcontrib><title>Dispatching for order-driven FABs with backward pegging</title><title>Cogent engineering</title><description>In this paper, a two-stage dispatching rule for the on-time delivery of an order-driven FAB is presented. Dispatching rules have a significant impact on the performance of FABs. Consequently, many such rules have been created, such as first in first out, earliest due data, operation due date, and critical ratio. Because these conventional dispatching rules make decisions only by considering the due date of each lot, they might not be suitable for dynamic order-driven FABs, for which it is very essential to monitor not only the due date of each lot but also the production rate of each step. In the first stage of the proposed two-stage dispatching rule, the production rate of each step is taken into account, and the due date of each lot is considered in the second stage. In this paper, the production rates of steps are computed by combining forward simulation and backward pegging. A simulation model, based on a wafer FAB data-set, has been developed, and simulation is conducted using commercial software SEEPLAN
®
. The simulation results clearly show the advantages of the proposed dispatching rule over existing rules.</description><subject>Dispatching rules</subject><subject>FAB</subject><subject>on-time delivery</subject><subject>pegging</subject><subject>Simulation</subject><subject>two-stage dispatching rule</subject><issn>2331-1916</issn><issn>2331-1916</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><sourceid>0YH</sourceid><sourceid>ABUWG</sourceid><sourceid>AFKRA</sourceid><sourceid>AZQEC</sourceid><sourceid>BENPR</sourceid><sourceid>CCPQU</sourceid><sourceid>DWQXO</sourceid><sourceid>DOA</sourceid><recordid>eNp9kE1PAjEQhhujiQT5CSabeF6cfu3HTURREhIv3JvZtgtF2GK7SPj3LoLGk5e2eTvzzOQh5JbCkEIB94xzSkuaDRl0B2UsExlckN4xT48fl3_e12QQ4woAKBcSSuiR_MnFLbZ66ZpFUvuQ-GBsSE1wn7ZJJqPHmOxdu0wq1O97DCbZ2sWiq70hVzWuox2c7z6ZT57n49d09vYyHY9mqRaStqlAzakUMstR6yovOLdQVbYCtJghWF7pmiErDcuZlqUoSlMho7mlxkCd8T6ZnrDG40ptg9tgOCiPTn0HPiwUhtbptVXICyEkpzUrUDDLygqsMZIamUHdUTvW3Ym1Df5jZ2OrVn4Xmm57RYssL4uSdl76RJ6qdPAxBlv_TqWgjsbVj3F1NK7Oxru-h1OfazqNG9z7sDaqxcPahzpgo11U_H_EF_WJhfk</recordid><startdate>20161231</startdate><enddate>20161231</enddate><creator>Chung, Yong H.</creator><creator>Lee, S.</creator><creator>Park, Sang C.</creator><general>Cogent</general><general>Taylor & Francis Ltd</general><general>Taylor & Francis Group</general><scope>0YH</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>HCIFZ</scope><scope>L6V</scope><scope>M7S</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope><scope>DOA</scope></search><sort><creationdate>20161231</creationdate><title>Dispatching for order-driven FABs with backward pegging</title><author>Chung, Yong H. ; Lee, S. ; Park, Sang C.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c451t-4ac3154567accb7833e0bbeb0aea6a0e3bcf2a29d272c59489dba217e1dd0f63</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>Dispatching rules</topic><topic>FAB</topic><topic>on-time delivery</topic><topic>pegging</topic><topic>Simulation</topic><topic>two-stage dispatching rule</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Chung, Yong H.</creatorcontrib><creatorcontrib>Lee, S.</creatorcontrib><creatorcontrib>Park, Sang C.</creatorcontrib><collection>Taylor & Francis Open Access</collection><collection>CrossRef</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central Korea</collection><collection>SciTech Premium Collection</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>Access via ProQuest (Open Access)</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering Collection</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Cogent engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Chung, Yong H.</au><au>Lee, S.</au><au>Park, Sang C.</au><au>Zhou, Zude</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Dispatching for order-driven FABs with backward pegging</atitle><jtitle>Cogent engineering</jtitle><date>2016-12-31</date><risdate>2016</risdate><volume>3</volume><issue>1</issue><spage>1226460</spage><pages>1226460-</pages><issn>2331-1916</issn><eissn>2331-1916</eissn><abstract>In this paper, a two-stage dispatching rule for the on-time delivery of an order-driven FAB is presented. Dispatching rules have a significant impact on the performance of FABs. Consequently, many such rules have been created, such as first in first out, earliest due data, operation due date, and critical ratio. Because these conventional dispatching rules make decisions only by considering the due date of each lot, they might not be suitable for dynamic order-driven FABs, for which it is very essential to monitor not only the due date of each lot but also the production rate of each step. In the first stage of the proposed two-stage dispatching rule, the production rate of each step is taken into account, and the due date of each lot is considered in the second stage. In this paper, the production rates of steps are computed by combining forward simulation and backward pegging. A simulation model, based on a wafer FAB data-set, has been developed, and simulation is conducted using commercial software SEEPLAN
®
. The simulation results clearly show the advantages of the proposed dispatching rule over existing rules.</abstract><cop>Abingdon</cop><pub>Cogent</pub><doi>10.1080/23311916.2016.1226460</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2331-1916 |
ispartof | Cogent engineering, 2016-12, Vol.3 (1), p.1226460 |
issn | 2331-1916 2331-1916 |
language | eng |
recordid | cdi_crossref_primary_10_1080_23311916_2016_1226460 |
source | Taylor & Francis Open Access; DOAJ Directory of Open Access Journals; Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals |
subjects | Dispatching rules FAB on-time delivery pegging Simulation two-stage dispatching rule |
title | Dispatching for order-driven FABs with backward pegging |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-18T05%3A07%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Dispatching%20for%20order-driven%20FABs%20with%20backward%20pegging&rft.jtitle=Cogent%20engineering&rft.au=Chung,%20Yong%20H.&rft.date=2016-12-31&rft.volume=3&rft.issue=1&rft.spage=1226460&rft.pages=1226460-&rft.issn=2331-1916&rft.eissn=2331-1916&rft_id=info:doi/10.1080/23311916.2016.1226460&rft_dat=%3Cproquest_cross%3E4313625151%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1867989101&rft_id=info:pmid/&rft_doaj_id=oai_doaj_org_article_a3844531f28a42e29b0edd51d560fdba&rfr_iscdi=true |