ImprovAbility™ guidelines for low-maturity organizations

Too many improvement and innovation projects fail. We have studied the characteristics of successful and failed projects. From this study, we derived 20 parameters that influence success and failure. We used the parameters to build the ImprovAbility Model, which is a model that can be used to measur...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Software process improvement and practice 2008-07, Vol.13 (4), p.319-325
Hauptverfasser: Christiansen, Mads, Johansen, Jørn
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 325
container_issue 4
container_start_page 319
container_title Software process improvement and practice
container_volume 13
creator Christiansen, Mads
Johansen, Jørn
description Too many improvement and innovation projects fail. We have studied the characteristics of successful and failed projects. From this study, we derived 20 parameters that influence success and failure. We used the parameters to build the ImprovAbility Model, which is a model that can be used to measure an organization's or a project's ability to succeed with improvement. In this article, we elaborate on selected parameters that have been shown to be important and/or difficult, particularly in low‐maturity organizations. Copyright © 2008 John Wiley & Sons, Ltd.
doi_str_mv 10.1002/spip.393
format Article
fullrecord <record><control><sourceid>wiley_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1002_spip_393</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>SPIP393</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2183-4c239cec8d8913a4ee103627e17093d4fb77a327cf133fc27139017ffdf6b5d93</originalsourceid><addsrcrecordid>eNp1j81KAzEUhYMoWKvgI8zSTWru3Olk4q4WWwtFK_6Bm5BmkhKddoZkaq1rn8RH80mcUhFcyF2cC-fjwEfIMbAOMBafhspVHRS4Q1rAhKCQcra7-TmnSZam--QghGfGoLm0Rc5G88qXr72pK1y9_vr4jGZLl5vCLUyIbOmjolzRuaqXvqmj0s_Uwr2r2pWLcEj2rCqCOfrJNrkfXNz1L-n4ejjq98ZUx5AhTXSMQhud5ZkAVIkxwDCNuQHOBOaJnXKuMObaAqLVMQcUDLi1uU2n3Vxgm5xsd7UvQ_DGysq7ufJrCUxunOXGWTbODUq36MoVZv0vJ28no8kf3oXavP3yyr_IlCPvyseroYQHAWJ4cy6f8BuRV2lp</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>ImprovAbility™ guidelines for low-maturity organizations</title><source>Alma/SFX Local Collection</source><creator>Christiansen, Mads ; Johansen, Jørn</creator><creatorcontrib>Christiansen, Mads ; Johansen, Jørn</creatorcontrib><description>Too many improvement and innovation projects fail. We have studied the characteristics of successful and failed projects. From this study, we derived 20 parameters that influence success and failure. We used the parameters to build the ImprovAbility Model, which is a model that can be used to measure an organization's or a project's ability to succeed with improvement. In this article, we elaborate on selected parameters that have been shown to be important and/or difficult, particularly in low‐maturity organizations. Copyright © 2008 John Wiley &amp; Sons, Ltd.</description><identifier>ISSN: 1077-4866</identifier><identifier>EISSN: 1099-1670</identifier><identifier>DOI: 10.1002/spip.393</identifier><language>eng</language><publisher>Chichester, UK: John Wiley &amp; Sons, Ltd</publisher><subject>ImprovAbility ; maturity according to CMMI and ISO 15504 ; process improvement ; successful projects</subject><ispartof>Software process improvement and practice, 2008-07, Vol.13 (4), p.319-325</ispartof><rights>Copyright © 2008 John Wiley &amp; Sons, Ltd.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c2183-4c239cec8d8913a4ee103627e17093d4fb77a327cf133fc27139017ffdf6b5d93</citedby><cites>FETCH-LOGICAL-c2183-4c239cec8d8913a4ee103627e17093d4fb77a327cf133fc27139017ffdf6b5d93</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Christiansen, Mads</creatorcontrib><creatorcontrib>Johansen, Jørn</creatorcontrib><title>ImprovAbility™ guidelines for low-maturity organizations</title><title>Software process improvement and practice</title><addtitle>Softw. Process: Improve. Pract</addtitle><description>Too many improvement and innovation projects fail. We have studied the characteristics of successful and failed projects. From this study, we derived 20 parameters that influence success and failure. We used the parameters to build the ImprovAbility Model, which is a model that can be used to measure an organization's or a project's ability to succeed with improvement. In this article, we elaborate on selected parameters that have been shown to be important and/or difficult, particularly in low‐maturity organizations. Copyright © 2008 John Wiley &amp; Sons, Ltd.</description><subject>ImprovAbility</subject><subject>maturity according to CMMI and ISO 15504</subject><subject>process improvement</subject><subject>successful projects</subject><issn>1077-4866</issn><issn>1099-1670</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2008</creationdate><recordtype>article</recordtype><recordid>eNp1j81KAzEUhYMoWKvgI8zSTWru3Olk4q4WWwtFK_6Bm5BmkhKddoZkaq1rn8RH80mcUhFcyF2cC-fjwEfIMbAOMBafhspVHRS4Q1rAhKCQcra7-TmnSZam--QghGfGoLm0Rc5G88qXr72pK1y9_vr4jGZLl5vCLUyIbOmjolzRuaqXvqmj0s_Uwr2r2pWLcEj2rCqCOfrJNrkfXNz1L-n4ejjq98ZUx5AhTXSMQhud5ZkAVIkxwDCNuQHOBOaJnXKuMObaAqLVMQcUDLi1uU2n3Vxgm5xsd7UvQ_DGysq7ufJrCUxunOXGWTbODUq36MoVZv0vJ28no8kf3oXavP3yyr_IlCPvyseroYQHAWJ4cy6f8BuRV2lp</recordid><startdate>200807</startdate><enddate>200807</enddate><creator>Christiansen, Mads</creator><creator>Johansen, Jørn</creator><general>John Wiley &amp; Sons, Ltd</general><scope>BSCLL</scope><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>200807</creationdate><title>ImprovAbility™ guidelines for low-maturity organizations</title><author>Christiansen, Mads ; Johansen, Jørn</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2183-4c239cec8d8913a4ee103627e17093d4fb77a327cf133fc27139017ffdf6b5d93</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2008</creationdate><topic>ImprovAbility</topic><topic>maturity according to CMMI and ISO 15504</topic><topic>process improvement</topic><topic>successful projects</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Christiansen, Mads</creatorcontrib><creatorcontrib>Johansen, Jørn</creatorcontrib><collection>Istex</collection><collection>CrossRef</collection><jtitle>Software process improvement and practice</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Christiansen, Mads</au><au>Johansen, Jørn</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>ImprovAbility™ guidelines for low-maturity organizations</atitle><jtitle>Software process improvement and practice</jtitle><addtitle>Softw. Process: Improve. Pract</addtitle><date>2008-07</date><risdate>2008</risdate><volume>13</volume><issue>4</issue><spage>319</spage><epage>325</epage><pages>319-325</pages><issn>1077-4866</issn><eissn>1099-1670</eissn><abstract>Too many improvement and innovation projects fail. We have studied the characteristics of successful and failed projects. From this study, we derived 20 parameters that influence success and failure. We used the parameters to build the ImprovAbility Model, which is a model that can be used to measure an organization's or a project's ability to succeed with improvement. In this article, we elaborate on selected parameters that have been shown to be important and/or difficult, particularly in low‐maturity organizations. Copyright © 2008 John Wiley &amp; Sons, Ltd.</abstract><cop>Chichester, UK</cop><pub>John Wiley &amp; Sons, Ltd</pub><doi>10.1002/spip.393</doi><tpages>7</tpages></addata></record>
fulltext fulltext
identifier ISSN: 1077-4866
ispartof Software process improvement and practice, 2008-07, Vol.13 (4), p.319-325
issn 1077-4866
1099-1670
language eng
recordid cdi_crossref_primary_10_1002_spip_393
source Alma/SFX Local Collection
subjects ImprovAbility
maturity according to CMMI and ISO 15504
process improvement
successful projects
title ImprovAbility™ guidelines for low-maturity organizations
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-12T15%3A01%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-wiley_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=ImprovAbility%E2%84%A2%20guidelines%20for%20low-maturity%20organizations&rft.jtitle=Software%20process%20improvement%20and%20practice&rft.au=Christiansen,%20Mads&rft.date=2008-07&rft.volume=13&rft.issue=4&rft.spage=319&rft.epage=325&rft.pages=319-325&rft.issn=1077-4866&rft.eissn=1099-1670&rft_id=info:doi/10.1002/spip.393&rft_dat=%3Cwiley_cross%3ESPIP393%3C/wiley_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true