Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown
We address a rescheduling problem of unrelated parallel machines with job-dependent setup times where a machine breakdown is known in advance. Typical rescheduling methods usually re-assign or re-sequence jobs from a given schedule after machines break down. Recently, machine breakdowns can be forec...
Gespeichert in:
Veröffentlicht in: | International journal of production research 2021-09, Vol.59 (17), p.5236-5258 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 5258 |
---|---|
container_issue | 17 |
container_start_page | 5236 |
container_title | International journal of production research |
container_volume | 59 |
creator | Kim, Young-In Kim, Hyun-Jung |
description | We address a rescheduling problem of unrelated parallel machines with job-dependent setup times where a machine breakdown is known in advance. Typical rescheduling methods usually re-assign or re-sequence jobs from a given schedule after machines break down. Recently, machine breakdowns can be forecasted with high accuracy before their actual occurrences from IoT sensors or artificial intelligence methods. We therefore define a new rescheduling problem in which jobs are re-assigned before machine breakdowns occur, and propose a mathematical programming model with three objective measures, makespan, stability and penalty cost. We then develop a simulated annealing (SA) algorithm combined with a fuzzy logic controller for adjusting the parameters in SA. We demonstrate the performance of the proposed algorithm with extensive experiments. |
doi_str_mv | 10.1080/00207543.2020.1775910 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_00207543_2020_1775910</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2564682737</sourcerecordid><originalsourceid>FETCH-LOGICAL-c395t-47b99a120e48b0477d797367dc2a50535b24a5c30630a01df16f97b68aaf56b93</originalsourceid><addsrcrecordid>eNp9kF2L1DAUhoMoOO7uTxACXnfMR5O0d8qiq7CwIC54F06TU6djm9SkZdh_vykzsnfmJuHked4DLyHvOdtz1rCPjAlmVC33ojz23BjVcvaK7LjUulJN8-s12W1MtUFvybucj6wc1dQ7Mv3A7A7o13EIv2ns6RoSjrCgpzMkGEcc6QTuMATM9DQsB3qMXeVxxuAxLDTjss50GabyvZZRon1M6CBvCReRdgnhj4-ncE3e9DBmvLncV-Tx65eft9-q-4e777ef7ysnW7VUtenaFrhgWDcdq43xpjVSG-8EKKak6kQNykmmJQPGfc9135pONwC90l0rr8iHc-6c4t8V82KPcU2hrLRC6Vo3wkhTKHWmXIo5J-ztnIYJ0pPlzG7N2n_N2q1Ze2m2ePTsoYthyC-WMYKXcC0K8umMDKH0McEpptHbBZ7GmPoEwRVN_n_LM3FeivY</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2564682737</pqid></control><display><type>article</type><title>Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown</title><source>Taylor & Francis</source><source>EBSCOhost Business Source Complete</source><creator>Kim, Young-In ; Kim, Hyun-Jung</creator><creatorcontrib>Kim, Young-In ; Kim, Hyun-Jung</creatorcontrib><description>We address a rescheduling problem of unrelated parallel machines with job-dependent setup times where a machine breakdown is known in advance. Typical rescheduling methods usually re-assign or re-sequence jobs from a given schedule after machines break down. Recently, machine breakdowns can be forecasted with high accuracy before their actual occurrences from IoT sensors or artificial intelligence methods. We therefore define a new rescheduling problem in which jobs are re-assigned before machine breakdowns occur, and propose a mathematical programming model with three objective measures, makespan, stability and penalty cost. We then develop a simulated annealing (SA) algorithm combined with a fuzzy logic controller for adjusting the parameters in SA. We demonstrate the performance of the proposed algorithm with extensive experiments.</description><identifier>ISSN: 0020-7543</identifier><identifier>EISSN: 1366-588X</identifier><identifier>DOI: 10.1080/00207543.2020.1775910</identifier><language>eng</language><publisher>London: Taylor & Francis</publisher><subject>Algorithms ; Artificial intelligence ; Breakdown ; Breakdowns ; Fuzzy control ; Fuzzy logic ; fuzzy logic controller ; Job shops ; machine breakdowns ; Mathematical programming ; Rescheduling ; Schedules ; Setup times ; Simulated annealing ; unrelated parallel machines</subject><ispartof>International journal of production research, 2021-09, Vol.59 (17), p.5236-5258</ispartof><rights>2020 Informa UK Limited, trading as Taylor & Francis Group 2020</rights><rights>2020 Informa UK Limited, trading as Taylor & Francis Group</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c395t-47b99a120e48b0477d797367dc2a50535b24a5c30630a01df16f97b68aaf56b93</citedby><cites>FETCH-LOGICAL-c395t-47b99a120e48b0477d797367dc2a50535b24a5c30630a01df16f97b68aaf56b93</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://www.tandfonline.com/doi/pdf/10.1080/00207543.2020.1775910$$EPDF$$P50$$Ginformaworld$$H</linktopdf><linktohtml>$$Uhttps://www.tandfonline.com/doi/full/10.1080/00207543.2020.1775910$$EHTML$$P50$$Ginformaworld$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,59620,60409</link.rule.ids></links><search><creatorcontrib>Kim, Young-In</creatorcontrib><creatorcontrib>Kim, Hyun-Jung</creatorcontrib><title>Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown</title><title>International journal of production research</title><description>We address a rescheduling problem of unrelated parallel machines with job-dependent setup times where a machine breakdown is known in advance. Typical rescheduling methods usually re-assign or re-sequence jobs from a given schedule after machines break down. Recently, machine breakdowns can be forecasted with high accuracy before their actual occurrences from IoT sensors or artificial intelligence methods. We therefore define a new rescheduling problem in which jobs are re-assigned before machine breakdowns occur, and propose a mathematical programming model with three objective measures, makespan, stability and penalty cost. We then develop a simulated annealing (SA) algorithm combined with a fuzzy logic controller for adjusting the parameters in SA. We demonstrate the performance of the proposed algorithm with extensive experiments.</description><subject>Algorithms</subject><subject>Artificial intelligence</subject><subject>Breakdown</subject><subject>Breakdowns</subject><subject>Fuzzy control</subject><subject>Fuzzy logic</subject><subject>fuzzy logic controller</subject><subject>Job shops</subject><subject>machine breakdowns</subject><subject>Mathematical programming</subject><subject>Rescheduling</subject><subject>Schedules</subject><subject>Setup times</subject><subject>Simulated annealing</subject><subject>unrelated parallel machines</subject><issn>0020-7543</issn><issn>1366-588X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNp9kF2L1DAUhoMoOO7uTxACXnfMR5O0d8qiq7CwIC54F06TU6djm9SkZdh_vykzsnfmJuHked4DLyHvOdtz1rCPjAlmVC33ojz23BjVcvaK7LjUulJN8-s12W1MtUFvybucj6wc1dQ7Mv3A7A7o13EIv2ns6RoSjrCgpzMkGEcc6QTuMATM9DQsB3qMXeVxxuAxLDTjss50GabyvZZRon1M6CBvCReRdgnhj4-ncE3e9DBmvLncV-Tx65eft9-q-4e777ef7ysnW7VUtenaFrhgWDcdq43xpjVSG-8EKKak6kQNykmmJQPGfc9135pONwC90l0rr8iHc-6c4t8V82KPcU2hrLRC6Vo3wkhTKHWmXIo5J-ztnIYJ0pPlzG7N2n_N2q1Ze2m2ePTsoYthyC-WMYKXcC0K8umMDKH0McEpptHbBZ7GmPoEwRVN_n_LM3FeivY</recordid><startdate>20210902</startdate><enddate>20210902</enddate><creator>Kim, Young-In</creator><creator>Kim, Hyun-Jung</creator><general>Taylor & Francis</general><general>Taylor & Francis LLC</general><scope>OQ6</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>20210902</creationdate><title>Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown</title><author>Kim, Young-In ; Kim, Hyun-Jung</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c395t-47b99a120e48b0477d797367dc2a50535b24a5c30630a01df16f97b68aaf56b93</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Algorithms</topic><topic>Artificial intelligence</topic><topic>Breakdown</topic><topic>Breakdowns</topic><topic>Fuzzy control</topic><topic>Fuzzy logic</topic><topic>fuzzy logic controller</topic><topic>Job shops</topic><topic>machine breakdowns</topic><topic>Mathematical programming</topic><topic>Rescheduling</topic><topic>Schedules</topic><topic>Setup times</topic><topic>Simulated annealing</topic><topic>unrelated parallel machines</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Kim, Young-In</creatorcontrib><creatorcontrib>Kim, Hyun-Jung</creatorcontrib><collection>ECONIS</collection><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><collection>Engineering Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>International journal of production research</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Kim, Young-In</au><au>Kim, Hyun-Jung</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown</atitle><jtitle>International journal of production research</jtitle><date>2021-09-02</date><risdate>2021</risdate><volume>59</volume><issue>17</issue><spage>5236</spage><epage>5258</epage><pages>5236-5258</pages><issn>0020-7543</issn><eissn>1366-588X</eissn><abstract>We address a rescheduling problem of unrelated parallel machines with job-dependent setup times where a machine breakdown is known in advance. Typical rescheduling methods usually re-assign or re-sequence jobs from a given schedule after machines break down. Recently, machine breakdowns can be forecasted with high accuracy before their actual occurrences from IoT sensors or artificial intelligence methods. We therefore define a new rescheduling problem in which jobs are re-assigned before machine breakdowns occur, and propose a mathematical programming model with three objective measures, makespan, stability and penalty cost. We then develop a simulated annealing (SA) algorithm combined with a fuzzy logic controller for adjusting the parameters in SA. We demonstrate the performance of the proposed algorithm with extensive experiments.</abstract><cop>London</cop><pub>Taylor & Francis</pub><doi>10.1080/00207543.2020.1775910</doi><tpages>23</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0020-7543 |
ispartof | International journal of production research, 2021-09, Vol.59 (17), p.5236-5258 |
issn | 0020-7543 1366-588X |
language | eng |
recordid | cdi_crossref_primary_10_1080_00207543_2020_1775910 |
source | Taylor & Francis; EBSCOhost Business Source Complete |
subjects | Algorithms Artificial intelligence Breakdown Breakdowns Fuzzy control Fuzzy logic fuzzy logic controller Job shops machine breakdowns Mathematical programming Rescheduling Schedules Setup times Simulated annealing unrelated parallel machines |
title | Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T05%3A00%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Rescheduling%20of%20unrelated%20parallel%20machines%20with%20job-dependent%20setup%20times%20under%20forecasted%20machine%20breakdown&rft.jtitle=International%20journal%20of%20production%20research&rft.au=Kim,%20Young-In&rft.date=2021-09-02&rft.volume=59&rft.issue=17&rft.spage=5236&rft.epage=5258&rft.pages=5236-5258&rft.issn=0020-7543&rft.eissn=1366-588X&rft_id=info:doi/10.1080/00207543.2020.1775910&rft_dat=%3Cproquest_cross%3E2564682737%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2564682737&rft_id=info:pmid/&rfr_iscdi=true |