Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops

Preemptive scheduling in open shops and flow shops so as to minimize the mean flow time are both known to be strongly NP-hard on three or more machines. However, their complexity on two machines remained open for more than a decade. In this paper we show that open shop is NP-hard in the ordinary sen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of algorithms 1993, Vol.14 (1), p.24-44
Hauptverfasser: Du, J.Z., Leung, J.Y.T.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!