Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops
Preemptive scheduling in open shops and flow shops so as to minimize the mean flow time are both known to be strongly NP-hard on three or more machines. However, their complexity on two machines remained open for more than a decade. In this paper we show that open shop is NP-hard in the ordinary sen...
Gespeichert in:
Veröffentlicht in: | Journal of algorithms 1993, Vol.14 (1), p.24-44 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!