The effective subsidence capacity concept: How to assure that subsidence in the Wadden Sea remains within defined limits?
Subsidence caused by extraction of hydrocarbons and solution salt mining is a sensitive issue in the Netherlands. An extensive legal, technical and organisational framework is in place to ensure a high probability that such subsidence will stay within predefined limits. The key question is: how much...
Gespeichert in:
Veröffentlicht in: | Geologie en mijnbouw 2012-11, Vol.91 (3), p.385-399 |
---|---|
Hauptverfasser: | , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Subsidence caused by extraction of hydrocarbons and solution salt mining is a sensitive issue in the Netherlands. An extensive legal, technical and organisational framework is in place to ensure a high probability that such subsidence will stay within predefined limits. The key question is: how much subsidence is acceptable and at which rate? And: how can it be reliably assured that (future) subsidence will stay within these limits? To address the issue for the Wadden Sea area, the concept of ‘effective subsidence capacity’ is used. To determine the ‘effective subsidence capacity’, the maximum volumetric rate of relative sea-level rise, that can be accommodated in the long term, without environmental harm, is established first. The volume of sediment that can be transported and deposited by nature into the tidal basin where the subsidence is expected, ultimately determines this ‘limit of acceptable average subsidence rate’. The capability of the tidal basins to ‘capture’ sediment over the lunar cycle period of 18.6 years is the overall rate-determining step. Effective subsidence capacity is then the maximum average subsidence rate available for planning of human activities. It is obtained by subtracting the subsidence volume rate ‘consumed’ by natural relative subsidence in the area (sealevel rise plus natural shallow compaction) from the total long-term acceptable subsidence volume rate limit. In the operational procedure for mining companies, six-years-average expectation values of subsidence rates are used to calculate the maximum allowable production rates. This is done under the provision that production will be reduced or halted if the expected or actual subsidence rate (natural + man induced) is likely to exceed the limit of acceptable subsidence. Monitoring and management schemes ensure that predicted (6-year average) and actual (18.6-year average) subsidence rates stay within the limit of acceptable subsidence rate and that no damage is caused to the protected nature. A GPS based early warning system is used for early detection of unexpected behaviour. In support of SSM (State Supervision of Mines, the government regulator), TNO-AGE (an independent government advisory group) applies an independent Bayesian statistical analysis of all data, as they become available, to calculate the probability of scenario's under which future subsidence will exceed the defined limits. It is external to the operator's annual measurement and control loop and ensures |
---|---|
ISSN: | 0016-7746 1573-9708 |
DOI: | 10.1017/S0016774600000512 |