Power guidelines for process monitoring

We present a process for designing monitoring procedures that includes practical power guidelines. These guidelines are based upon the average run length (ARL). The specific guideline metric is the ratio of the in-control ARL (ARL ic ) to the out-of-control ARL (ARL oc ). Our recommended design proc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Quality engineering 2023-01, Vol.35 (1), p.130-141
Hauptverfasser: Davis, Darwin J., Lucas, James M., Saniga, Erwin M., Saccucci, Michael S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!