Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles
Sequence-dependent setup times cause a trade-off between output rate, WIP and fluctuating throughput times. Companies usually face this trade-off by bundling similar orders in setup families without quantifying its impact on the logistic objectives. This paper presents a simple model to quantify the...
Gespeichert in:
Veröffentlicht in: | Production planning & control 2022-01, Vol.33 (1), p.84-100 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 100 |
---|---|
container_issue | 1 |
container_start_page | 84 |
container_title | Production planning & control |
container_volume | 33 |
creator | Engehausen, Friederike Lödding, Hermann |
description | Sequence-dependent setup times cause a trade-off between output rate, WIP and fluctuating throughput times. Companies usually face this trade-off by bundling similar orders in setup families without quantifying its impact on the logistic objectives. This paper presents a simple model to quantify the influence of setup-optimised sequencing on the output rate, WIP and throughput times. On the one hand, the aim is to create a deeper understanding for the consequences of setup-optimised sequencing. On the other hand, companies are enabled to actively manage and position in the trade-off between the conflicting targets. |
doi_str_mv | 10.1080/09537287.2020.1822642 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_09537287_2020_1822642</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2770814615</sourcerecordid><originalsourceid>FETCH-LOGICAL-c385t-a9223d188da036522671c713d38e6d51f312240a1d56186cbdb96387aac9d7903</originalsourceid><addsrcrecordid>eNp9kMtKAzEUhoMoWKuPIATcOjWXTpLZKeINFF1UXIY0OdOOTJMxySB9Ax_bGVq3rg4cvvMd_h-hc0pmlChyRaqSS6bkjBE2rBRjYs4O0IRyIYpSSXqIJiNTjNAxOknpkxDCqKgm6OfFeLNq_Aon-OrBWygcdOAd-Dysct_h3Gwg4QIv1oCziSvI2AZft43NeAn5G8Dj0OeuzziaDJf44-kNG-9w3fY29yaP9ryOoV-tR2jnq0Pc--3WtpBO0VFt2gRn-zlF7_d3i9vH4vn14en25rmwXJW5MBVj3FGlnCFclENUSa2k3HEFwpW05pSxOTHUlYIqYZduWQmupDG2crIifIoudt4uhiFwyvoz9NEPLzWTkig6F7QcqHJH2RhSilDrLjYbE7eaEj2Wrv9K12Ppel_6cHe9u2v8EHBjvkNsnc5m24ZYR-NtkzT_X_ELueGJ6g</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2770814615</pqid></control><display><type>article</type><title>Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles</title><source>Taylor & Francis:Master (3349 titles)</source><creator>Engehausen, Friederike ; Lödding, Hermann</creator><creatorcontrib>Engehausen, Friederike ; Lödding, Hermann</creatorcontrib><description>Sequence-dependent setup times cause a trade-off between output rate, WIP and fluctuating throughput times. Companies usually face this trade-off by bundling similar orders in setup families without quantifying its impact on the logistic objectives. This paper presents a simple model to quantify the influence of setup-optimised sequencing on the output rate, WIP and throughput times. On the one hand, the aim is to create a deeper understanding for the consequences of setup-optimised sequencing. On the other hand, companies are enabled to actively manage and position in the trade-off between the conflicting targets.</description><identifier>ISSN: 0953-7287</identifier><identifier>EISSN: 1366-5871</identifier><identifier>DOI: 10.1080/09537287.2020.1822642</identifier><language>eng</language><publisher>London: Taylor & Francis</publisher><subject>Job shop production ; manufacturing control ; sequence-dependent setup times ; sequencing ; Setup times ; setup-optimised sequencing ; Tradeoffs</subject><ispartof>Production planning & control, 2022-01, Vol.33 (1), p.84-100</ispartof><rights>2020 Informa UK Limited, trading as Taylor & Francis Group 2020</rights><rights>2020 Informa UK Limited, trading as Taylor & Francis Group</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c385t-a9223d188da036522671c713d38e6d51f312240a1d56186cbdb96387aac9d7903</citedby><cites>FETCH-LOGICAL-c385t-a9223d188da036522671c713d38e6d51f312240a1d56186cbdb96387aac9d7903</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.tandfonline.com/doi/pdf/10.1080/09537287.2020.1822642$$EPDF$$P50$$Ginformaworld$$H</linktopdf><linktohtml>$$Uhttps://www.tandfonline.com/doi/full/10.1080/09537287.2020.1822642$$EHTML$$P50$$Ginformaworld$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,59647,60436</link.rule.ids></links><search><creatorcontrib>Engehausen, Friederike</creatorcontrib><creatorcontrib>Lödding, Hermann</creatorcontrib><title>Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles</title><title>Production planning & control</title><description>Sequence-dependent setup times cause a trade-off between output rate, WIP and fluctuating throughput times. Companies usually face this trade-off by bundling similar orders in setup families without quantifying its impact on the logistic objectives. This paper presents a simple model to quantify the influence of setup-optimised sequencing on the output rate, WIP and throughput times. On the one hand, the aim is to create a deeper understanding for the consequences of setup-optimised sequencing. On the other hand, companies are enabled to actively manage and position in the trade-off between the conflicting targets.</description><subject>Job shop production</subject><subject>manufacturing control</subject><subject>sequence-dependent setup times</subject><subject>sequencing</subject><subject>Setup times</subject><subject>setup-optimised sequencing</subject><subject>Tradeoffs</subject><issn>0953-7287</issn><issn>1366-5871</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><recordid>eNp9kMtKAzEUhoMoWKuPIATcOjWXTpLZKeINFF1UXIY0OdOOTJMxySB9Ax_bGVq3rg4cvvMd_h-hc0pmlChyRaqSS6bkjBE2rBRjYs4O0IRyIYpSSXqIJiNTjNAxOknpkxDCqKgm6OfFeLNq_Aon-OrBWygcdOAd-Dysct_h3Gwg4QIv1oCziSvI2AZft43NeAn5G8Dj0OeuzziaDJf44-kNG-9w3fY29yaP9ryOoV-tR2jnq0Pc--3WtpBO0VFt2gRn-zlF7_d3i9vH4vn14en25rmwXJW5MBVj3FGlnCFclENUSa2k3HEFwpW05pSxOTHUlYIqYZduWQmupDG2crIifIoudt4uhiFwyvoz9NEPLzWTkig6F7QcqHJH2RhSilDrLjYbE7eaEj2Wrv9K12Ppel_6cHe9u2v8EHBjvkNsnc5m24ZYR-NtkzT_X_ELueGJ6g</recordid><startdate>20220102</startdate><enddate>20220102</enddate><creator>Engehausen, Friederike</creator><creator>Lödding, Hermann</creator><general>Taylor & Francis</general><general>Taylor & Francis LLC</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JQ2</scope></search><sort><creationdate>20220102</creationdate><title>Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles</title><author>Engehausen, Friederike ; Lödding, Hermann</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c385t-a9223d188da036522671c713d38e6d51f312240a1d56186cbdb96387aac9d7903</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>Job shop production</topic><topic>manufacturing control</topic><topic>sequence-dependent setup times</topic><topic>sequencing</topic><topic>Setup times</topic><topic>setup-optimised sequencing</topic><topic>Tradeoffs</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Engehausen, Friederike</creatorcontrib><creatorcontrib>Lödding, Hermann</creatorcontrib><collection>CrossRef</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><jtitle>Production planning & control</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Engehausen, Friederike</au><au>Lödding, Hermann</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles</atitle><jtitle>Production planning & control</jtitle><date>2022-01-02</date><risdate>2022</risdate><volume>33</volume><issue>1</issue><spage>84</spage><epage>100</epage><pages>84-100</pages><issn>0953-7287</issn><eissn>1366-5871</eissn><abstract>Sequence-dependent setup times cause a trade-off between output rate, WIP and fluctuating throughput times. Companies usually face this trade-off by bundling similar orders in setup families without quantifying its impact on the logistic objectives. This paper presents a simple model to quantify the influence of setup-optimised sequencing on the output rate, WIP and throughput times. On the one hand, the aim is to create a deeper understanding for the consequences of setup-optimised sequencing. On the other hand, companies are enabled to actively manage and position in the trade-off between the conflicting targets.</abstract><cop>London</cop><pub>Taylor & Francis</pub><doi>10.1080/09537287.2020.1822642</doi><tpages>17</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0953-7287 |
ispartof | Production planning & control, 2022-01, Vol.33 (1), p.84-100 |
issn | 0953-7287 1366-5871 |
language | eng |
recordid | cdi_crossref_primary_10_1080_09537287_2020_1822642 |
source | Taylor & Francis:Master (3349 titles) |
subjects | Job shop production manufacturing control sequence-dependent setup times sequencing Setup times setup-optimised sequencing Tradeoffs |
title | Managing sequence-dependent setup times - The target conflict between output rate, WIP and fluctuating throughput times for setup cycles |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T09%3A47%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Managing%20sequence-dependent%20setup%20times%20-%20The%20target%20conflict%20between%20output%20rate,%20WIP%20and%20fluctuating%20throughput%20times%20for%20setup%20cycles&rft.jtitle=Production%20planning%20&%20control&rft.au=Engehausen,%20Friederike&rft.date=2022-01-02&rft.volume=33&rft.issue=1&rft.spage=84&rft.epage=100&rft.pages=84-100&rft.issn=0953-7287&rft.eissn=1366-5871&rft_id=info:doi/10.1080/09537287.2020.1822642&rft_dat=%3Cproquest_cross%3E2770814615%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2770814615&rft_id=info:pmid/&rfr_iscdi=true |