An integrated system for ship construction projects control using risk analysis

The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. T...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval 2013-12, Vol.8 (2), p.87-93
Hauptverfasser: Pires, Floriano C. M., Assis, Luiz Felipe, Rezende, Mauro, Vieira, Claudio L. Baraúna, Botelho, Silvia S. C., Filho, Nelson Duarte
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 93
container_issue 2
container_start_page 87
container_title Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval
container_volume 8
creator Pires, Floriano C. M.
Assis, Luiz Felipe
Rezende, Mauro
Vieira, Claudio L. Baraúna
Botelho, Silvia S. C.
Filho, Nelson Duarte
description The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective. This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.
doi_str_mv 10.1007/BF03449275
format Article
fullrecord <record><control><sourceid>crossref_sprin</sourceid><recordid>TN_cdi_crossref_primary_10_1007_BF03449275</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_1007_BF03449275</sourcerecordid><originalsourceid>FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</originalsourceid><addsrcrecordid>eNptkM1KAzEYRYMoWGo3PkHWymgy-V_WYlUodKPgbshkMmPGNin50kXf3pYKblxduBwul4PQLSUPlBD1-LQkjHNTK3GBJjU1puKKm0s0oVKZihn5eY1mACMhhAqmmDYTtJ5HHGLxQ7bFdxgOUPwW9ylj-Ao77FKEkveuhBTxLqfRuwKntuS0wXsIccA5wDe20W4OEOAGXfV2A372m1P0sXx-X7xWq_XL22K-qhzlVFSeaGetEXXfK8E9bbW0dcdkV2vGpJCt7gw3grCWeqm0pFQ7zqlkreq62jE2RXfnXZcTQPZ9s8tha_OhoaQ52Wj-bBzh-zMMRygOPjdj2ufjY_iP_gGHN1-Z</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>An integrated system for ship construction projects control using risk analysis</title><source>SpringerLink Journals - AutoHoldings</source><creator>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</creator><creatorcontrib>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</creatorcontrib><description>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective. This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</description><identifier>ISSN: 1679-396X</identifier><identifier>EISSN: 2199-4749</identifier><identifier>DOI: 10.1007/BF03449275</identifier><language>eng</language><publisher>Cham: Springer International Publishing</publisher><subject>Engineering ; Offshore Engineering</subject><ispartof>Marine systems &amp; ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval, 2013-12, Vol.8 (2), p.87-93</ispartof><rights>Sociedade Brasileira de Engenharia Naval 2013</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/BF03449275$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/BF03449275$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,780,784,27923,27924,41487,42556,51318</link.rule.ids></links><search><creatorcontrib>Pires, Floriano C. M.</creatorcontrib><creatorcontrib>Assis, Luiz Felipe</creatorcontrib><creatorcontrib>Rezende, Mauro</creatorcontrib><creatorcontrib>Vieira, Claudio L. Baraúna</creatorcontrib><creatorcontrib>Botelho, Silvia S. C.</creatorcontrib><creatorcontrib>Filho, Nelson Duarte</creatorcontrib><title>An integrated system for ship construction projects control using risk analysis</title><title>Marine systems &amp; ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</title><addtitle>Mar. Syst. Ocean Technol</addtitle><description>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective. This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</description><subject>Engineering</subject><subject>Offshore Engineering</subject><issn>1679-396X</issn><issn>2199-4749</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2013</creationdate><recordtype>article</recordtype><recordid>eNptkM1KAzEYRYMoWGo3PkHWymgy-V_WYlUodKPgbshkMmPGNin50kXf3pYKblxduBwul4PQLSUPlBD1-LQkjHNTK3GBJjU1puKKm0s0oVKZihn5eY1mACMhhAqmmDYTtJ5HHGLxQ7bFdxgOUPwW9ylj-Ao77FKEkveuhBTxLqfRuwKntuS0wXsIccA5wDe20W4OEOAGXfV2A372m1P0sXx-X7xWq_XL22K-qhzlVFSeaGetEXXfK8E9bbW0dcdkV2vGpJCt7gw3grCWeqm0pFQ7zqlkreq62jE2RXfnXZcTQPZ9s8tha_OhoaQ52Wj-bBzh-zMMRygOPjdj2ufjY_iP_gGHN1-Z</recordid><startdate>20131201</startdate><enddate>20131201</enddate><creator>Pires, Floriano C. M.</creator><creator>Assis, Luiz Felipe</creator><creator>Rezende, Mauro</creator><creator>Vieira, Claudio L. Baraúna</creator><creator>Botelho, Silvia S. C.</creator><creator>Filho, Nelson Duarte</creator><general>Springer International Publishing</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20131201</creationdate><title>An integrated system for ship construction projects control using risk analysis</title><author>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Engineering</topic><topic>Offshore Engineering</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Pires, Floriano C. M.</creatorcontrib><creatorcontrib>Assis, Luiz Felipe</creatorcontrib><creatorcontrib>Rezende, Mauro</creatorcontrib><creatorcontrib>Vieira, Claudio L. Baraúna</creatorcontrib><creatorcontrib>Botelho, Silvia S. C.</creatorcontrib><creatorcontrib>Filho, Nelson Duarte</creatorcontrib><collection>CrossRef</collection><jtitle>Marine systems &amp; ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Pires, Floriano C. M.</au><au>Assis, Luiz Felipe</au><au>Rezende, Mauro</au><au>Vieira, Claudio L. Baraúna</au><au>Botelho, Silvia S. C.</au><au>Filho, Nelson Duarte</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>An integrated system for ship construction projects control using risk analysis</atitle><jtitle>Marine systems &amp; ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</jtitle><stitle>Mar. Syst. Ocean Technol</stitle><date>2013-12-01</date><risdate>2013</risdate><volume>8</volume><issue>2</issue><spage>87</spage><epage>93</epage><pages>87-93</pages><issn>1679-396X</issn><eissn>2199-4749</eissn><abstract>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective. This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</abstract><cop>Cham</cop><pub>Springer International Publishing</pub><doi>10.1007/BF03449275</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1679-396X
ispartof Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval, 2013-12, Vol.8 (2), p.87-93
issn 1679-396X
2199-4749
language eng
recordid cdi_crossref_primary_10_1007_BF03449275
source SpringerLink Journals - AutoHoldings
subjects Engineering
Offshore Engineering
title An integrated system for ship construction projects control using risk analysis
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T06%3A48%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_sprin&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=An%20integrated%20system%20for%20ship%20construction%20projects%20control%20using%20risk%20analysis&rft.jtitle=Marine%20systems%20&%20ocean%20technology%20:%20journal%20of%20SOBENA--Sociedade%20Brasileira%20de%20Engenharia%20Naval&rft.au=Pires,%20Floriano%20C.%20M.&rft.date=2013-12-01&rft.volume=8&rft.issue=2&rft.spage=87&rft.epage=93&rft.pages=87-93&rft.issn=1679-396X&rft.eissn=2199-4749&rft_id=info:doi/10.1007/BF03449275&rft_dat=%3Ccrossref_sprin%3E10_1007_BF03449275%3C/crossref_sprin%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true