An integrated system for ship construction projects control using risk analysis
The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical. T...
Gespeichert in:
Veröffentlicht in: | Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval 2013-12, Vol.8 (2), p.87-93 |
---|---|
Hauptverfasser: | , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 93 |
---|---|
container_issue | 2 |
container_start_page | 87 |
container_title | Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval |
container_volume | 8 |
creator | Pires, Floriano C. M. Assis, Luiz Felipe Rezende, Mauro Vieira, Claudio L. Baraúna Botelho, Silvia S. C. Filho, Nelson Duarte |
description | The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical.
The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective.
This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment. |
doi_str_mv | 10.1007/BF03449275 |
format | Article |
fullrecord | <record><control><sourceid>crossref_sprin</sourceid><recordid>TN_cdi_crossref_primary_10_1007_BF03449275</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>10_1007_BF03449275</sourcerecordid><originalsourceid>FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</originalsourceid><addsrcrecordid>eNptkM1KAzEYRYMoWGo3PkHWymgy-V_WYlUodKPgbshkMmPGNin50kXf3pYKblxduBwul4PQLSUPlBD1-LQkjHNTK3GBJjU1puKKm0s0oVKZihn5eY1mACMhhAqmmDYTtJ5HHGLxQ7bFdxgOUPwW9ylj-Ao77FKEkveuhBTxLqfRuwKntuS0wXsIccA5wDe20W4OEOAGXfV2A372m1P0sXx-X7xWq_XL22K-qhzlVFSeaGetEXXfK8E9bbW0dcdkV2vGpJCt7gw3grCWeqm0pFQ7zqlkreq62jE2RXfnXZcTQPZ9s8tha_OhoaQ52Wj-bBzh-zMMRygOPjdj2ufjY_iP_gGHN1-Z</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>An integrated system for ship construction projects control using risk analysis</title><source>SpringerLink Journals - AutoHoldings</source><creator>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</creator><creatorcontrib>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</creatorcontrib><description>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical.
The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective.
This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</description><identifier>ISSN: 1679-396X</identifier><identifier>EISSN: 2199-4749</identifier><identifier>DOI: 10.1007/BF03449275</identifier><language>eng</language><publisher>Cham: Springer International Publishing</publisher><subject>Engineering ; Offshore Engineering</subject><ispartof>Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval, 2013-12, Vol.8 (2), p.87-93</ispartof><rights>Sociedade Brasileira de Engenharia Naval 2013</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/BF03449275$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/BF03449275$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,780,784,27923,27924,41487,42556,51318</link.rule.ids></links><search><creatorcontrib>Pires, Floriano C. M.</creatorcontrib><creatorcontrib>Assis, Luiz Felipe</creatorcontrib><creatorcontrib>Rezende, Mauro</creatorcontrib><creatorcontrib>Vieira, Claudio L. Baraúna</creatorcontrib><creatorcontrib>Botelho, Silvia S. C.</creatorcontrib><creatorcontrib>Filho, Nelson Duarte</creatorcontrib><title>An integrated system for ship construction projects control using risk analysis</title><title>Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</title><addtitle>Mar. Syst. Ocean Technol</addtitle><description>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical.
The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective.
This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</description><subject>Engineering</subject><subject>Offshore Engineering</subject><issn>1679-396X</issn><issn>2199-4749</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2013</creationdate><recordtype>article</recordtype><recordid>eNptkM1KAzEYRYMoWGo3PkHWymgy-V_WYlUodKPgbshkMmPGNin50kXf3pYKblxduBwul4PQLSUPlBD1-LQkjHNTK3GBJjU1puKKm0s0oVKZihn5eY1mACMhhAqmmDYTtJ5HHGLxQ7bFdxgOUPwW9ylj-Ao77FKEkveuhBTxLqfRuwKntuS0wXsIccA5wDe20W4OEOAGXfV2A372m1P0sXx-X7xWq_XL22K-qhzlVFSeaGetEXXfK8E9bbW0dcdkV2vGpJCt7gw3grCWeqm0pFQ7zqlkreq62jE2RXfnXZcTQPZ9s8tha_OhoaQ52Wj-bBzh-zMMRygOPjdj2ufjY_iP_gGHN1-Z</recordid><startdate>20131201</startdate><enddate>20131201</enddate><creator>Pires, Floriano C. M.</creator><creator>Assis, Luiz Felipe</creator><creator>Rezende, Mauro</creator><creator>Vieira, Claudio L. Baraúna</creator><creator>Botelho, Silvia S. C.</creator><creator>Filho, Nelson Duarte</creator><general>Springer International Publishing</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20131201</creationdate><title>An integrated system for ship construction projects control using risk analysis</title><author>Pires, Floriano C. M. ; Assis, Luiz Felipe ; Rezende, Mauro ; Vieira, Claudio L. Baraúna ; Botelho, Silvia S. C. ; Filho, Nelson Duarte</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c1415-e08caa952ff754e1b86a2d36d2833656b8d949503b1e6786118c44163b7dd2c33</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Engineering</topic><topic>Offshore Engineering</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Pires, Floriano C. M.</creatorcontrib><creatorcontrib>Assis, Luiz Felipe</creatorcontrib><creatorcontrib>Rezende, Mauro</creatorcontrib><creatorcontrib>Vieira, Claudio L. Baraúna</creatorcontrib><creatorcontrib>Botelho, Silvia S. C.</creatorcontrib><creatorcontrib>Filho, Nelson Duarte</creatorcontrib><collection>CrossRef</collection><jtitle>Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Pires, Floriano C. M.</au><au>Assis, Luiz Felipe</au><au>Rezende, Mauro</au><au>Vieira, Claudio L. Baraúna</au><au>Botelho, Silvia S. C.</au><au>Filho, Nelson Duarte</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>An integrated system for ship construction projects control using risk analysis</atitle><jtitle>Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval</jtitle><stitle>Mar. Syst. Ocean Technol</stitle><date>2013-12-01</date><risdate>2013</risdate><volume>8</volume><issue>2</issue><spage>87</spage><epage>93</epage><pages>87-93</pages><issn>1679-396X</issn><eissn>2199-4749</eissn><abstract>The Brazilian shipbuilding industry is presently showing significant recovery prospects. However, there are some problems affecting this process. The high level of builder’s risk perceived by the owners and, mainly, by banks, insurance companies and other stakeholders, is likely the most critical.
The main instrument to keep the risk in acceptable levels is a strict control of the construction progress. However, some shipowners have been employing control systems that are excessively complex, detailed and expensive, but, at same time, not sufficiently effective.
This paper presents the main characteristics of a computer system developed to provide a broad control over the construction progress and financial balance as well as a continuous risk assessment.</abstract><cop>Cham</cop><pub>Springer International Publishing</pub><doi>10.1007/BF03449275</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1679-396X |
ispartof | Marine systems & ocean technology : journal of SOBENA--Sociedade Brasileira de Engenharia Naval, 2013-12, Vol.8 (2), p.87-93 |
issn | 1679-396X 2199-4749 |
language | eng |
recordid | cdi_crossref_primary_10_1007_BF03449275 |
source | SpringerLink Journals - AutoHoldings |
subjects | Engineering Offshore Engineering |
title | An integrated system for ship construction projects control using risk analysis |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-13T06%3A48%3A13IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-crossref_sprin&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=An%20integrated%20system%20for%20ship%20construction%20projects%20control%20using%20risk%20analysis&rft.jtitle=Marine%20systems%20&%20ocean%20technology%20:%20journal%20of%20SOBENA--Sociedade%20Brasileira%20de%20Engenharia%20Naval&rft.au=Pires,%20Floriano%20C.%20M.&rft.date=2013-12-01&rft.volume=8&rft.issue=2&rft.spage=87&rft.epage=93&rft.pages=87-93&rft.issn=1679-396X&rft.eissn=2199-4749&rft_id=info:doi/10.1007/BF03449275&rft_dat=%3Ccrossref_sprin%3E10_1007_BF03449275%3C/crossref_sprin%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |