Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS
There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall because the tunnel is not covered by soil for shi...
Gespeichert in:
Veröffentlicht in: | Chinese physics C 2011, Vol.35 (1), p.104-108 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 108 |
---|---|
container_issue | 1 |
container_start_page | 104 |
container_title | Chinese physics C |
container_volume | 35 |
creator | 刘剑 王庆斌 吴青彪 马忠剑 |
description | There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall because the tunnel is not covered by soil for shielding. In order to reduce the dose rate at the exit of the cable ducts, we use the ISIS construction, which is designed with four turnings, as a reference for the tunnel design. The thickness of the shielding is obtained by a simulation with the Monte Carlo Code FLUKA. The result is compared with the data obtained with Moyer Mode and the reliability of the simulation is proved. This paper provides the basis for the design of the tunnel. |
doi_str_mv | 10.1088/1674-1137/35/1/022 |
format | Article |
fullrecord | <record><control><sourceid>wanfang_jour_chong</sourceid><recordid>TN_cdi_chongqing_backfile_36350475</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><cqvip_id>36350475</cqvip_id><wanfj_id>zgwl_c201101022</wanfj_id><sourcerecordid>zgwl_c201101022</sourcerecordid><originalsourceid>FETCH-LOGICAL-c329t-882dc8b0046dad4c43f88c98a85cef362933194ddbb5c2392e5af8f202b782e93</originalsourceid><addsrcrecordid>eNqNkLtOwzAUQC0EEqXwA0wRC2II8SNOnBGVp1TBUJgtx480JY2D3aoqX4_TFBYYGKwrXZ1j2QeAcwSvEWQsQVmexgiRPCE0QQnE-ACMIKZpTCDFh2D0AxyDE-8XEGZp8EaA32pfV20kWhWOaLa-9pE10Wquo9W6bXUTSRuGXNVttduWWiylda5W1u20fum7QLj1MpqLpvn2J7Pn2Sk4MqLx-mw_x-Dt_u518hhPXx6eJjfTWBJcrGLGsJKshDDNlFCpTIlhTBZMMCq1IRkuCEFFqlRZUolJgTUVhhkMcZkzrAsyBpfDvRvRGtFWfGHXLvzH889q03CJIUIQhS6BxAMpnfXeacM7Vy-F23IEeR-T961434oTyhEfpHiQatv9j7_6g__F8U6ZwF7sHzS3bfUROvNSyHdTN5qTjFCY5pR8Ac5ujKM</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype></control><display><type>article</type><title>Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS</title><source>IOP Publishing Journals</source><source>Institute of Physics (IOP) Journals - HEAL-Link</source><source>Alma/SFX Local Collection</source><creator>刘剑 王庆斌 吴青彪 马忠剑</creator><creatorcontrib>刘剑 王庆斌 吴青彪 马忠剑</creatorcontrib><description>There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall because the tunnel is not covered by soil for shielding. In order to reduce the dose rate at the exit of the cable ducts, we use the ISIS construction, which is designed with four turnings, as a reference for the tunnel design. The thickness of the shielding is obtained by a simulation with the Monte Carlo Code FLUKA. The result is compared with the data obtained with Moyer Mode and the reliability of the simulation is proved. This paper provides the basis for the design of the tunnel.</description><identifier>ISSN: 1674-1137</identifier><identifier>EISSN: 0254-3052</identifier><identifier>EISSN: 2058-6132</identifier><identifier>DOI: 10.1088/1674-1137/35/1/022</identifier><language>eng</language><publisher>IOP Publishing</publisher><subject>ISIS ; 屏蔽设计 ; 蒙地卡罗 ; 设计参考 ; 谱分析</subject><ispartof>Chinese physics C, 2011, Vol.35 (1), p.104-108</ispartof><rights>Copyright © Wanfang Data Co. Ltd. All Rights Reserved.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><cites>FETCH-LOGICAL-c329t-882dc8b0046dad4c43f88c98a85cef362933194ddbb5c2392e5af8f202b782e93</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Uhttp://image.cqvip.com/vip1000/qk/92043A/92043A.jpg</thumbnail><linktopdf>$$Uhttps://iopscience.iop.org/article/10.1088/1674-1137/35/1/022/pdf$$EPDF$$P50$$Giop$$H</linktopdf><link.rule.ids>314,780,784,4024,27923,27924,27925,53830,53910</link.rule.ids></links><search><creatorcontrib>刘剑 王庆斌 吴青彪 马忠剑</creatorcontrib><title>Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS</title><title>Chinese physics C</title><addtitle>Chinese Physica C</addtitle><description>There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall because the tunnel is not covered by soil for shielding. In order to reduce the dose rate at the exit of the cable ducts, we use the ISIS construction, which is designed with four turnings, as a reference for the tunnel design. The thickness of the shielding is obtained by a simulation with the Monte Carlo Code FLUKA. The result is compared with the data obtained with Moyer Mode and the reliability of the simulation is proved. This paper provides the basis for the design of the tunnel.</description><subject>ISIS</subject><subject>屏蔽设计</subject><subject>蒙地卡罗</subject><subject>设计参考</subject><subject>谱分析</subject><issn>1674-1137</issn><issn>0254-3052</issn><issn>2058-6132</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2011</creationdate><recordtype>article</recordtype><recordid>eNqNkLtOwzAUQC0EEqXwA0wRC2II8SNOnBGVp1TBUJgtx480JY2D3aoqX4_TFBYYGKwrXZ1j2QeAcwSvEWQsQVmexgiRPCE0QQnE-ACMIKZpTCDFh2D0AxyDE-8XEGZp8EaA32pfV20kWhWOaLa-9pE10Wquo9W6bXUTSRuGXNVttduWWiylda5W1u20fum7QLj1MpqLpvn2J7Pn2Sk4MqLx-mw_x-Dt_u518hhPXx6eJjfTWBJcrGLGsJKshDDNlFCpTIlhTBZMMCq1IRkuCEFFqlRZUolJgTUVhhkMcZkzrAsyBpfDvRvRGtFWfGHXLvzH889q03CJIUIQhS6BxAMpnfXeacM7Vy-F23IEeR-T961434oTyhEfpHiQatv9j7_6g__F8U6ZwF7sHzS3bfUROvNSyHdTN5qTjFCY5pR8Ac5ujKM</recordid><startdate>2011</startdate><enddate>2011</enddate><creator>刘剑 王庆斌 吴青彪 马忠剑</creator><general>IOP Publishing</general><general>Institute of High Energy Physics,CAS,Beijing,100049,China</general><scope>2RA</scope><scope>92L</scope><scope>CQIGP</scope><scope>W92</scope><scope>~WA</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>2B.</scope><scope>4A8</scope><scope>92I</scope><scope>93N</scope><scope>PSX</scope><scope>TCJ</scope></search><sort><creationdate>2011</creationdate><title>Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS</title><author>刘剑 王庆斌 吴青彪 马忠剑</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c329t-882dc8b0046dad4c43f88c98a85cef362933194ddbb5c2392e5af8f202b782e93</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2011</creationdate><topic>ISIS</topic><topic>屏蔽设计</topic><topic>蒙地卡罗</topic><topic>设计参考</topic><topic>谱分析</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>刘剑 王庆斌 吴青彪 马忠剑</creatorcontrib><collection>中文科技期刊数据库</collection><collection>中文科技期刊数据库-CALIS站点</collection><collection>中文科技期刊数据库-7.0平台</collection><collection>中文科技期刊数据库-工程技术</collection><collection>中文科技期刊数据库- 镜像站点</collection><collection>CrossRef</collection><collection>Wanfang Data Journals - Hong Kong</collection><collection>WANFANG Data Centre</collection><collection>Wanfang Data Journals</collection><collection>万方数据期刊 - 香港版</collection><collection>China Online Journals (COJ)</collection><collection>China Online Journals (COJ)</collection><jtitle>Chinese physics C</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>刘剑 王庆斌 吴青彪 马忠剑</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS</atitle><jtitle>Chinese physics C</jtitle><addtitle>Chinese Physica C</addtitle><date>2011</date><risdate>2011</risdate><volume>35</volume><issue>1</issue><spage>104</spage><epage>108</epage><pages>104-108</pages><issn>1674-1137</issn><eissn>0254-3052</eissn><eissn>2058-6132</eissn><abstract>There is a tunnel connecting the beamcorridor and the target station in the spectrum hall in the CSNS project. The length of the tunnel is about 20 m. The shielding design of the tunnel is very significant for the persons working in the spectrum hall because the tunnel is not covered by soil for shielding. In order to reduce the dose rate at the exit of the cable ducts, we use the ISIS construction, which is designed with four turnings, as a reference for the tunnel design. The thickness of the shielding is obtained by a simulation with the Monte Carlo Code FLUKA. The result is compared with the data obtained with Moyer Mode and the reliability of the simulation is proved. This paper provides the basis for the design of the tunnel.</abstract><pub>IOP Publishing</pub><doi>10.1088/1674-1137/35/1/022</doi><tpages>5</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1674-1137 |
ispartof | Chinese physics C, 2011, Vol.35 (1), p.104-108 |
issn | 1674-1137 0254-3052 2058-6132 |
language | eng |
recordid | cdi_chongqing_backfile_36350475 |
source | IOP Publishing Journals; Institute of Physics (IOP) Journals - HEAL-Link; Alma/SFX Local Collection |
subjects | ISIS 屏蔽设计 蒙地卡罗 设计参考 谱分析 |
title | Design and analysis of the tunnel connecting the beamcorridor and the spectrum hall of the CSNS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T22%3A03%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-wanfang_jour_chong&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Design%20and%20analysis%20of%20the%20tunnel%20connecting%20the%20beamcorridor%20and%20the%20spectrum%20hall%20of%20the%20CSNS&rft.jtitle=Chinese%20physics%20C&rft.au=%E5%88%98%E5%89%91%20%E7%8E%8B%E5%BA%86%E6%96%8C%20%E5%90%B4%E9%9D%92%E5%BD%AA%20%E9%A9%AC%E5%BF%A0%E5%89%91&rft.date=2011&rft.volume=35&rft.issue=1&rft.spage=104&rft.epage=108&rft.pages=104-108&rft.issn=1674-1137&rft.eissn=0254-3052&rft_id=info:doi/10.1088/1674-1137/35/1/022&rft_dat=%3Cwanfang_jour_chong%3Ezgwl_c201101022%3C/wanfang_jour_chong%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rft_cqvip_id=36350475&rft_wanfj_id=zgwl_c201101022&rfr_iscdi=true |