Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development

The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Reksten, Anita, Thomassen, Magnus, Møller-Holst, Steffen, Sundseth, Kyrre
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Reksten, Anita
Thomassen, Magnus
Møller-Holst, Steffen
Sundseth, Kyrre
description The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking into consideration the effects of plant size and expected technology developments. Critical selected data was fitted to a modified power law to describe the cost of an electrolyser plant based on the overall capacity and a learning/technology development rate to derive cost estimations for different PEMEL and AEL plant capacities towards 2030. The analysis predicts that the CAPEX gap between AEL and PEMEL technologies will decrease significantly towards 2030 with plant size until 1–10 MW range. Beyond this, only marginal cost reductions can be expected with CAPEX values approaching 320–400 $/kW for large scale (greater than 100 MW) plants by 2030 with subsequent cost reductions possible. Learning rates for electrolysers were estimated at 25–30% for both AEL and PEMEL, which are significantly higher than the learning rates reported in previous literature.
format Article
fullrecord <record><control><sourceid>cristin_3HK</sourceid><recordid>TN_cdi_cristin_nora_11250_3028531</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>11250_3028531</sourcerecordid><originalsourceid>FETCH-cristin_nora_11250_30285313</originalsourceid><addsrcrecordid>eNqNjj0KwkAQRtNYiHqH8QBCfhAEKwkRGyGFhV1YNpNkdbITdidKPIRnNoqFpdXXvO_xpsEzd3xBLcbWIA1C1UvvEDR7Aa4gz46gbAmKroqMRbgrQQdI48UxDR6d34KCdJdnZ2i5RAJjNfXlW_iLQUfKCnjzwI9RUDeWiesBSrwhcdeilXkwqRR5XHx3Fiz32Sk9rLQzfowsLDtVRFG8DoskjDfrJEr-YV5trU3Z</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development</title><source>NORA - Norwegian Open Research Archives</source><creator>Reksten, Anita ; Thomassen, Magnus ; Møller-Holst, Steffen ; Sundseth, Kyrre</creator><creatorcontrib>Reksten, Anita ; Thomassen, Magnus ; Møller-Holst, Steffen ; Sundseth, Kyrre</creatorcontrib><description>The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking into consideration the effects of plant size and expected technology developments. Critical selected data was fitted to a modified power law to describe the cost of an electrolyser plant based on the overall capacity and a learning/technology development rate to derive cost estimations for different PEMEL and AEL plant capacities towards 2030. The analysis predicts that the CAPEX gap between AEL and PEMEL technologies will decrease significantly towards 2030 with plant size until 1–10 MW range. Beyond this, only marginal cost reductions can be expected with CAPEX values approaching 320–400 $/kW for large scale (greater than 100 MW) plants by 2030 with subsequent cost reductions possible. Learning rates for electrolysers were estimated at 25–30% for both AEL and PEMEL, which are significantly higher than the learning rates reported in previous literature.</description><language>eng</language><publisher>Elsevier</publisher><subject>AEL ; Cost prediction ; PEM ; Water electrolyser</subject><creationdate>2022</creationdate><rights>info:eu-repo/semantics/openAccess</rights><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,776,881,26546</link.rule.ids><linktorsrc>$$Uhttp://hdl.handle.net/11250/3028531$$EView_record_in_NORA$$FView_record_in_$$GNORA$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Reksten, Anita</creatorcontrib><creatorcontrib>Thomassen, Magnus</creatorcontrib><creatorcontrib>Møller-Holst, Steffen</creatorcontrib><creatorcontrib>Sundseth, Kyrre</creatorcontrib><title>Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development</title><description>The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking into consideration the effects of plant size and expected technology developments. Critical selected data was fitted to a modified power law to describe the cost of an electrolyser plant based on the overall capacity and a learning/technology development rate to derive cost estimations for different PEMEL and AEL plant capacities towards 2030. The analysis predicts that the CAPEX gap between AEL and PEMEL technologies will decrease significantly towards 2030 with plant size until 1–10 MW range. Beyond this, only marginal cost reductions can be expected with CAPEX values approaching 320–400 $/kW for large scale (greater than 100 MW) plants by 2030 with subsequent cost reductions possible. Learning rates for electrolysers were estimated at 25–30% for both AEL and PEMEL, which are significantly higher than the learning rates reported in previous literature.</description><subject>AEL</subject><subject>Cost prediction</subject><subject>PEM</subject><subject>Water electrolyser</subject><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>3HK</sourceid><recordid>eNqNjj0KwkAQRtNYiHqH8QBCfhAEKwkRGyGFhV1YNpNkdbITdidKPIRnNoqFpdXXvO_xpsEzd3xBLcbWIA1C1UvvEDR7Aa4gz46gbAmKroqMRbgrQQdI48UxDR6d34KCdJdnZ2i5RAJjNfXlW_iLQUfKCnjzwI9RUDeWiesBSrwhcdeilXkwqRR5XHx3Fiz32Sk9rLQzfowsLDtVRFG8DoskjDfrJEr-YV5trU3Z</recordid><startdate>2022</startdate><enddate>2022</enddate><creator>Reksten, Anita</creator><creator>Thomassen, Magnus</creator><creator>Møller-Holst, Steffen</creator><creator>Sundseth, Kyrre</creator><general>Elsevier</general><scope>3HK</scope></search><sort><creationdate>2022</creationdate><title>Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development</title><author>Reksten, Anita ; Thomassen, Magnus ; Møller-Holst, Steffen ; Sundseth, Kyrre</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-cristin_nora_11250_30285313</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>AEL</topic><topic>Cost prediction</topic><topic>PEM</topic><topic>Water electrolyser</topic><toplevel>online_resources</toplevel><creatorcontrib>Reksten, Anita</creatorcontrib><creatorcontrib>Thomassen, Magnus</creatorcontrib><creatorcontrib>Møller-Holst, Steffen</creatorcontrib><creatorcontrib>Sundseth, Kyrre</creatorcontrib><collection>NORA - Norwegian Open Research Archives</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Reksten, Anita</au><au>Thomassen, Magnus</au><au>Møller-Holst, Steffen</au><au>Sundseth, Kyrre</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development</atitle><date>2022</date><risdate>2022</risdate><abstract>The investment costs of water electrolysis represent one key challenge for the realisation of renewable hydrogen-based energy systems. This work presents a technology cost assessment and outlook towards 2030 for alkaline electrolysers (AEL) and PEM electrolysers (PEMEL) in the MW to GW range taking into consideration the effects of plant size and expected technology developments. Critical selected data was fitted to a modified power law to describe the cost of an electrolyser plant based on the overall capacity and a learning/technology development rate to derive cost estimations for different PEMEL and AEL plant capacities towards 2030. The analysis predicts that the CAPEX gap between AEL and PEMEL technologies will decrease significantly towards 2030 with plant size until 1–10 MW range. Beyond this, only marginal cost reductions can be expected with CAPEX values approaching 320–400 $/kW for large scale (greater than 100 MW) plants by 2030 with subsequent cost reductions possible. Learning rates for electrolysers were estimated at 25–30% for both AEL and PEMEL, which are significantly higher than the learning rates reported in previous literature.</abstract><pub>Elsevier</pub><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_cristin_nora_11250_3028531
source NORA - Norwegian Open Research Archives
subjects AEL
Cost prediction
PEM
Water electrolyser
title Projecting the future cost of PEM and alkaline water electrolysers; a CAPEX model including electrolyser plant size and technology development
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-28T05%3A35%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-cristin_3HK&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Projecting%20the%20future%20cost%20of%20PEM%20and%20alkaline%20water%20electrolysers;%20a%20CAPEX%20model%20including%20electrolyser%20plant%20size%20and%20technology%20development&rft.au=Reksten,%20Anita&rft.date=2022&rft_id=info:doi/&rft_dat=%3Ccristin_3HK%3E11250_3028531%3C/cristin_3HK%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true